State Codes and Statutes

Statutes > Wisconsin > 281 > 281.65

281.65

281.65 Financial assistance; nonpoint source water pollution abatement.

281.65(1)

(1) The purposes of the nonpoint source pollution abatement financial assistance program under this section are to:

281.65(1)(a)

(a) Provide the necessary administrative framework and financial assistance for the implementation of measures to meet nonpoint source water pollution abatement needs identified in areawide water quality management plans.

281.65(1)(b)

(b) Provide coordination with all elements of the state's water quality program in order to ensure that all activities and limited resources are optimally allocated in the achievement of this state's water quality goals.

281.65(1)(c)

(c) Provide technical and financial assistance for the application of necessary nonpoint source water pollution abatement measures.

281.65(1)(d)

(d) Focus limited technical and financial resources in critical geographic locations where nonpoint source related water quality problems and threats are the most severe and control is most feasible.

281.65(1)(e)

(e) Provide for program evaluation, subsequent modifications and recommendations.

281.65(2)

(2) In this section:

281.65(2)(a)

(a) "Best management practices" means practices, techniques or measures, except for dredging, identified in areawide water quality management plans, which are determined to be effective means of preventing or reducing pollutants generated from nonpoint sources, or from the sediments of inland lakes polluted by nonpoint sources, to a level compatible with water quality objectives established under this section and which do not have an adverse impact on fish and wildlife habitat. The practices, techniques or measures include land acquisition, storm sewer rerouting and the removal of structures necessary to install structural urban best management practices, facilities for the handling and treatment of milkhouse wastewater, repair of fences built using grants under this section and measures to prevent or reduce pollutants generated from mine tailings disposal sites for which the department has not approved a plan of operation under s. 289.30.

281.65(2)(am)

(am) "Governmental unit" means any governmental unit including, but not limited to, a county, city, village, town, metropolitan sewerage district created under ss. 200.01 to 200.15 or 200.21 to 200.65, town sanitary district, public inland lake protection and rehabilitation district, regional planning commission or drainage district operating under ch. 89, 1961 stats., or ch. 88. "Governmental unit" does not include the state or any state agency.

281.65(2)(b)

(b) "Nonpoint source" means a land management activity which contributes to runoff, seepage or percolation which adversely affects or threatens the quality of waters of this state and which is not a point source as defined under s. 283.01 (12).

281.65(2)(be)

(be) "Priority lake" means any lake or group of lakes that are identified under sub. (3) (am).

281.65(2)(bs)

(bs) "Priority lake area" means a priority lake and the area surrounding the priority lake designated by the department for the implementation of the nonpoint source pollution abatement project for the priority lake.

281.65(2)(c)

(c) "Priority watershed" means any watershed that is identified under sub. (3) (am) or (4) (cm) or (co).

281.65(2)(d)

(d) "Structural urban best management practices" means detention basins, wet basins, infiltration basins and trenches and wetland basins.

281.65(3)

(3) The land and water conservation board shall do all of the following:

281.65(3)(a)

(a) Review the lists submitted under sub. (4) (c) and (cd) and reports submitted under sub. (4) (c) and (cg).

281.65(3)(am)

(am) Identify priority watersheds and priority lakes as provided in sub. (3m).

281.65(3)(ap)

(ap) Review and approve priority lake and priority watershed plans prepared under sub. (5m) and modifications to those plans prepared under sub. (5s). The board may exempt minor plan modifications from the requirement of board approval.

281.65(3)(at)

(at) Review rules drafted under this section and make recommendations regarding the rules before final approval of the rules by the natural resources board.

281.65(3)(b)

(b) Before September 1 of each even-numbered year, submit to the governor and the department a report that includes all of the following:

281.65(3)(b)1.

1. Recommendations for the amount to be appropriated for the program under this section for the following fiscal biennium.

281.65(3)(b)5.

5. Any changes that the board determines would improve the efficiency or effectiveness of the program under this section.

281.65(3)(bm)

(bm) Whenever the board determines necessary, submit to the governor and the department recommendations concerning changes to the amounts appropriated for the program under this section or recommendations concerning any changes that would improve the efficiency or effectiveness of the program under this section.

281.65(3)(c)

(c) Assist counties and the department to resolve concerns about the program under this section.

281.65(3)(d)

(d) Establish priorities for the allocation of funds in the event that program needs exceed available funding in any fiscal biennium.

281.65(3)(e)

(e) After reviewing a plan submitted under sub. (4) (k), request the building commission to authorize public debt to be contracted in the amount that the board determines to be necessary for the purposes of the program under this section.

281.65(3)(f)

(f) Require the department and the department of agriculture, trade and consumer protection to conduct or contract for another person to conduct any evaluation or audit of the program under this section and of individual priority watershed or priority lake projects that the board determines is necessary.

281.65(3m)

(3m)

281.65(3m)(a)

(a)

281.65(3m)(a)1.

1. No later than July 1, 1998, the board shall identify priority watersheds based on the list submitted under sub. (4) (c) and recommendations by the department and the department of agriculture, trade and consumer protection without regard to any priority watershed designations made before the board acts under this subdivision, except for priority watershed designations under sub. (4) (cm) or (co). The department and the department of agriculture, trade and consumer protection shall limit the number of watersheds that they recommend to the board to the number that they determine will enable the department to comply with sub. (4) (g) 9., assuming that the level of funding for the program under this section remains the same as on October 14, 1997.

281.65(3m)(a)2.

2. If a watershed is designated as a priority watershed before the board acts under subd. 1. and the board does not identify the watershed as a priority watershed under subd. 1., the board shall terminate the watershed's designation as a priority watershed. This subdivision does not apply to priority watershed designations made under sub. (4) (cm) or (co).

281.65(3m)(b)

(b)

281.65(3m)(b)1.

1. No later than July 1, 1998, the board shall identify priority lakes based on the list submitted under sub. (4) (cd) and recommendations by the department and the department of agriculture, trade and consumer protection without regard to any priority lake designations made before the board acts under this subdivision.

281.65(3m)(b)2.

2. If a lake is designated as a priority lake before the board acts under subd. 1. and the board does not identify the lake as a priority lake under subd. 1., the board shall terminate the lake's designation as a priority lake.

281.65(3m)(c)

(c) If the board terminates a priority watershed or priority lake designation under this subsection, the board shall direct the department to eliminate funding for the project in the former priority watershed or priority lake area.

281.65(3m)(d)

(d)

281.65(3m)(d)1.

1. If a watershed is designated as a priority watershed before the board acts under par. (a) 1. and the board identifies the watershed as a priority watershed under par. (a) 1., the board shall direct the department to continue funding for the project in the priority watershed.

281.65(3m)(d)2.

2. If a lake is designated as a priority lake before the board acts under par. (b) 1. and the board identifies the lake as a priority lake under par. (b) 1., the board shall direct the department to continue funding for the project in the priority lake area.

281.65(4)

(4) The department shall:

281.65(4)(a)

(a) Administer the nonpoint source water pollution program under this section.

281.65(4)(am)

(am) Be responsible for the integration of the nonpoint source water pollution abatement program into the state's overall water quality management program.

281.65(4)(ar)

(ar) Serve as the designated state agency with the federal environmental protection agency on all aspects related to the nonpoint source program management requirements of P.L. 100-4, including the development and submittal of the nonpoint source assessment report and management program required under P.L. 100-4, section 316 and preparation of the annual grant application for federal funding from the environmental protection agency to implement that program.

281.65(4)(as)

(as) Consult with the department of agriculture, trade and consumer protection in developing any federal grant application under par. (ar). Every application is subject to s. 16.54 and shall include the proposed expenditures of federal nonpoint source water pollution abatement grant moneys and the allocation of such moneys between the department and the department of agriculture, trade and consumer protection.

281.65(4)(b)

(b) Identify through the areawide water quality management plans provided for under section 208 of the federal water pollution control act, P.L. 92-500, as amended, the designated local management agencies.

281.65(4)(c)

(c) Prepare a list of the watersheds in this state in order of the level of impairment of the waters in each watershed caused by nonpoint source pollution, taking into consideration the location of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A), and submit the list to the board no later than January 1, 1998.

281.65(4)(cd)

(cd) Prepare a list of the lakes in this state in order of the level of impairment of the waters in the lakes caused by nonpoint source pollution, taking into consideration the location of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A), and submit the list to the board no later than January 1, 1998.

281.65(4)(cg)

(cg) Before July 1 of each even-numbered year, submit its recommendations on the matters under sub. (3) (b) 1. and 5. to the land and water conservation board.

281.65(4)(cm)

(cm) Identify watershed areas in the Milwaukee River basin as priority watershed areas, notwithstanding par. (c), and identify the best management practices necessary to meet water quality objectives in those watershed areas. For the purposes of this paragraph, the Kinnickinnic River shall be treated as being within a watershed area in the Milwaukee River basin. The department shall appoint an advisory committee which represents appropriate local interests to assist it in the planning and implementation of projects and best management practices in these watershed areas. The advisory committee shall include a member of the county board from each county with any area in the Milwaukee River basin.

281.65(4)(co)

(co) Identify the Root River watershed as a priority watershed.

281.65(4)(d)

(d) Review and approve the detailed program for implementation prepared by the designated local management agencies identified under par. (b).

281.65(4)(dm)

(dm) Establish water quality objectives for each water basin and for each priority watershed and priority lake and identify the best management practices to achieve the water quality objectives.

281.65(4)(dr)

(dr) Appoint a committee for each priority watershed and priority lake, to advise the department, the department of agriculture, trade and consumer protection and the counties, cities and villages concerning all aspects of the nonpoint source pollution abatement financial assistance program. Each committee shall include at least 2 farmers as members if the priority watershed or priority lake area includes property in agricultural use. Each committee shall include at least 2 representatives of a public inland lake protection and rehabilitation district that is within the priority watershed or priority lake area or, if one does not exist, of riparian property owners. Each committee for a priority watershed or priority lake area with any area in the Milwaukee River basin shall include a member of the county board from each county with any area in that priority watershed or priority lake area.

281.65(4)(e)

(e) Promulgate rules, in consultation with the department of agriculture, trade and consumer protection, as are necessary for the proper execution and administration of the program under this section. Before promulgating rules under this paragraph, the department shall submit the rules to the land and water conservation board for review under sub. (3) (at). The rules shall include standards and specifications concerning best management practices which are required for eligibility for cost-sharing grants under this section. The standards and specifications shall be consistent with the performance standards, prohibitions, conservation practices and technical standards under s. 281.16. The department may waive the standards and specifications in exceptional cases. The rules shall specify which best management practices are cost-effective best management practices. Only persons involved in the administration of the program under this section, persons who are grant recipients or applicants and persons who receive notices of intent to issue orders under s. 281.20 (1) (b) are subject to the rules promulgated under this paragraph. Any rule promulgated under this paragraph which relates or pertains to agricultural practices relating to animal waste handling and treatment is subject to s. 13.565.

281.65(4)(em)

(em) In identifying best management practices under pars. (dm) and (g) 4., identify cost-effective best management practices, as specified under par. (e), except in situations in which the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4)(f)

(f) Administer the distribution of grants and aids to governmental units for local administration and implementation of the program under this section. A grant awarded under this section may be used for cost-sharing for management practices and capital improvements, easements, or other activities determined by the department to satisfy the requirements of this section. A grant under this section to a lake district for a priority lake identified under sub. (3m) (b) 1. may be used for plan preparation, technical assistance, educational and training assistance, and ordinance development and administration. A grant may not be used for promotional items, except for promotional items that are used for informational purposes, such as brochures or videos.

281.65(4)(g)

(g) In cooperation with the department of agriculture, trade and consumer protection and the appropriate governmental unit, prepare priority watershed and priority lakes plans to implement nonpoint source water pollution abatement projects in priority watersheds and priority lake areas. In preparing the plans, the department shall:

281.65(4)(g)1.

1. Conduct the planning process in a cost-effective and timely manner and scale the planning process in accordance with the scale and nature of the pollution problem addressed in the plan.

281.65(4)(g)2.

2. Promote significant participation from the department of agriculture, trade and consumer protection and other state agencies, governmental units and other persons located in any priority watershed or in any priority lake area that is the subject of the plan.

281.65(4)(g)3.

3. Prepare a water resource assessment, set water quality goals and analyze alternative management practices for the area which is the subject of the plan.

281.65(4)(g)4.

4. In cooperation with the department of agriculture, trade and consumer protection, incorporate the appropriate best management practices into the plan.

281.65(4)(g)5.

5. Determine whether any county, city, village or town within the area which is the subject of the plan, as a condition of a grant under this section, should be required to develop a construction site erosion control ordinance under s. 59.693, 60.627, 61.354 or 62.234 or a manure storage ordinance under s. 92.16 in order to meet the water quality goals established in the plan.

