State Codes and Statutes

Statutes > Nebraska > Chapter46 > 46-1658

46-1658. Alteration of dam; owner; filing requirements; approval to operate; issuance.(1) Upon completion of the alteration of any dam, the owner shall file with the department a completion certification accompanied by supplementary drawings or descriptive matter, as determined by the department, signed and sealed by the design engineer, showing or describing the work as actually completed.(2) An approval to operate shall be issued upon a finding by the department that the dam is safe to impound within the limitations prescribed in the application approval. Pending issuance of a new or revised approval to operate, the owner of the dam shall not cause the dam to impound beyond the limitations prescribed in the existing application approval. SourceLaws 2005, LB 335, § 58.

State Codes and Statutes

Statutes > Nebraska > Chapter46 > 46-1658

46-1658. Alteration of dam; owner; filing requirements; approval to operate; issuance.(1) Upon completion of the alteration of any dam, the owner shall file with the department a completion certification accompanied by supplementary drawings or descriptive matter, as determined by the department, signed and sealed by the design engineer, showing or describing the work as actually completed.(2) An approval to operate shall be issued upon a finding by the department that the dam is safe to impound within the limitations prescribed in the application approval. Pending issuance of a new or revised approval to operate, the owner of the dam shall not cause the dam to impound beyond the limitations prescribed in the existing application approval. SourceLaws 2005, LB 335, § 58.

State Codes and Statutes

State Codes and Statutes

Statutes > Nebraska > Chapter46 > 46-1658

46-1658. Alteration of dam; owner; filing requirements; approval to operate; issuance.(1) Upon completion of the alteration of any dam, the owner shall file with the department a completion certification accompanied by supplementary drawings or descriptive matter, as determined by the department, signed and sealed by the design engineer, showing or describing the work as actually completed.(2) An approval to operate shall be issued upon a finding by the department that the dam is safe to impound within the limitations prescribed in the application approval. Pending issuance of a new or revised approval to operate, the owner of the dam shall not cause the dam to impound beyond the limitations prescribed in the existing application approval. SourceLaws 2005, LB 335, § 58.