281.65(4)(g)6.

6. Determine the specific plan components to be prepared by any appropriate governmental units in the watershed or in the area of the project affecting the priority lake, after determining the technical, financial and staffing capability of that governmental unit.

281.65(4)(g)7.

7. Prepare a project funding list.

281.65(4)(g)8.

8. Establish an implementation plan for each priority watershed and priority lake, including all of the following:

281.65(4)(g)8.a.

a. A list of the best management practices identified under par. (dm) that are most critically needed to achieve water quality objectives in the priority watershed or priority lake.

281.65(4)(g)8.am.

am. Designation as critical sites those sites that are significant sources of nonpoint source pollution upon which best management practices must be implemented in order to obtain a reasonable likelihood that the water quality objectives established under par. (dm) can be achieved.

281.65(4)(g)8.b.

b. A procedure for establishing implementation priorities to meet the needs identified in subd. 8. a. with the highest priority given to significant sources of nonpoint pollution that substantially inhibit the achievement of water quality objectives.

281.65(4)(g)8.c.

c. Consultation with the committee appointed under par. (dr) concerning the implementation plan.

281.65(4)(g)8.d.

d. A requirement to review the implementation plan periodically and to modify the implementation plan to reflect the agreements entered into by landowners and operators to implement best management practices.

281.65(4)(g)8.e.

e. Provisions for public notice and education concerning the implementation plan in the period during which grants are available to governmental units and landowners and operators, in order to achieve the greatest level of voluntary participation.

281.65(4)(g)9.

9. Complete the planning process in all priority watersheds by December 31, 2015.

281.65(4)(h)

(h) Designate a governmental unit to perform the inventory required under sub. (4m) (a).

281.65(4)(i)

(i) Cooperate with the department of agriculture, trade and consumer protection under s. 92.14 (6).

281.65(4)(k)

(k) Before public debt is contracted for projects under this section, prepare a plan for the expenditure of the proceeds of that debt and submit the plan to the land and water conservation board.

281.65(4)(L)

(L) Before September 1 of each year, in consultation with the department of agriculture, trade and consumer protection, submit a budget report to the board that includes anticipated expenditures for projects under this section during the next year, criteria for ending projects under this section and, if anticipated expenditures exceed anticipated funding, a plan for reducing expenditures.

281.65(4)(o)

(o) Annually, in cooperation with the department of agriculture, trade and consumer protection, submit a report on the progress of the program under this section to the land and water conservation board.

281.65(4)(p)

(p) Jointly with the department of agriculture, trade and consumer protection, prepare the plan required under s. 92.14 (13). The department shall review and approve or disapprove the plan and shall notify the land and water conservation board of its final action on the plan. The department shall implement any part of the plan for which the plan gives it responsibility.

281.65(4)(pm)

(pm) Jointly with the department of agriculture, trade and consumer protection, develop the forms required and implement the process under s. 92.14 (14).

281.65(4)(q)

(q) Include the report submitted under sub. (3) (b), along with a request for all resources and any changes necessary to implement each recommendation in the report, in the information that it submits to the department of administration under s. 16.42 for the program under this section.

281.65(4)(s)

(s) Provide staff services to the land and water conservation board.

281.65(4c)

(4c)

281.65(4c)(a)

(a) A governmental unit may request funding under this subsection for a project that is in a priority watershed or priority lake area or a project that is not in a priority watershed or a priority lake area by submitting an application to the department. An application shall be submitted before July 15 to be considered for initial funding in the following year.

281.65(4c)(ae)

(ae) The department shall administer this subsection in a manner that promotes the accelerated implementation of nonpoint source water pollution control that cannot be conducted with funding under s. 92.14 in target areas described in par. (am) 1. that are of the highest priority.

281.65(4c)(am)

(am) The department may select a project for funding under this subsection only if all of the following apply:

281.65(4c)(am)1.

1. The project will implement nonpoint source pollution control in an area that is a target area based on any of the following:

281.65(4c)(am)1.a.

a. The need for compliance with performance standards established by the department under s. 281.16 (2) and (3).

281.65(4c)(am)1.b.

b. The existence of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4c)(am)1.c.

c. The existence of outstanding or exceptional resource waters, as designated by the department under s. 281.15.

281.65(4c)(am)1.d.

d. The existence of threats to public health.

281.65(4c)(am)1.e.

e. The existence of an animal feeding operation that has received a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge.

281.65(4c)(am)1.f.

f. Other water quality concerns of national or statewide importance.

281.65(4c)(am)2.

2. The department, in consultation with the department of agriculture, trade and consumer protection, determines that funding provided under s. 92.14 is insufficient to fund the project.

281.65(4c)(am)3.

3. The project is consistent with priorities identified by the department on a watershed or other geographic basis.

281.65(4c)(am)4.

4. The project is consistent with approved land and water resource management plans under s. 92.10.

281.65(4c)(am)5.

5. The application for the project specifies the watershed, subwatershed or specific site that will be served by the project.

281.65(4c)(b)

(b) The department shall use the system under par. (d) to determine the score of each project for which it receives an application under par. (a) and shall inform the land and water conservation board of the scores no later than September 1 of each year.

281.65(4c)(c)

(c) After determining project scores under par. (b), the department shall notify the land and water conservation board of the projects that the department proposes to select for funding in the following year. The board shall review the proposal and make recommendations to the department. Before November 1 of each year, the department shall select projects for funding under this subsection in the following year. To the extent practicable, within the requirements of this section, the department shall select projects so that projects are distributed evenly around this state.

281.65(4c)(d)

(d) The department shall adopt a scoring system for ranking nonpoint source water pollution abatement projects for which applications are submitted under par. (a). The criteria on which the scoring system is based shall include all of the following:

281.65(4c)(d)1.

1. The extent to which the application proposes to use the cost-effective and appropriate best management practices to achieve water quality goals.

281.65(4c)(d)2.

2. The existence in the project area of an impaired water body that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4c)(d)3.

3. The extent to which the project will result in the attainment of established water quality objectives.

281.65(4c)(d)4.

4. The local interest in and commitment to the project.

281.65(4c)(d)5.

5. The inclusion of a strategy to evaluate the progress toward reaching project goals, including the monitoring of water quality improvements resulting from project activities.

281.65(4c)(d)6.

6. The extent to which the application proposes to use available federal funding.

281.65(4c)(d)7.

7. The extent to which the project is necessary to enable the city of Racine to control storm water discharges as required under 33 USC 1342 (p).

281.65(4c)(f)

(f) A project funded under this subsection may be conducted over a period of one to 3 years, except that the department may approve an extension for one year.

281.65 - ANNOT.

Cross Reference: See also ch. NR 153, Wis. adm. code.

281.65(4e)

(4e)

281.65(4e)(a)

(a) A governmental unit may request funding under this subsection for a project to implement best management practices for animal waste management at an animal feeding operation for which the department has issued a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge.

281.65(4e)(b)

(b) The department may grant a request under par. (a) if it determines that providing funding under this subsection is necessary to protect the waters of the state.

281.65(4e)(bm)

(bm) The department may provide a cost-sharing grant under this subsection directly to a landowner, or to an operator of an animal feeding operation, for a project to implement best management practices for animal waste management at an animal feeding operation for which the department has issued a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge if the department determines that providing funding under this subsection is necessary to protect the waters of the state.

281.65(4e)(c)

(c) Subsection (8) (d) does not apply to a grant under this subsection.

281.65(4g)

(4g) The department may contract with any person from the appropriation account under s. 20.370 (4) (at) for services to administer or implement this section, including information and education and training services. The department shall allocate $500,000 in each fiscal year from the appropriation account under s. 20.370 (4) (at) for contracts for educational and technical assistance related to the program under this section provided by the University of Wisconsin-Extension.

281.65(4m)

(4m)

281.65(4m)(a)

(a) Any governmental unit or regional planning commission designated by the department under sub. (4) (h) shall prepare an inventory of nonpoint source water pollution in the watershed which is the subject of the plan under sub. (4) (g) and submit the inventory to the department for incorporation into the plan.

281.65(4m)(b)

(b) Every plan prepared for an area under sub. (4) (g) shall include all of the following:

281.65(4m)(b)1.

1. The inventory for that area prepared under par. (a).

281.65(4m)(b)2.

2. A water resource assessment of that area.

281.65(4m)(b)3.

3. The identification of critical surface water and groundwater protection management areas within that area and the agricultural and nonagricultural best management practices to be applied to that area.

281.65(4m)(b)4.

4. A plan implementation schedule developed in cooperation with the appropriate governmental unit or designated local management agency identified under sub. (4) (b).

281.65(4m)(b)5.

5. A grant disbursement and project management schedule.

281.65(4m)(b)6.

6. An integrated resource management strategy to protect or enhance fish and wildlife habitat, aesthetics and other natural resources.

281.65(4m)(b)7.

7. A comprehensive management strategy to manage agricultural and nonagricultural nonpoint source water pollution affecting surface water or groundwater, including animal waste, fertilizer, pesticides, storm water, construction site erosion and other nonpoint sources of water pollution.

281.65(4m)(c)

(c) The department shall submit a copy of any plan it completes under this subsection to any county located in or containing any watershed which is a subject of the plan and to the department of agriculture, trade and consumer protection. The department of agriculture, trade and consumer protection shall review the plan and notify the department of natural resources of its comments on the plan. A county receiving a plan under this subsection shall review the plan, approve or disapprove the plan and notify the department of natural resources of its action on the plan.

281.65(4m)(d)

(d) After the department considers the comments of the department of agriculture, trade and consumer protection on a plan under par. (c) and receives approval of the plan by every county to which it was sent and by the land and water conservation board, the department shall designate the plan to be an element of the appropriate areawide water quality management plan under P.L. 92-500, section 208.

281.65(5)

(5) The department of agriculture, trade and consumer protection shall:

281.65(5)(b)

(b) Prepare sections of the priority watershed or priority lake plan relating to farm-specific implementation schedules, requirements under s. 281.16 (3), animal waste management and selection of agriculturally related best management practices and submit those sections to the department for inclusion under sub. (4m) (b). The best management practices shall be cost-effective best management practices, as specified under sub. (4) (e), except in situations in which the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(5)(d)

(d) Develop a grant disbursement and project management schedule for agriculturally related best management practices to be included in a plan established under sub. (4) (g) and identify recommendations for implementing activities or projects under ss. 92.10 and 281.16 (3).

281.65(5)(e)

(e) Identify areas within a priority watershed or priority lake area that are subject to activities required under s. 281.16 (3).

281.65(5)(f)

(f) Provide implementation assistance as identified and approved in the priority watershed or priority lake plan under sub. (4) (g).

281.65(5m)

(5m) Upon completion of plans by the department under sub. (4) (g), the governmental unit or regional planning commission under sub. (4m) and the department of agriculture, trade and consumer protection under sub. (5), and upon receiving the approval of the land and water conservation board, the department shall prepare and approve the final plan for a priority watershed or priority lake.

281.65(5q)

(5q)

281.65(5q)(a)

(a) Notwithstanding sub. (5s), neither the department nor the land and water conservation board may extend funding under this section for a priority watershed or priority lake project beyond the funding termination date that was in effect for the priority watershed or priority lake project on January 1, 2001, except as provided in par. (b).

281.65(5q)(b)

(b) The department may authorize funding to be provided to a landowner under a priority watershed or priority lake project for up to one year after the funding termination date under par. (a) for that project if the department determines that a delay in implementation of best management practices by the landowner was caused by conditions beyond the control of the landowner.

281.65(5s)

(5s) The department may make modifications, including designating additional sites as critical sites, in a priority watershed or priority lake plan with the approval of every county to which the department sent the original plan under sub. (4m) (c) and of the land and water conservation board. If the owner or operator of a site prevails in a final review under sub. (7) or the site is not designated as a critical site in the original plan under sub. (5m) and the pollution is from an agricultural source and is not caused by animal waste, the department may not make a modification designating the site as a critical site unless the designation is based on a substantial increase in pollution from the site, on information about pollution from the site that was not available when the plan was prepared or on a substantial change to the criteria for designating a site as a critical site. This subsection applies to a priority watershed or priority lake plan completed before, on or after August 12, 1993.

281.65(5w)

(5w) After the land and water conservation board approves a priority watershed or priority lake plan or a modification to such a plan that designates a site to be a critical site, the department shall notify the owner or operator of that site of the designation and of the provisions in sub. (7) and either s. 281.20 or, if the pollution is caused primarily by animal waste, ss. NR 243.21 to 243.26, Wis. adm. code.

281.65(5y)

(5y) If the owner or operator of a critical site installs and maintains best management practices as provided under the priority watershed or priority lake plan, the site is no longer a critical site. The owner or operator may discontinue maintenance of a best management practice for a period during which the owner or operator changes the use of the site if the best management practice is not needed for the changed use.

281.65(6)

(6) The appropriate governmental unit is responsible for local administration and implementation of priority watershed and priority lakes projects and shall:

281.65(6)(a)

(a) Be responsible for coordination and implementation of activities necessary to achieve water quality objectives including the development of a detailed program for implementation.

281.65(6)(b)

(b) Utilize, whenever possible, existing staff or contract with existing governmental agencies to utilize that agency's existing staff to provide various field, administrative, planning and other services.

281.65(6)(d)

(d) Participate in the plan preparation under contract with the department. The department shall determine the specific plan components which will be prepared depending upon the technical, financial and staffing capability of the appropriate governmental unit.

281.65(7)

(7)

281.65(7)(a)

(a)

281.65(7)(a)1.

1. The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) may request a review of that designation by filing a written request within 60 days after receiving notice under sub. (5w) with the land conservation committee of the county in which the site is located or, if the site is located in more than one county, with the land conservation committee of the county in which the largest portion of the site is located.

281.65(7)(a)2.

2. A county land conservation committee receiving a request under subd. 1. shall provide the owner or operator with a hearing and shall provide reasonable notice of the hearing to the owner or operator, the department and the department of agriculture, trade and consumer protection. The county land conservation committee shall conduct the hearing under this subdivision as an informal hearing. Section 68.11 (2) does not apply to the hearing. The land conservation committee shall hold the hearing in a place convenient to the owner or operator. Within 60 days after the hearing, the department shall, and the department of agriculture, trade and consumer protection may, submit a report and recommendation to the land conservation committee concerning the issues at the hearing. The land conservation committee may affirm or reverse the designation of the site as a critical site.

281.65(7)(b)

(b) The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) or the department of natural resources may obtain a review of the decision of a county land conservation committee under par. (a) 2. by filing a written request with the land and water conservation board within 60 days after receiving the decision of the county land conservation committee.

281.65(7)(c)

(c) The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) may request a contested case hearing under ch. 227 to review the decision of the land and water conservation board under par. (b) by filing a written request with the department within 60 days after receiving an adverse decision of the land and water conservation board.

281.65(7m)

(7m) The state share of a grant for local administration under this section may not exceed 70% of the cost of the activities for which the grant is provided if the department first provides a grant to fund those activities after June 30, 1998.

281.65(8)

(8) Eligibility for cost-sharing grants under this section shall be determined based on the following:

281.65(8)(a)

(a) Governmental units and individual landowners or operators are eligible for cost-sharing grants.

281.65(8)(b)

(b) Grants may be provided to applicants in priority watershed areas for projects in conformance with approved areawide water quality management plans.

281.65(8)(c)

(c) Grants may be provided to applicants in nonpriority watersheds for projects which are in conformance with areawide water quality management plans and which conform to the purposes specified under sub. (1).

281.65(8)(cm)

(cm) Grants may be provided to applicants for projects affecting priority lakes if the projects are in conformance with areawide water quality management plans and the purposes specified under sub. (1).

281.65(8)(d)

(d) Each cost-sharing grant shall be approved by the designated management agency.

281.65(8)(e)

(e) Grants may only be used for implementing best management practices. Grants for implementing best management practices may only be used for implementing cost-effective best management practices specified under sub. (4) (e) unless an applicant demonstrates that the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(8)(f)

(f) A cost-sharing grant shall equal the percentage of the cost of implementing the best management practice that is determined by the department in providing a cost-sharing grant under sub. (4e) (a) or by the governmental unit submitting the application under sub. (4c) (a) or (4e) (a) and is approved by the board, except that a cost-sharing grant may not exceed 70% of the cost of implementing the best management practice unless par. (gm) applies.

281.65(8)(gm)

(gm) The department in providing a cost-sharing grant under sub. (4e) (a) or a governmental unit submitting the application under sub. (4c) (a) or (4e) (a) may exceed the limit under par. (f) in case of economic hardship, as defined by the department by rule. In providing a grant for a project to achieve compliance with a performance standard or prohibition established under s. 281.16 (3) (a), the department shall provide cost-sharing of 70% of the cost of compliance or 70% to 90% of the cost of compliance in case of economic hardship.

281.65(8)(L)

(L) A grant may not be made to an individual whose name appears on the statewide support lien docket under s. 49.854 (2) (b), unless the individual provides to the department a payment agreement that has been approved by the county child support agency under s. 59.53 (5) and that is consistent with rules promulgated under s. 49.858 (2) (a).

281.65(8)(m)

(m) The department may recognize the value of a conservation easement created under s. 700.40 (2) and donated to the department, or to any person approved by the department, as constituting all or a portion of the landowner's or operator's share of a cost-sharing grant as determined under par. (f).

281.65(8)(n)

(n) The department shall identify by rule the types of cost-shared practices and the minimum grant amounts for cost-sharing grants that require any subsequent owner of the property to maintain the cost-shared practice for the life of the cost-shared practice, as determined by the department.

281.65(8)(o)

(o) The department shall provide grants for animal waste storage facilities in amounts not to exceed an amount specified by the department by rule.

281.65(8)(p)

(p) The department may provide a cost-sharing grant to replace a structure or facility at a new location, rather than to repair or reconstruct the structure or facility, if the relocation reduces water pollution and replacement is cost-effective compared to repairing or reconstructing the structure or facility.

281.65(8b)

(8b) Beginning in 1999, if the department establishes an anticipated cost-share reimbursement amount for a year for a county that receives funding under this section and the county enters into cost-share agreements with landowners or operators that result in reimbursable amounts for the year that exceed the amount established by the department, the county shall provide reimbursement to the landowners or operators in the amount by which the reimbursable amounts exceed the amount established by the department.

281.65(8e)

(8e) The department may not require a person who received a cost-sharing grant to repay the cost-sharing grant on the basis of a violation of this section, rules promulgated under this section or the grant agreement, if, at the time of the violation, the person who received the grant no longer owns or operates the land for which the department provided the grant. This subsection applies without regard to whether the person received the grant before, on or after May 16, 1992.

281.65(8m)

(8m) If the department determines under sub. (4) (g) 5. that a county, city, village or town should be required to develop a construction site erosion control ordinance under s. 59.693, 60.627, 61.354 or 62.234 or a manure storage ordinance under s. 92.16, that county, city, village or town shall make a commitment to develop and adopt the ordinance as a condition of receiving a grant under this section.

281.65(9)

(9) The department may distribute grants and aids to state agencies, including itself, for administration and implementation of the nonpoint source water pollution abatement program on land under state ownership or control for projects affecting priority lakes or in priority watershed areas. The department may distribute grants and aids to itself for the purchase of easements in priority watershed areas.

281.65(11)

(11) Notwithstanding subs. (3) (am) and (3m), the South Fork of the Hay River is a priority watershed for the period ending on June 30, 2005. Notwithstanding subs. (2) (a), (4) (dm), (e), (em) and (g) 4., (4m) (b) 3. and (8) (b) and (e), the department, in consultation with the local units of government involved with the priority watershed project, shall establish guidelines for the types of nonpoint source water pollution abatement practices to be eligible for cost-sharing grants in the watershed. Notwithstanding sub. (8) (f), the amount of a cost-sharing grant in the watershed may be based on the amount of pollution reduction achieved rather than on the cost of the practices installed, using guidelines developed by the department, in consultation with the local units of government involved with the priority watershed project. In providing funding under s. 92.14 (3), the department of agriculture, trade and consumer protection shall determine the amount of matching funds required for staff for the priority watershed project as though the funding termination date of June 30, 2005, had been in effect on October 6, 1998. The department and the local governmental staff involved with the priority watershed project shall evaluate the cost effectiveness of the project and the reduction in nonpoint source water pollution associated with the project.

281.65(12)

(12) Notwithstanding sub. (8), during fiscal year 2002-03, the department shall make a payment under this section to a landowner who received a notice of discharge under ch. 283, who entered into a cost-share agreement with the department of agriculture, trade and consumer protection for a grant under s. 92.14 (4) (c), 1997 stats., and who complied with the cost-share agreement but who did not receive the grant under s. 92.14 (4) (c), 1997 stats. The department shall make a payment under this subsection in the amount to which the landowner would have been entitled under the cost-share agreement with the department of agriculture, trade and consumer protection. The department may not require a landowner to file an application to receive payment under this subsection.

281.65 - ANNOT.

History: 1977 c. 418; 1979 c. 34, 221; 1979 c. 355 s. 241; 1981 c. 20; 1981 c. 346 s. 38; 1983 a. 27; 1983 a. 189 s. 329 (16); 1983 a. 416; 1985 a. 29; 1987 a. 27; 1989 a. 31, 336, 366; 1991 a. 39, 309; 1993 a. 16, 166, 213, 246, 491; 1995 a. 27, 201, 225; 1995 a. 227 s. 428; Stats. 1995 s. 281.65; 1995 a. 404 s. 204; 1997 a. 27, 209, 237; 1999 a. 9; 1999 a. 150 s. 672; 2001 a. 16, 109; 2003 a. 33; 2007 a. 20; 2009 a. 28.

281.65 - ANNOT.

Cross Reference: See also chs. NR 120 and 151, Wis. adm. code.

State Codes and Statutes

Statutes > Wisconsin > 281 > 281.65

281.65

281.65 Financial assistance; nonpoint source water pollution abatement.

281.65(1)

(1) The purposes of the nonpoint source pollution abatement financial assistance program under this section are to:

281.65(1)(a)

(a) Provide the necessary administrative framework and financial assistance for the implementation of measures to meet nonpoint source water pollution abatement needs identified in areawide water quality management plans.

281.65(1)(b)

(b) Provide coordination with all elements of the state's water quality program in order to ensure that all activities and limited resources are optimally allocated in the achievement of this state's water quality goals.

281.65(1)(c)

(c) Provide technical and financial assistance for the application of necessary nonpoint source water pollution abatement measures.

281.65(1)(d)

(d) Focus limited technical and financial resources in critical geographic locations where nonpoint source related water quality problems and threats are the most severe and control is most feasible.

281.65(1)(e)

(e) Provide for program evaluation, subsequent modifications and recommendations.

281.65(2)

(2) In this section:

281.65(2)(a)

(a) "Best management practices" means practices, techniques or measures, except for dredging, identified in areawide water quality management plans, which are determined to be effective means of preventing or reducing pollutants generated from nonpoint sources, or from the sediments of inland lakes polluted by nonpoint sources, to a level compatible with water quality objectives established under this section and which do not have an adverse impact on fish and wildlife habitat. The practices, techniques or measures include land acquisition, storm sewer rerouting and the removal of structures necessary to install structural urban best management practices, facilities for the handling and treatment of milkhouse wastewater, repair of fences built using grants under this section and measures to prevent or reduce pollutants generated from mine tailings disposal sites for which the department has not approved a plan of operation under s. 289.30.

281.65(2)(am)

(am) "Governmental unit" means any governmental unit including, but not limited to, a county, city, village, town, metropolitan sewerage district created under ss. 200.01 to 200.15 or 200.21 to 200.65, town sanitary district, public inland lake protection and rehabilitation district, regional planning commission or drainage district operating under ch. 89, 1961 stats., or ch. 88. "Governmental unit" does not include the state or any state agency.

281.65(2)(b)

(b) "Nonpoint source" means a land management activity which contributes to runoff, seepage or percolation which adversely affects or threatens the quality of waters of this state and which is not a point source as defined under s. 283.01 (12).

281.65(2)(be)

(be) "Priority lake" means any lake or group of lakes that are identified under sub. (3) (am).

281.65(2)(bs)

(bs) "Priority lake area" means a priority lake and the area surrounding the priority lake designated by the department for the implementation of the nonpoint source pollution abatement project for the priority lake.

281.65(2)(c)

(c) "Priority watershed" means any watershed that is identified under sub. (3) (am) or (4) (cm) or (co).

281.65(2)(d)

(d) "Structural urban best management practices" means detention basins, wet basins, infiltration basins and trenches and wetland basins.

281.65(3)

(3) The land and water conservation board shall do all of the following:

281.65(3)(a)

(a) Review the lists submitted under sub. (4) (c) and (cd) and reports submitted under sub. (4) (c) and (cg).

281.65(3)(am)

(am) Identify priority watersheds and priority lakes as provided in sub. (3m).

281.65(3)(ap)

(ap) Review and approve priority lake and priority watershed plans prepared under sub. (5m) and modifications to those plans prepared under sub. (5s). The board may exempt minor plan modifications from the requirement of board approval.

281.65(3)(at)

(at) Review rules drafted under this section and make recommendations regarding the rules before final approval of the rules by the natural resources board.

281.65(3)(b)

(b) Before September 1 of each even-numbered year, submit to the governor and the department a report that includes all of the following:

281.65(3)(b)1.

1. Recommendations for the amount to be appropriated for the program under this section for the following fiscal biennium.

281.65(3)(b)5.

5. Any changes that the board determines would improve the efficiency or effectiveness of the program under this section.

281.65(3)(bm)

(bm) Whenever the board determines necessary, submit to the governor and the department recommendations concerning changes to the amounts appropriated for the program under this section or recommendations concerning any changes that would improve the efficiency or effectiveness of the program under this section.

281.65(3)(c)

(c) Assist counties and the department to resolve concerns about the program under this section.

281.65(3)(d)

(d) Establish priorities for the allocation of funds in the event that program needs exceed available funding in any fiscal biennium.

281.65(3)(e)

(e) After reviewing a plan submitted under sub. (4) (k), request the building commission to authorize public debt to be contracted in the amount that the board determines to be necessary for the purposes of the program under this section.

281.65(3)(f)

(f) Require the department and the department of agriculture, trade and consumer protection to conduct or contract for another person to conduct any evaluation or audit of the program under this section and of individual priority watershed or priority lake projects that the board determines is necessary.

281.65(3m)

(3m)

281.65(3m)(a)

(a)

281.65(3m)(a)1.

1. No later than July 1, 1998, the board shall identify priority watersheds based on the list submitted under sub. (4) (c) and recommendations by the department and the department of agriculture, trade and consumer protection without regard to any priority watershed designations made before the board acts under this subdivision, except for priority watershed designations under sub. (4) (cm) or (co). The department and the department of agriculture, trade and consumer protection shall limit the number of watersheds that they recommend to the board to the number that they determine will enable the department to comply with sub. (4) (g) 9., assuming that the level of funding for the program under this section remains the same as on October 14, 1997.

281.65(3m)(a)2.

2. If a watershed is designated as a priority watershed before the board acts under subd. 1. and the board does not identify the watershed as a priority watershed under subd. 1., the board shall terminate the watershed's designation as a priority watershed. This subdivision does not apply to priority watershed designations made under sub. (4) (cm) or (co).

281.65(3m)(b)

(b)

281.65(3m)(b)1.

1. No later than July 1, 1998, the board shall identify priority lakes based on the list submitted under sub. (4) (cd) and recommendations by the department and the department of agriculture, trade and consumer protection without regard to any priority lake designations made before the board acts under this subdivision.

281.65(3m)(b)2.

2. If a lake is designated as a priority lake before the board acts under subd. 1. and the board does not identify the lake as a priority lake under subd. 1., the board shall terminate the lake's designation as a priority lake.

281.65(3m)(c)

(c) If the board terminates a priority watershed or priority lake designation under this subsection, the board shall direct the department to eliminate funding for the project in the former priority watershed or priority lake area.

281.65(3m)(d)

(d)

281.65(3m)(d)1.

1. If a watershed is designated as a priority watershed before the board acts under par. (a) 1. and the board identifies the watershed as a priority watershed under par. (a) 1., the board shall direct the department to continue funding for the project in the priority watershed.

281.65(3m)(d)2.

2. If a lake is designated as a priority lake before the board acts under par. (b) 1. and the board identifies the lake as a priority lake under par. (b) 1., the board shall direct the department to continue funding for the project in the priority lake area.

281.65(4)

(4) The department shall:

281.65(4)(a)

(a) Administer the nonpoint source water pollution program under this section.

281.65(4)(am)

(am) Be responsible for the integration of the nonpoint source water pollution abatement program into the state's overall water quality management program.

281.65(4)(ar)

(ar) Serve as the designated state agency with the federal environmental protection agency on all aspects related to the nonpoint source program management requirements of P.L. 100-4, including the development and submittal of the nonpoint source assessment report and management program required under P.L. 100-4, section 316 and preparation of the annual grant application for federal funding from the environmental protection agency to implement that program.

281.65(4)(as)

(as) Consult with the department of agriculture, trade and consumer protection in developing any federal grant application under par. (ar). Every application is subject to s. 16.54 and shall include the proposed expenditures of federal nonpoint source water pollution abatement grant moneys and the allocation of such moneys between the department and the department of agriculture, trade and consumer protection.

281.65(4)(b)

(b) Identify through the areawide water quality management plans provided for under section 208 of the federal water pollution control act, P.L. 92-500, as amended, the designated local management agencies.

281.65(4)(c)

(c) Prepare a list of the watersheds in this state in order of the level of impairment of the waters in each watershed caused by nonpoint source pollution, taking into consideration the location of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A), and submit the list to the board no later than January 1, 1998.

281.65(4)(cd)

(cd) Prepare a list of the lakes in this state in order of the level of impairment of the waters in the lakes caused by nonpoint source pollution, taking into consideration the location of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A), and submit the list to the board no later than January 1, 1998.

281.65(4)(cg)

(cg) Before July 1 of each even-numbered year, submit its recommendations on the matters under sub. (3) (b) 1. and 5. to the land and water conservation board.

281.65(4)(cm)

(cm) Identify watershed areas in the Milwaukee River basin as priority watershed areas, notwithstanding par. (c), and identify the best management practices necessary to meet water quality objectives in those watershed areas. For the purposes of this paragraph, the Kinnickinnic River shall be treated as being within a watershed area in the Milwaukee River basin. The department shall appoint an advisory committee which represents appropriate local interests to assist it in the planning and implementation of projects and best management practices in these watershed areas. The advisory committee shall include a member of the county board from each county with any area in the Milwaukee River basin.

281.65(4)(co)

(co) Identify the Root River watershed as a priority watershed.

281.65(4)(d)

(d) Review and approve the detailed program for implementation prepared by the designated local management agencies identified under par. (b).

281.65(4)(dm)

(dm) Establish water quality objectives for each water basin and for each priority watershed and priority lake and identify the best management practices to achieve the water quality objectives.

281.65(4)(dr)

(dr) Appoint a committee for each priority watershed and priority lake, to advise the department, the department of agriculture, trade and consumer protection and the counties, cities and villages concerning all aspects of the nonpoint source pollution abatement financial assistance program. Each committee shall include at least 2 farmers as members if the priority watershed or priority lake area includes property in agricultural use. Each committee shall include at least 2 representatives of a public inland lake protection and rehabilitation district that is within the priority watershed or priority lake area or, if one does not exist, of riparian property owners. Each committee for a priority watershed or priority lake area with any area in the Milwaukee River basin shall include a member of the county board from each county with any area in that priority watershed or priority lake area.

281.65(4)(e)

(e) Promulgate rules, in consultation with the department of agriculture, trade and consumer protection, as are necessary for the proper execution and administration of the program under this section. Before promulgating rules under this paragraph, the department shall submit the rules to the land and water conservation board for review under sub. (3) (at). The rules shall include standards and specifications concerning best management practices which are required for eligibility for cost-sharing grants under this section. The standards and specifications shall be consistent with the performance standards, prohibitions, conservation practices and technical standards under s. 281.16. The department may waive the standards and specifications in exceptional cases. The rules shall specify which best management practices are cost-effective best management practices. Only persons involved in the administration of the program under this section, persons who are grant recipients or applicants and persons who receive notices of intent to issue orders under s. 281.20 (1) (b) are subject to the rules promulgated under this paragraph. Any rule promulgated under this paragraph which relates or pertains to agricultural practices relating to animal waste handling and treatment is subject to s. 13.565.

281.65(4)(em)

(em) In identifying best management practices under pars. (dm) and (g) 4., identify cost-effective best management practices, as specified under par. (e), except in situations in which the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4)(f)

(f) Administer the distribution of grants and aids to governmental units for local administration and implementation of the program under this section. A grant awarded under this section may be used for cost-sharing for management practices and capital improvements, easements, or other activities determined by the department to satisfy the requirements of this section. A grant under this section to a lake district for a priority lake identified under sub. (3m) (b) 1. may be used for plan preparation, technical assistance, educational and training assistance, and ordinance development and administration. A grant may not be used for promotional items, except for promotional items that are used for informational purposes, such as brochures or videos.

281.65(4)(g)

(g) In cooperation with the department of agriculture, trade and consumer protection and the appropriate governmental unit, prepare priority watershed and priority lakes plans to implement nonpoint source water pollution abatement projects in priority watersheds and priority lake areas. In preparing the plans, the department shall:

281.65(4)(g)1.

1. Conduct the planning process in a cost-effective and timely manner and scale the planning process in accordance with the scale and nature of the pollution problem addressed in the plan.

281.65(4)(g)2.

2. Promote significant participation from the department of agriculture, trade and consumer protection and other state agencies, governmental units and other persons located in any priority watershed or in any priority lake area that is the subject of the plan.

281.65(4)(g)3.

3. Prepare a water resource assessment, set water quality goals and analyze alternative management practices for the area which is the subject of the plan.

281.65(4)(g)4.

4. In cooperation with the department of agriculture, trade and consumer protection, incorporate the appropriate best management practices into the plan.

281.65(4)(g)5.

5. Determine whether any county, city, village or town within the area which is the subject of the plan, as a condition of a grant under this section, should be required to develop a construction site erosion control ordinance under s. 59.693, 60.627, 61.354 or 62.234 or a manure storage ordinance under s. 92.16 in order to meet the water quality goals established in the plan.

281.65(4)(g)6.

6. Determine the specific plan components to be prepared by any appropriate governmental units in the watershed or in the area of the project affecting the priority lake, after determining the technical, financial and staffing capability of that governmental unit.

281.65(4)(g)7.

7. Prepare a project funding list.

281.65(4)(g)8.

8. Establish an implementation plan for each priority watershed and priority lake, including all of the following:

281.65(4)(g)8.a.

a. A list of the best management practices identified under par. (dm) that are most critically needed to achieve water quality objectives in the priority watershed or priority lake.

281.65(4)(g)8.am.

am. Designation as critical sites those sites that are significant sources of nonpoint source pollution upon which best management practices must be implemented in order to obtain a reasonable likelihood that the water quality objectives established under par. (dm) can be achieved.

281.65(4)(g)8.b.

b. A procedure for establishing implementation priorities to meet the needs identified in subd. 8. a. with the highest priority given to significant sources of nonpoint pollution that substantially inhibit the achievement of water quality objectives.

281.65(4)(g)8.c.

c. Consultation with the committee appointed under par. (dr) concerning the implementation plan.

281.65(4)(g)8.d.

d. A requirement to review the implementation plan periodically and to modify the implementation plan to reflect the agreements entered into by landowners and operators to implement best management practices.

281.65(4)(g)8.e.

e. Provisions for public notice and education concerning the implementation plan in the period during which grants are available to governmental units and landowners and operators, in order to achieve the greatest level of voluntary participation.

281.65(4)(g)9.

9. Complete the planning process in all priority watersheds by December 31, 2015.

281.65(4)(h)

(h) Designate a governmental unit to perform the inventory required under sub. (4m) (a).

281.65(4)(i)

(i) Cooperate with the department of agriculture, trade and consumer protection under s. 92.14 (6).

281.65(4)(k)

(k) Before public debt is contracted for projects under this section, prepare a plan for the expenditure of the proceeds of that debt and submit the plan to the land and water conservation board.

281.65(4)(L)

(L) Before September 1 of each year, in consultation with the department of agriculture, trade and consumer protection, submit a budget report to the board that includes anticipated expenditures for projects under this section during the next year, criteria for ending projects under this section and, if anticipated expenditures exceed anticipated funding, a plan for reducing expenditures.

281.65(4)(o)

(o) Annually, in cooperation with the department of agriculture, trade and consumer protection, submit a report on the progress of the program under this section to the land and water conservation board.

281.65(4)(p)

(p) Jointly with the department of agriculture, trade and consumer protection, prepare the plan required under s. 92.14 (13). The department shall review and approve or disapprove the plan and shall notify the land and water conservation board of its final action on the plan. The department shall implement any part of the plan for which the plan gives it responsibility.

281.65(4)(pm)

(pm) Jointly with the department of agriculture, trade and consumer protection, develop the forms required and implement the process under s. 92.14 (14).

281.65(4)(q)

(q) Include the report submitted under sub. (3) (b), along with a request for all resources and any changes necessary to implement each recommendation in the report, in the information that it submits to the department of administration under s. 16.42 for the program under this section.

281.65(4)(s)

(s) Provide staff services to the land and water conservation board.

281.65(4c)

(4c)

281.65(4c)(a)

(a) A governmental unit may request funding under this subsection for a project that is in a priority watershed or priority lake area or a project that is not in a priority watershed or a priority lake area by submitting an application to the department. An application shall be submitted before July 15 to be considered for initial funding in the following year.

281.65(4c)(ae)

(ae) The department shall administer this subsection in a manner that promotes the accelerated implementation of nonpoint source water pollution control that cannot be conducted with funding under s. 92.14 in target areas described in par. (am) 1. that are of the highest priority.

281.65(4c)(am)

(am) The department may select a project for funding under this subsection only if all of the following apply:

281.65(4c)(am)1.

1. The project will implement nonpoint source pollution control in an area that is a target area based on any of the following:

281.65(4c)(am)1.a.

a. The need for compliance with performance standards established by the department under s. 281.16 (2) and (3).

281.65(4c)(am)1.b.

b. The existence of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4c)(am)1.c.

c. The existence of outstanding or exceptional resource waters, as designated by the department under s. 281.15.

281.65(4c)(am)1.d.

d. The existence of threats to public health.

281.65(4c)(am)1.e.

e. The existence of an animal feeding operation that has received a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge.

281.65(4c)(am)1.f.

f. Other water quality concerns of national or statewide importance.

281.65(4c)(am)2.

2. The department, in consultation with the department of agriculture, trade and consumer protection, determines that funding provided under s. 92.14 is insufficient to fund the project.

281.65(4c)(am)3.

3. The project is consistent with priorities identified by the department on a watershed or other geographic basis.

281.65(4c)(am)4.

4. The project is consistent with approved land and water resource management plans under s. 92.10.

281.65(4c)(am)5.

5. The application for the project specifies the watershed, subwatershed or specific site that will be served by the project.

281.65(4c)(b)

(b) The department shall use the system under par. (d) to determine the score of each project for which it receives an application under par. (a) and shall inform the land and water conservation board of the scores no later than September 1 of each year.

281.65(4c)(c)

(c) After determining project scores under par. (b), the department shall notify the land and water conservation board of the projects that the department proposes to select for funding in the following year. The board shall review the proposal and make recommendations to the department. Before November 1 of each year, the department shall select projects for funding under this subsection in the following year. To the extent practicable, within the requirements of this section, the department shall select projects so that projects are distributed evenly around this state.

281.65(4c)(d)

(d) The department shall adopt a scoring system for ranking nonpoint source water pollution abatement projects for which applications are submitted under par. (a). The criteria on which the scoring system is based shall include all of the following:

281.65(4c)(d)1.

1. The extent to which the application proposes to use the cost-effective and appropriate best management practices to achieve water quality goals.

281.65(4c)(d)2.

2. The existence in the project area of an impaired water body that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4c)(d)3.

3. The extent to which the project will result in the attainment of established water quality objectives.

281.65(4c)(d)4.

4. The local interest in and commitment to the project.

281.65(4c)(d)5.

5. The inclusion of a strategy to evaluate the progress toward reaching project goals, including the monitoring of water quality improvements resulting from project activities.

281.65(4c)(d)6.

6. The extent to which the application proposes to use available federal funding.

281.65(4c)(d)7.

7. The extent to which the project is necessary to enable the city of Racine to control storm water discharges as required under 33 USC 1342 (p).

281.65(4c)(f)

(f) A project funded under this subsection may be conducted over a period of one to 3 years, except that the department may approve an extension for one year.

281.65 - ANNOT.

Cross Reference: See also ch. NR 153, Wis. adm. code.

281.65(4e)

(4e)

281.65(4e)(a)

(a) A governmental unit may request funding under this subsection for a project to implement best management practices for animal waste management at an animal feeding operation for which the department has issued a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge.

281.65(4e)(b)

(b) The department may grant a request under par. (a) if it determines that providing funding under this subsection is necessary to protect the waters of the state.

281.65(4e)(bm)

(bm) The department may provide a cost-sharing grant under this subsection directly to a landowner, or to an operator of an animal feeding operation, for a project to implement best management practices for animal waste management at an animal feeding operation for which the department has issued a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge if the department determines that providing funding under this subsection is necessary to protect the waters of the state.

281.65(4e)(c)

(c) Subsection (8) (d) does not apply to a grant under this subsection.

281.65(4g)

(4g) The department may contract with any person from the appropriation account under s. 20.370 (4) (at) for services to administer or implement this section, including information and education and training services. The department shall allocate $500,000 in each fiscal year from the appropriation account under s. 20.370 (4) (at) for contracts for educational and technical assistance related to the program under this section provided by the University of Wisconsin-Extension.

281.65(4m)

(4m)

281.65(4m)(a)

(a) Any governmental unit or regional planning commission designated by the department under sub. (4) (h) shall prepare an inventory of nonpoint source water pollution in the watershed which is the subject of the plan under sub. (4) (g) and submit the inventory to the department for incorporation into the plan.

281.65(4m)(b)

(b) Every plan prepared for an area under sub. (4) (g) shall include all of the following:

281.65(4m)(b)1.

1. The inventory for that area prepared under par. (a).

281.65(4m)(b)2.

2. A water resource assessment of that area.

281.65(4m)(b)3.

3. The identification of critical surface water and groundwater protection management areas within that area and the agricultural and nonagricultural best management practices to be applied to that area.

281.65(4m)(b)4.

4. A plan implementation schedule developed in cooperation with the appropriate governmental unit or designated local management agency identified under sub. (4) (b).

281.65(4m)(b)5.

5. A grant disbursement and project management schedule.

281.65(4m)(b)6.

6. An integrated resource management strategy to protect or enhance fish and wildlife habitat, aesthetics and other natural resources.

281.65(4m)(b)7.

7. A comprehensive management strategy to manage agricultural and nonagricultural nonpoint source water pollution affecting surface water or groundwater, including animal waste, fertilizer, pesticides, storm water, construction site erosion and other nonpoint sources of water pollution.

281.65(4m)(c)

(c) The department shall submit a copy of any plan it completes under this subsection to any county located in or containing any watershed which is a subject of the plan and to the department of agriculture, trade and consumer protection. The department of agriculture, trade and consumer protection shall review the plan and notify the department of natural resources of its comments on the plan. A county receiving a plan under this subsection shall review the plan, approve or disapprove the plan and notify the department of natural resources of its action on the plan.

281.65(4m)(d)

(d) After the department considers the comments of the department of agriculture, trade and consumer protection on a plan under par. (c) and receives approval of the plan by every county to which it was sent and by the land and water conservation board, the department shall designate the plan to be an element of the appropriate areawide water quality management plan under P.L. 92-500, section 208.

281.65(5)

(5) The department of agriculture, trade and consumer protection shall:

281.65(5)(b)

(b) Prepare sections of the priority watershed or priority lake plan relating to farm-specific implementation schedules, requirements under s. 281.16 (3), animal waste management and selection of agriculturally related best management practices and submit those sections to the department for inclusion under sub. (4m) (b). The best management practices shall be cost-effective best management practices, as specified under sub. (4) (e), except in situations in which the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(5)(d)

(d) Develop a grant disbursement and project management schedule for agriculturally related best management practices to be included in a plan established under sub. (4) (g) and identify recommendations for implementing activities or projects under ss. 92.10 and 281.16 (3).

281.65(5)(e)

(e) Identify areas within a priority watershed or priority lake area that are subject to activities required under s. 281.16 (3).

281.65(5)(f)

(f) Provide implementation assistance as identified and approved in the priority watershed or priority lake plan under sub. (4) (g).

281.65(5m)

(5m) Upon completion of plans by the department under sub. (4) (g), the governmental unit or regional planning commission under sub. (4m) and the department of agriculture, trade and consumer protection under sub. (5), and upon receiving the approval of the land and water conservation board, the department shall prepare and approve the final plan for a priority watershed or priority lake.

281.65(5q)

(5q)

281.65(5q)(a)

(a) Notwithstanding sub. (5s), neither the department nor the land and water conservation board may extend funding under this section for a priority watershed or priority lake project beyond the funding termination date that was in effect for the priority watershed or priority lake project on January 1, 2001, except as provided in par. (b).

281.65(5q)(b)

(b) The department may authorize funding to be provided to a landowner under a priority watershed or priority lake project for up to one year after the funding termination date under par. (a) for that project if the department determines that a delay in implementation of best management practices by the landowner was caused by conditions beyond the control of the landowner.

281.65(5s)

(5s) The department may make modifications, including designating additional sites as critical sites, in a priority watershed or priority lake plan with the approval of every county to which the department sent the original plan under sub. (4m) (c) and of the land and water conservation board. If the owner or operator of a site prevails in a final review under sub. (7) or the site is not designated as a critical site in the original plan under sub. (5m) and the pollution is from an agricultural source and is not caused by animal waste, the department may not make a modification designating the site as a critical site unless the designation is based on a substantial increase in pollution from the site, on information about pollution from the site that was not available when the plan was prepared or on a substantial change to the criteria for designating a site as a critical site. This subsection applies to a priority watershed or priority lake plan completed before, on or after August 12, 1993.

281.65(5w)

(5w) After the land and water conservation board approves a priority watershed or priority lake plan or a modification to such a plan that designates a site to be a critical site, the department shall notify the owner or operator of that site of the designation and of the provisions in sub. (7) and either s. 281.20 or, if the pollution is caused primarily by animal waste, ss. NR 243.21 to 243.26, Wis. adm. code.

281.65(5y)

(5y) If the owner or operator of a critical site installs and maintains best management practices as provided under the priority watershed or priority lake plan, the site is no longer a critical site. The owner or operator may discontinue maintenance of a best management practice for a period during which the owner or operator changes the use of the site if the best management practice is not needed for the changed use.

281.65(6)

(6) The appropriate governmental unit is responsible for local administration and implementation of priority watershed and priority lakes projects and shall:

281.65(6)(a)

(a) Be responsible for coordination and implementation of activities necessary to achieve water quality objectives including the development of a detailed program for implementation.

281.65(6)(b)

(b) Utilize, whenever possible, existing staff or contract with existing governmental agencies to utilize that agency's existing staff to provide various field, administrative, planning and other services.

281.65(6)(d)

(d) Participate in the plan preparation under contract with the department. The department shall determine the specific plan components which will be prepared depending upon the technical, financial and staffing capability of the appropriate governmental unit.

281.65(7)

(7)

281.65(7)(a)

(a)

281.65(7)(a)1.

1. The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) may request a review of that designation by filing a written request within 60 days after receiving notice under sub. (5w) with the land conservation committee of the county in which the site is located or, if the site is located in more than one county, with the land conservation committee of the county in which the largest portion of the site is located.

281.65(7)(a)2.

2. A county land conservation committee receiving a request under subd. 1. shall provide the owner or operator with a hearing and shall provide reasonable notice of the hearing to the owner or operator, the department and the department of agriculture, trade and consumer protection. The county land conservation committee shall conduct the hearing under this subdivision as an informal hearing. Section 68.11 (2) does not apply to the hearing. The land conservation committee shall hold the hearing in a place convenient to the owner or operator. Within 60 days after the hearing, the department shall, and the department of agriculture, trade and consumer protection may, submit a report and recommendation to the land conservation committee concerning the issues at the hearing. The land conservation committee may affirm or reverse the designation of the site as a critical site.

281.65(7)(b)

(b) The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) or the department of natural resources may obtain a review of the decision of a county land conservation committee under par. (a) 2. by filing a written request with the land and water conservation board within 60 days after receiving the decision of the county land conservation committee.

281.65(7)(c)

(c) The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) may request a contested case hearing under ch. 227 to review the decision of the land and water conservation board under par. (b) by filing a written request with the department within 60 days after receiving an adverse decision of the land and water conservation board.

281.65(7m)

(7m) The state share of a grant for local administration under this section may not exceed 70% of the cost of the activities for which the grant is provided if the department first provides a grant to fund those activities after June 30, 1998.

281.65(8)

(8) Eligibility for cost-sharing grants under this section shall be determined based on the following:

281.65(8)(a)

(a) Governmental units and individual landowners or operators are eligible for cost-sharing grants.

281.65(8)(b)

(b) Grants may be provided to applicants in priority watershed areas for projects in conformance with approved areawide water quality management plans.

281.65(8)(c)

(c) Grants may be provided to applicants in nonpriority watersheds for projects which are in conformance with areawide water quality management plans and which conform to the purposes specified under sub. (1).

281.65(8)(cm)

(cm) Grants may be provided to applicants for projects affecting priority lakes if the projects are in conformance with areawide water quality management plans and the purposes specified under sub. (1).

281.65(8)(d)

(d) Each cost-sharing grant shall be approved by the designated management agency.

281.65(8)(e)

(e) Grants may only be used for implementing best management practices. Grants for implementing best management practices may only be used for implementing cost-effective best management practices specified under sub. (4) (e) unless an applicant demonstrates that the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(8)(f)

(f) A cost-sharing grant shall equal the percentage of the cost of implementing the best management practice that is determined by the department in providing a cost-sharing grant under sub. (4e) (a) or by the governmental unit submitting the application under sub. (4c) (a) or (4e) (a) and is approved by the board, except that a cost-sharing grant may not exceed 70% of the cost of implementing the best management practice unless par. (gm) applies.

281.65(8)(gm)

(gm) The department in providing a cost-sharing grant under sub. (4e) (a) or a governmental unit submitting the application under sub. (4c) (a) or (4e) (a) may exceed the limit under par. (f) in case of economic hardship, as defined by the department by rule. In providing a grant for a project to achieve compliance with a performance standard or prohibition established under s. 281.16 (3) (a), the department shall provide cost-sharing of 70% of the cost of compliance or 70% to 90% of the cost of compliance in case of economic hardship.

281.65(8)(L)

(L) A grant may not be made to an individual whose name appears on the statewide support lien docket under s. 49.854 (2) (b), unless the individual provides to the department a payment agreement that has been approved by the county child support agency under s. 59.53 (5) and that is consistent with rules promulgated under s. 49.858 (2) (a).

281.65(8)(m)

(m) The department may recognize the value of a conservation easement created under s. 700.40 (2) and donated to the department, or to any person approved by the department, as constituting all or a portion of the landowner's or operator's share of a cost-sharing grant as determined under par. (f).

281.65(8)(n)

(n) The department shall identify by rule the types of cost-shared practices and the minimum grant amounts for cost-sharing grants that require any subsequent owner of the property to maintain the cost-shared practice for the life of the cost-shared practice, as determined by the department.

281.65(8)(o)

(o) The department shall provide grants for animal waste storage facilities in amounts not to exceed an amount specified by the department by rule.

281.65(8)(p)

(p) The department may provide a cost-sharing grant to replace a structure or facility at a new location, rather than to repair or reconstruct the structure or facility, if the relocation reduces water pollution and replacement is cost-effective compared to repairing or reconstructing the structure or facility.

281.65(8b)

(8b) Beginning in 1999, if the department establishes an anticipated cost-share reimbursement amount for a year for a county that receives funding under this section and the county enters into cost-share agreements with landowners or operators that result in reimbursable amounts for the year that exceed the amount established by the department, the county shall provide reimbursement to the landowners or operators in the amount by which the reimbursable amounts exceed the amount established by the department.

281.65(8e)

(8e) The department may not require a person who received a cost-sharing grant to repay the cost-sharing grant on the basis of a violation of this section, rules promulgated under this section or the grant agreement, if, at the time of the violation, the person who received the grant no longer owns or operates the land for which the department provided the grant. This subsection applies without regard to whether the person received the grant before, on or after May 16, 1992.

281.65(8m)

(8m) If the department determines under sub. (4) (g) 5. that a county, city, village or town should be required to develop a construction site erosion control ordinance under s. 59.693, 60.627, 61.354 or 62.234 or a manure storage ordinance under s. 92.16, that county, city, village or town shall make a commitment to develop and adopt the ordinance as a condition of receiving a grant under this section.

281.65(9)

(9) The department may distribute grants and aids to state agencies, including itself, for administration and implementation of the nonpoint source water pollution abatement program on land under state ownership or control for projects affecting priority lakes or in priority watershed areas. The department may distribute grants and aids to itself for the purchase of easements in priority watershed areas.

281.65(11)

(11) Notwithstanding subs. (3) (am) and (3m), the South Fork of the Hay River is a priority watershed for the period ending on June 30, 2005. Notwithstanding subs. (2) (a), (4) (dm), (e), (em) and (g) 4., (4m) (b) 3. and (8) (b) and (e), the department, in consultation with the local units of government involved with the priority watershed project, shall establish guidelines for the types of nonpoint source water pollution abatement practices to be eligible for cost-sharing grants in the watershed. Notwithstanding sub. (8) (f), the amount of a cost-sharing grant in the watershed may be based on the amount of pollution reduction achieved rather than on the cost of the practices installed, using guidelines developed by the department, in consultation with the local units of government involved with the priority watershed project. In providing funding under s. 92.14 (3), the department of agriculture, trade and consumer protection shall determine the amount of matching funds required for staff for the priority watershed project as though the funding termination date of June 30, 2005, had been in effect on October 6, 1998. The department and the local governmental staff involved with the priority watershed project shall evaluate the cost effectiveness of the project and the reduction in nonpoint source water pollution associated with the project.

281.65(12)

(12) Notwithstanding sub. (8), during fiscal year 2002-03, the department shall make a payment under this section to a landowner who received a notice of discharge under ch. 283, who entered into a cost-share agreement with the department of agriculture, trade and consumer protection for a grant under s. 92.14 (4) (c), 1997 stats., and who complied with the cost-share agreement but who did not receive the grant under s. 92.14 (4) (c), 1997 stats. The department shall make a payment under this subsection in the amount to which the landowner would have been entitled under the cost-share agreement with the department of agriculture, trade and consumer protection. The department may not require a landowner to file an application to receive payment under this subsection.

281.65 - ANNOT.

History: 1977 c. 418; 1979 c. 34, 221; 1979 c. 355 s. 241; 1981 c. 20; 1981 c. 346 s. 38; 1983 a. 27; 1983 a. 189 s. 329 (16); 1983 a. 416; 1985 a. 29; 1987 a. 27; 1989 a. 31, 336, 366; 1991 a. 39, 309; 1993 a. 16, 166, 213, 246, 491; 1995 a. 27, 201, 225; 1995 a. 227 s. 428; Stats. 1995 s. 281.65; 1995 a. 404 s. 204; 1997 a. 27, 209, 237; 1999 a. 9; 1999 a. 150 s. 672; 2001 a. 16, 109; 2003 a. 33; 2007 a. 20; 2009 a. 28.

281.65 - ANNOT.

Cross Reference: See also chs. NR 120 and 151, Wis. adm. code.

State Codes and Statutes

State Codes and Statutes

Statutes > Wisconsin > 281 > 281.65

281.65

281.65 Financial assistance; nonpoint source water pollution abatement.

281.65(1)

(1) The purposes of the nonpoint source pollution abatement financial assistance program under this section are to:

281.65(1)(a)

(a) Provide the necessary administrative framework and financial assistance for the implementation of measures to meet nonpoint source water pollution abatement needs identified in areawide water quality management plans.

281.65(1)(b)

(b) Provide coordination with all elements of the state's water quality program in order to ensure that all activities and limited resources are optimally allocated in the achievement of this state's water quality goals.

281.65(1)(c)

(c) Provide technical and financial assistance for the application of necessary nonpoint source water pollution abatement measures.

281.65(1)(d)

(d) Focus limited technical and financial resources in critical geographic locations where nonpoint source related water quality problems and threats are the most severe and control is most feasible.

281.65(1)(e)

(e) Provide for program evaluation, subsequent modifications and recommendations.

281.65(2)

(2) In this section:

281.65(2)(a)

(a) "Best management practices" means practices, techniques or measures, except for dredging, identified in areawide water quality management plans, which are determined to be effective means of preventing or reducing pollutants generated from nonpoint sources, or from the sediments of inland lakes polluted by nonpoint sources, to a level compatible with water quality objectives established under this section and which do not have an adverse impact on fish and wildlife habitat. The practices, techniques or measures include land acquisition, storm sewer rerouting and the removal of structures necessary to install structural urban best management practices, facilities for the handling and treatment of milkhouse wastewater, repair of fences built using grants under this section and measures to prevent or reduce pollutants generated from mine tailings disposal sites for which the department has not approved a plan of operation under s. 289.30.

281.65(2)(am)

(am) "Governmental unit" means any governmental unit including, but not limited to, a county, city, village, town, metropolitan sewerage district created under ss. 200.01 to 200.15 or 200.21 to 200.65, town sanitary district, public inland lake protection and rehabilitation district, regional planning commission or drainage district operating under ch. 89, 1961 stats., or ch. 88. "Governmental unit" does not include the state or any state agency.

281.65(2)(b)

(b) "Nonpoint source" means a land management activity which contributes to runoff, seepage or percolation which adversely affects or threatens the quality of waters of this state and which is not a point source as defined under s. 283.01 (12).

281.65(2)(be)

(be) "Priority lake" means any lake or group of lakes that are identified under sub. (3) (am).

281.65(2)(bs)

(bs) "Priority lake area" means a priority lake and the area surrounding the priority lake designated by the department for the implementation of the nonpoint source pollution abatement project for the priority lake.

281.65(2)(c)

(c) "Priority watershed" means any watershed that is identified under sub. (3) (am) or (4) (cm) or (co).

281.65(2)(d)

(d) "Structural urban best management practices" means detention basins, wet basins, infiltration basins and trenches and wetland basins.

281.65(3)

(3) The land and water conservation board shall do all of the following:

281.65(3)(a)

(a) Review the lists submitted under sub. (4) (c) and (cd) and reports submitted under sub. (4) (c) and (cg).

281.65(3)(am)

(am) Identify priority watersheds and priority lakes as provided in sub. (3m).

281.65(3)(ap)

(ap) Review and approve priority lake and priority watershed plans prepared under sub. (5m) and modifications to those plans prepared under sub. (5s). The board may exempt minor plan modifications from the requirement of board approval.

281.65(3)(at)

(at) Review rules drafted under this section and make recommendations regarding the rules before final approval of the rules by the natural resources board.

281.65(3)(b)

(b) Before September 1 of each even-numbered year, submit to the governor and the department a report that includes all of the following:

281.65(3)(b)1.

1. Recommendations for the amount to be appropriated for the program under this section for the following fiscal biennium.

281.65(3)(b)5.

5. Any changes that the board determines would improve the efficiency or effectiveness of the program under this section.

281.65(3)(bm)

(bm) Whenever the board determines necessary, submit to the governor and the department recommendations concerning changes to the amounts appropriated for the program under this section or recommendations concerning any changes that would improve the efficiency or effectiveness of the program under this section.

281.65(3)(c)

(c) Assist counties and the department to resolve concerns about the program under this section.

281.65(3)(d)

(d) Establish priorities for the allocation of funds in the event that program needs exceed available funding in any fiscal biennium.

281.65(3)(e)

(e) After reviewing a plan submitted under sub. (4) (k), request the building commission to authorize public debt to be contracted in the amount that the board determines to be necessary for the purposes of the program under this section.

281.65(3)(f)

(f) Require the department and the department of agriculture, trade and consumer protection to conduct or contract for another person to conduct any evaluation or audit of the program under this section and of individual priority watershed or priority lake projects that the board determines is necessary.

281.65(3m)

(3m)

281.65(3m)(a)

(a)

281.65(3m)(a)1.

1. No later than July 1, 1998, the board shall identify priority watersheds based on the list submitted under sub. (4) (c) and recommendations by the department and the department of agriculture, trade and consumer protection without regard to any priority watershed designations made before the board acts under this subdivision, except for priority watershed designations under sub. (4) (cm) or (co). The department and the department of agriculture, trade and consumer protection shall limit the number of watersheds that they recommend to the board to the number that they determine will enable the department to comply with sub. (4) (g) 9., assuming that the level of funding for the program under this section remains the same as on October 14, 1997.

281.65(3m)(a)2.

2. If a watershed is designated as a priority watershed before the board acts under subd. 1. and the board does not identify the watershed as a priority watershed under subd. 1., the board shall terminate the watershed's designation as a priority watershed. This subdivision does not apply to priority watershed designations made under sub. (4) (cm) or (co).

281.65(3m)(b)

(b)

281.65(3m)(b)1.

1. No later than July 1, 1998, the board shall identify priority lakes based on the list submitted under sub. (4) (cd) and recommendations by the department and the department of agriculture, trade and consumer protection without regard to any priority lake designations made before the board acts under this subdivision.

281.65(3m)(b)2.

2. If a lake is designated as a priority lake before the board acts under subd. 1. and the board does not identify the lake as a priority lake under subd. 1., the board shall terminate the lake's designation as a priority lake.

281.65(3m)(c)

(c) If the board terminates a priority watershed or priority lake designation under this subsection, the board shall direct the department to eliminate funding for the project in the former priority watershed or priority lake area.

281.65(3m)(d)

(d)

281.65(3m)(d)1.

1. If a watershed is designated as a priority watershed before the board acts under par. (a) 1. and the board identifies the watershed as a priority watershed under par. (a) 1., the board shall direct the department to continue funding for the project in the priority watershed.

281.65(3m)(d)2.

2. If a lake is designated as a priority lake before the board acts under par. (b) 1. and the board identifies the lake as a priority lake under par. (b) 1., the board shall direct the department to continue funding for the project in the priority lake area.

281.65(4)

(4) The department shall:

281.65(4)(a)

(a) Administer the nonpoint source water pollution program under this section.

281.65(4)(am)

(am) Be responsible for the integration of the nonpoint source water pollution abatement program into the state's overall water quality management program.

281.65(4)(ar)

(ar) Serve as the designated state agency with the federal environmental protection agency on all aspects related to the nonpoint source program management requirements of P.L. 100-4, including the development and submittal of the nonpoint source assessment report and management program required under P.L. 100-4, section 316 and preparation of the annual grant application for federal funding from the environmental protection agency to implement that program.

281.65(4)(as)

(as) Consult with the department of agriculture, trade and consumer protection in developing any federal grant application under par. (ar). Every application is subject to s. 16.54 and shall include the proposed expenditures of federal nonpoint source water pollution abatement grant moneys and the allocation of such moneys between the department and the department of agriculture, trade and consumer protection.

281.65(4)(b)

(b) Identify through the areawide water quality management plans provided for under section 208 of the federal water pollution control act, P.L. 92-500, as amended, the designated local management agencies.

281.65(4)(c)

(c) Prepare a list of the watersheds in this state in order of the level of impairment of the waters in each watershed caused by nonpoint source pollution, taking into consideration the location of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A), and submit the list to the board no later than January 1, 1998.

281.65(4)(cd)

(cd) Prepare a list of the lakes in this state in order of the level of impairment of the waters in the lakes caused by nonpoint source pollution, taking into consideration the location of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A), and submit the list to the board no later than January 1, 1998.

281.65(4)(cg)

(cg) Before July 1 of each even-numbered year, submit its recommendations on the matters under sub. (3) (b) 1. and 5. to the land and water conservation board.

281.65(4)(cm)

(cm) Identify watershed areas in the Milwaukee River basin as priority watershed areas, notwithstanding par. (c), and identify the best management practices necessary to meet water quality objectives in those watershed areas. For the purposes of this paragraph, the Kinnickinnic River shall be treated as being within a watershed area in the Milwaukee River basin. The department shall appoint an advisory committee which represents appropriate local interests to assist it in the planning and implementation of projects and best management practices in these watershed areas. The advisory committee shall include a member of the county board from each county with any area in the Milwaukee River basin.

281.65(4)(co)

(co) Identify the Root River watershed as a priority watershed.

281.65(4)(d)

(d) Review and approve the detailed program for implementation prepared by the designated local management agencies identified under par. (b).

281.65(4)(dm)

(dm) Establish water quality objectives for each water basin and for each priority watershed and priority lake and identify the best management practices to achieve the water quality objectives.

281.65(4)(dr)

(dr) Appoint a committee for each priority watershed and priority lake, to advise the department, the department of agriculture, trade and consumer protection and the counties, cities and villages concerning all aspects of the nonpoint source pollution abatement financial assistance program. Each committee shall include at least 2 farmers as members if the priority watershed or priority lake area includes property in agricultural use. Each committee shall include at least 2 representatives of a public inland lake protection and rehabilitation district that is within the priority watershed or priority lake area or, if one does not exist, of riparian property owners. Each committee for a priority watershed or priority lake area with any area in the Milwaukee River basin shall include a member of the county board from each county with any area in that priority watershed or priority lake area.

281.65(4)(e)

(e) Promulgate rules, in consultation with the department of agriculture, trade and consumer protection, as are necessary for the proper execution and administration of the program under this section. Before promulgating rules under this paragraph, the department shall submit the rules to the land and water conservation board for review under sub. (3) (at). The rules shall include standards and specifications concerning best management practices which are required for eligibility for cost-sharing grants under this section. The standards and specifications shall be consistent with the performance standards, prohibitions, conservation practices and technical standards under s. 281.16. The department may waive the standards and specifications in exceptional cases. The rules shall specify which best management practices are cost-effective best management practices. Only persons involved in the administration of the program under this section, persons who are grant recipients or applicants and persons who receive notices of intent to issue orders under s. 281.20 (1) (b) are subject to the rules promulgated under this paragraph. Any rule promulgated under this paragraph which relates or pertains to agricultural practices relating to animal waste handling and treatment is subject to s. 13.565.

281.65(4)(em)

(em) In identifying best management practices under pars. (dm) and (g) 4., identify cost-effective best management practices, as specified under par. (e), except in situations in which the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4)(f)

(f) Administer the distribution of grants and aids to governmental units for local administration and implementation of the program under this section. A grant awarded under this section may be used for cost-sharing for management practices and capital improvements, easements, or other activities determined by the department to satisfy the requirements of this section. A grant under this section to a lake district for a priority lake identified under sub. (3m) (b) 1. may be used for plan preparation, technical assistance, educational and training assistance, and ordinance development and administration. A grant may not be used for promotional items, except for promotional items that are used for informational purposes, such as brochures or videos.

281.65(4)(g)

(g) In cooperation with the department of agriculture, trade and consumer protection and the appropriate governmental unit, prepare priority watershed and priority lakes plans to implement nonpoint source water pollution abatement projects in priority watersheds and priority lake areas. In preparing the plans, the department shall:

281.65(4)(g)1.

1. Conduct the planning process in a cost-effective and timely manner and scale the planning process in accordance with the scale and nature of the pollution problem addressed in the plan.

281.65(4)(g)2.

2. Promote significant participation from the department of agriculture, trade and consumer protection and other state agencies, governmental units and other persons located in any priority watershed or in any priority lake area that is the subject of the plan.

281.65(4)(g)3.

3. Prepare a water resource assessment, set water quality goals and analyze alternative management practices for the area which is the subject of the plan.

281.65(4)(g)4.

4. In cooperation with the department of agriculture, trade and consumer protection, incorporate the appropriate best management practices into the plan.

281.65(4)(g)5.

5. Determine whether any county, city, village or town within the area which is the subject of the plan, as a condition of a grant under this section, should be required to develop a construction site erosion control ordinance under s. 59.693, 60.627, 61.354 or 62.234 or a manure storage ordinance under s. 92.16 in order to meet the water quality goals established in the plan.

281.65(4)(g)6.

6. Determine the specific plan components to be prepared by any appropriate governmental units in the watershed or in the area of the project affecting the priority lake, after determining the technical, financial and staffing capability of that governmental unit.

281.65(4)(g)7.

7. Prepare a project funding list.

281.65(4)(g)8.

8. Establish an implementation plan for each priority watershed and priority lake, including all of the following:

281.65(4)(g)8.a.

a. A list of the best management practices identified under par. (dm) that are most critically needed to achieve water quality objectives in the priority watershed or priority lake.

281.65(4)(g)8.am.

am. Designation as critical sites those sites that are significant sources of nonpoint source pollution upon which best management practices must be implemented in order to obtain a reasonable likelihood that the water quality objectives established under par. (dm) can be achieved.

281.65(4)(g)8.b.

b. A procedure for establishing implementation priorities to meet the needs identified in subd. 8. a. with the highest priority given to significant sources of nonpoint pollution that substantially inhibit the achievement of water quality objectives.

281.65(4)(g)8.c.

c. Consultation with the committee appointed under par. (dr) concerning the implementation plan.

281.65(4)(g)8.d.

d. A requirement to review the implementation plan periodically and to modify the implementation plan to reflect the agreements entered into by landowners and operators to implement best management practices.

281.65(4)(g)8.e.

e. Provisions for public notice and education concerning the implementation plan in the period during which grants are available to governmental units and landowners and operators, in order to achieve the greatest level of voluntary participation.

281.65(4)(g)9.

9. Complete the planning process in all priority watersheds by December 31, 2015.

281.65(4)(h)

(h) Designate a governmental unit to perform the inventory required under sub. (4m) (a).

281.65(4)(i)

(i) Cooperate with the department of agriculture, trade and consumer protection under s. 92.14 (6).

281.65(4)(k)

(k) Before public debt is contracted for projects under this section, prepare a plan for the expenditure of the proceeds of that debt and submit the plan to the land and water conservation board.

281.65(4)(L)

(L) Before September 1 of each year, in consultation with the department of agriculture, trade and consumer protection, submit a budget report to the board that includes anticipated expenditures for projects under this section during the next year, criteria for ending projects under this section and, if anticipated expenditures exceed anticipated funding, a plan for reducing expenditures.

281.65(4)(o)

(o) Annually, in cooperation with the department of agriculture, trade and consumer protection, submit a report on the progress of the program under this section to the land and water conservation board.

281.65(4)(p)

(p) Jointly with the department of agriculture, trade and consumer protection, prepare the plan required under s. 92.14 (13). The department shall review and approve or disapprove the plan and shall notify the land and water conservation board of its final action on the plan. The department shall implement any part of the plan for which the plan gives it responsibility.

281.65(4)(pm)

(pm) Jointly with the department of agriculture, trade and consumer protection, develop the forms required and implement the process under s. 92.14 (14).

281.65(4)(q)

(q) Include the report submitted under sub. (3) (b), along with a request for all resources and any changes necessary to implement each recommendation in the report, in the information that it submits to the department of administration under s. 16.42 for the program under this section.

281.65(4)(s)

(s) Provide staff services to the land and water conservation board.

281.65(4c)

(4c)

281.65(4c)(a)

(a) A governmental unit may request funding under this subsection for a project that is in a priority watershed or priority lake area or a project that is not in a priority watershed or a priority lake area by submitting an application to the department. An application shall be submitted before July 15 to be considered for initial funding in the following year.

281.65(4c)(ae)

(ae) The department shall administer this subsection in a manner that promotes the accelerated implementation of nonpoint source water pollution control that cannot be conducted with funding under s. 92.14 in target areas described in par. (am) 1. that are of the highest priority.

281.65(4c)(am)

(am) The department may select a project for funding under this subsection only if all of the following apply:

281.65(4c)(am)1.

1. The project will implement nonpoint source pollution control in an area that is a target area based on any of the following:

281.65(4c)(am)1.a.

a. The need for compliance with performance standards established by the department under s. 281.16 (2) and (3).

281.65(4c)(am)1.b.

b. The existence of impaired water bodies that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4c)(am)1.c.

c. The existence of outstanding or exceptional resource waters, as designated by the department under s. 281.15.

281.65(4c)(am)1.d.

d. The existence of threats to public health.

281.65(4c)(am)1.e.

e. The existence of an animal feeding operation that has received a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge.

281.65(4c)(am)1.f.

f. Other water quality concerns of national or statewide importance.

281.65(4c)(am)2.

2. The department, in consultation with the department of agriculture, trade and consumer protection, determines that funding provided under s. 92.14 is insufficient to fund the project.

281.65(4c)(am)3.

3. The project is consistent with priorities identified by the department on a watershed or other geographic basis.

281.65(4c)(am)4.

4. The project is consistent with approved land and water resource management plans under s. 92.10.

281.65(4c)(am)5.

5. The application for the project specifies the watershed, subwatershed or specific site that will be served by the project.

281.65(4c)(b)

(b) The department shall use the system under par. (d) to determine the score of each project for which it receives an application under par. (a) and shall inform the land and water conservation board of the scores no later than September 1 of each year.

281.65(4c)(c)

(c) After determining project scores under par. (b), the department shall notify the land and water conservation board of the projects that the department proposes to select for funding in the following year. The board shall review the proposal and make recommendations to the department. Before November 1 of each year, the department shall select projects for funding under this subsection in the following year. To the extent practicable, within the requirements of this section, the department shall select projects so that projects are distributed evenly around this state.

281.65(4c)(d)

(d) The department shall adopt a scoring system for ranking nonpoint source water pollution abatement projects for which applications are submitted under par. (a). The criteria on which the scoring system is based shall include all of the following:

281.65(4c)(d)1.

1. The extent to which the application proposes to use the cost-effective and appropriate best management practices to achieve water quality goals.

281.65(4c)(d)2.

2. The existence in the project area of an impaired water body that the department has identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(4c)(d)3.

3. The extent to which the project will result in the attainment of established water quality objectives.

281.65(4c)(d)4.

4. The local interest in and commitment to the project.

281.65(4c)(d)5.

5. The inclusion of a strategy to evaluate the progress toward reaching project goals, including the monitoring of water quality improvements resulting from project activities.

281.65(4c)(d)6.

6. The extent to which the application proposes to use available federal funding.

281.65(4c)(d)7.

7. The extent to which the project is necessary to enable the city of Racine to control storm water discharges as required under 33 USC 1342 (p).

281.65(4c)(f)

(f) A project funded under this subsection may be conducted over a period of one to 3 years, except that the department may approve an extension for one year.

281.65 - ANNOT.

Cross Reference: See also ch. NR 153, Wis. adm. code.

281.65(4e)

(4e)

281.65(4e)(a)

(a) A governmental unit may request funding under this subsection for a project to implement best management practices for animal waste management at an animal feeding operation for which the department has issued a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge.

281.65(4e)(b)

(b) The department may grant a request under par. (a) if it determines that providing funding under this subsection is necessary to protect the waters of the state.

281.65(4e)(bm)

(bm) The department may provide a cost-sharing grant under this subsection directly to a landowner, or to an operator of an animal feeding operation, for a project to implement best management practices for animal waste management at an animal feeding operation for which the department has issued a notice of discharge under ch. 283 or a notice of intent to issue a notice of discharge if the department determines that providing funding under this subsection is necessary to protect the waters of the state.

281.65(4e)(c)

(c) Subsection (8) (d) does not apply to a grant under this subsection.

281.65(4g)

(4g) The department may contract with any person from the appropriation account under s. 20.370 (4) (at) for services to administer or implement this section, including information and education and training services. The department shall allocate $500,000 in each fiscal year from the appropriation account under s. 20.370 (4) (at) for contracts for educational and technical assistance related to the program under this section provided by the University of Wisconsin-Extension.

281.65(4m)

(4m)

281.65(4m)(a)

(a) Any governmental unit or regional planning commission designated by the department under sub. (4) (h) shall prepare an inventory of nonpoint source water pollution in the watershed which is the subject of the plan under sub. (4) (g) and submit the inventory to the department for incorporation into the plan.

281.65(4m)(b)

(b) Every plan prepared for an area under sub. (4) (g) shall include all of the following:

281.65(4m)(b)1.

1. The inventory for that area prepared under par. (a).

281.65(4m)(b)2.

2. A water resource assessment of that area.

281.65(4m)(b)3.

3. The identification of critical surface water and groundwater protection management areas within that area and the agricultural and nonagricultural best management practices to be applied to that area.

281.65(4m)(b)4.

4. A plan implementation schedule developed in cooperation with the appropriate governmental unit or designated local management agency identified under sub. (4) (b).

281.65(4m)(b)5.

5. A grant disbursement and project management schedule.

281.65(4m)(b)6.

6. An integrated resource management strategy to protect or enhance fish and wildlife habitat, aesthetics and other natural resources.

281.65(4m)(b)7.

7. A comprehensive management strategy to manage agricultural and nonagricultural nonpoint source water pollution affecting surface water or groundwater, including animal waste, fertilizer, pesticides, storm water, construction site erosion and other nonpoint sources of water pollution.

281.65(4m)(c)

(c) The department shall submit a copy of any plan it completes under this subsection to any county located in or containing any watershed which is a subject of the plan and to the department of agriculture, trade and consumer protection. The department of agriculture, trade and consumer protection shall review the plan and notify the department of natural resources of its comments on the plan. A county receiving a plan under this subsection shall review the plan, approve or disapprove the plan and notify the department of natural resources of its action on the plan.

281.65(4m)(d)

(d) After the department considers the comments of the department of agriculture, trade and consumer protection on a plan under par. (c) and receives approval of the plan by every county to which it was sent and by the land and water conservation board, the department shall designate the plan to be an element of the appropriate areawide water quality management plan under P.L. 92-500, section 208.

281.65(5)

(5) The department of agriculture, trade and consumer protection shall:

281.65(5)(b)

(b) Prepare sections of the priority watershed or priority lake plan relating to farm-specific implementation schedules, requirements under s. 281.16 (3), animal waste management and selection of agriculturally related best management practices and submit those sections to the department for inclusion under sub. (4m) (b). The best management practices shall be cost-effective best management practices, as specified under sub. (4) (e), except in situations in which the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(5)(d)

(d) Develop a grant disbursement and project management schedule for agriculturally related best management practices to be included in a plan established under sub. (4) (g) and identify recommendations for implementing activities or projects under ss. 92.10 and 281.16 (3).

281.65(5)(e)

(e) Identify areas within a priority watershed or priority lake area that are subject to activities required under s. 281.16 (3).

281.65(5)(f)

(f) Provide implementation assistance as identified and approved in the priority watershed or priority lake plan under sub. (4) (g).

281.65(5m)

(5m) Upon completion of plans by the department under sub. (4) (g), the governmental unit or regional planning commission under sub. (4m) and the department of agriculture, trade and consumer protection under sub. (5), and upon receiving the approval of the land and water conservation board, the department shall prepare and approve the final plan for a priority watershed or priority lake.

281.65(5q)

(5q)

281.65(5q)(a)

(a) Notwithstanding sub. (5s), neither the department nor the land and water conservation board may extend funding under this section for a priority watershed or priority lake project beyond the funding termination date that was in effect for the priority watershed or priority lake project on January 1, 2001, except as provided in par. (b).

281.65(5q)(b)

(b) The department may authorize funding to be provided to a landowner under a priority watershed or priority lake project for up to one year after the funding termination date under par. (a) for that project if the department determines that a delay in implementation of best management practices by the landowner was caused by conditions beyond the control of the landowner.

281.65(5s)

(5s) The department may make modifications, including designating additional sites as critical sites, in a priority watershed or priority lake plan with the approval of every county to which the department sent the original plan under sub. (4m) (c) and of the land and water conservation board. If the owner or operator of a site prevails in a final review under sub. (7) or the site is not designated as a critical site in the original plan under sub. (5m) and the pollution is from an agricultural source and is not caused by animal waste, the department may not make a modification designating the site as a critical site unless the designation is based on a substantial increase in pollution from the site, on information about pollution from the site that was not available when the plan was prepared or on a substantial change to the criteria for designating a site as a critical site. This subsection applies to a priority watershed or priority lake plan completed before, on or after August 12, 1993.

281.65(5w)

(5w) After the land and water conservation board approves a priority watershed or priority lake plan or a modification to such a plan that designates a site to be a critical site, the department shall notify the owner or operator of that site of the designation and of the provisions in sub. (7) and either s. 281.20 or, if the pollution is caused primarily by animal waste, ss. NR 243.21 to 243.26, Wis. adm. code.

281.65(5y)

(5y) If the owner or operator of a critical site installs and maintains best management practices as provided under the priority watershed or priority lake plan, the site is no longer a critical site. The owner or operator may discontinue maintenance of a best management practice for a period during which the owner or operator changes the use of the site if the best management practice is not needed for the changed use.

281.65(6)

(6) The appropriate governmental unit is responsible for local administration and implementation of priority watershed and priority lakes projects and shall:

281.65(6)(a)

(a) Be responsible for coordination and implementation of activities necessary to achieve water quality objectives including the development of a detailed program for implementation.

281.65(6)(b)

(b) Utilize, whenever possible, existing staff or contract with existing governmental agencies to utilize that agency's existing staff to provide various field, administrative, planning and other services.

281.65(6)(d)

(d) Participate in the plan preparation under contract with the department. The department shall determine the specific plan components which will be prepared depending upon the technical, financial and staffing capability of the appropriate governmental unit.

281.65(7)

(7)

281.65(7)(a)

(a)

281.65(7)(a)1.

1. The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) may request a review of that designation by filing a written request within 60 days after receiving notice under sub. (5w) with the land conservation committee of the county in which the site is located or, if the site is located in more than one county, with the land conservation committee of the county in which the largest portion of the site is located.

281.65(7)(a)2.

2. A county land conservation committee receiving a request under subd. 1. shall provide the owner or operator with a hearing and shall provide reasonable notice of the hearing to the owner or operator, the department and the department of agriculture, trade and consumer protection. The county land conservation committee shall conduct the hearing under this subdivision as an informal hearing. Section 68.11 (2) does not apply to the hearing. The land conservation committee shall hold the hearing in a place convenient to the owner or operator. Within 60 days after the hearing, the department shall, and the department of agriculture, trade and consumer protection may, submit a report and recommendation to the land conservation committee concerning the issues at the hearing. The land conservation committee may affirm or reverse the designation of the site as a critical site.

281.65(7)(b)

(b) The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) or the department of natural resources may obtain a review of the decision of a county land conservation committee under par. (a) 2. by filing a written request with the land and water conservation board within 60 days after receiving the decision of the county land conservation committee.

281.65(7)(c)

(c) The owner or operator of a site designated as a critical site in a priority watershed or priority lake plan under sub. (5m) or in a modification to such a plan under sub. (5s) may request a contested case hearing under ch. 227 to review the decision of the land and water conservation board under par. (b) by filing a written request with the department within 60 days after receiving an adverse decision of the land and water conservation board.

281.65(7m)

(7m) The state share of a grant for local administration under this section may not exceed 70% of the cost of the activities for which the grant is provided if the department first provides a grant to fund those activities after June 30, 1998.

281.65(8)

(8) Eligibility for cost-sharing grants under this section shall be determined based on the following:

281.65(8)(a)

(a) Governmental units and individual landowners or operators are eligible for cost-sharing grants.

281.65(8)(b)

(b) Grants may be provided to applicants in priority watershed areas for projects in conformance with approved areawide water quality management plans.

281.65(8)(c)

(c) Grants may be provided to applicants in nonpriority watersheds for projects which are in conformance with areawide water quality management plans and which conform to the purposes specified under sub. (1).

281.65(8)(cm)

(cm) Grants may be provided to applicants for projects affecting priority lakes if the projects are in conformance with areawide water quality management plans and the purposes specified under sub. (1).

281.65(8)(d)

(d) Each cost-sharing grant shall be approved by the designated management agency.

281.65(8)(e)

(e) Grants may only be used for implementing best management practices. Grants for implementing best management practices may only be used for implementing cost-effective best management practices specified under sub. (4) (e) unless an applicant demonstrates that the use of a cost-effective best management practice will not contribute to water quality improvement or will cause a water body to continue to be impaired as identified to the federal environmental protection agency under 33 USC 1313 (d) (1) (A).

281.65(8)(f)

(f) A cost-sharing grant shall equal the percentage of the cost of implementing the best management practice that is determined by the department in providing a cost-sharing grant under sub. (4e) (a) or by the governmental unit submitting the application under sub. (4c) (a) or (4e) (a) and is approved by the board, except that a cost-sharing grant may not exceed 70% of the cost of implementing the best management practice unless par. (gm) applies.

281.65(8)(gm)

(gm) The department in providing a cost-sharing grant under sub. (4e) (a) or a governmental unit submitting the application under sub. (4c) (a) or (4e) (a) may exceed the limit under par. (f) in case of economic hardship, as defined by the department by rule. In providing a grant for a project to achieve compliance with a performance standard or prohibition established under s. 281.16 (3) (a), the department shall provide cost-sharing of 70% of the cost of compliance or 70% to 90% of the cost of compliance in case of economic hardship.

281.65(8)(L)

(L) A grant may not be made to an individual whose name appears on the statewide support lien docket under s. 49.854 (2) (b), unless the individual provides to the department a payment agreement that has been approved by the county child support agency under s. 59.53 (5) and that is consistent with rules promulgated under s. 49.858 (2) (a).

281.65(8)(m)

(m) The department may recognize the value of a conservation easement created under s. 700.40 (2) and donated to the department, or to any person approved by the department, as constituting all or a portion of the landowner's or operator's share of a cost-sharing grant as determined under par. (f).

281.65(8)(n)

(n) The department shall identify by rule the types of cost-shared practices and the minimum grant amounts for cost-sharing grants that require any subsequent owner of the property to maintain the cost-shared practice for the life of the cost-shared practice, as determined by the department.

281.65(8)(o)

(o) The department shall provide grants for animal waste storage facilities in amounts not to exceed an amount specified by the department by rule.

281.65(8)(p)

(p) The department may provide a cost-sharing grant to replace a structure or facility at a new location, rather than to repair or reconstruct the structure or facility, if the relocation reduces water pollution and replacement is cost-effective compared to repairing or reconstructing the structure or facility.

281.65(8b)

(8b) Beginning in 1999, if the department establishes an anticipated cost-share reimbursement amount for a year for a county that receives funding under this section and the county enters into cost-share agreements with landowners or operators that result in reimbursable amounts for the year that exceed the amount established by the department, the county shall provide reimbursement to the landowners or operators in the amount by which the reimbursable amounts exceed the amount established by the department.

281.65(8e)

(8e) The department may not require a person who received a cost-sharing grant to repay the cost-sharing grant on the basis of a violation of this section, rules promulgated under this section or the grant agreement, if, at the time of the violation, the person who received the grant no longer owns or operates the land for which the department provided the grant. This subsection applies without regard to whether the person received the grant before, on or after May 16, 1992.

281.65(8m)

(8m) If the department determines under sub. (4) (g) 5. that a county, city, village or town should be required to develop a construction site erosion control ordinance under s. 59.693, 60.627, 61.354 or 62.234 or a manure storage ordinance under s. 92.16, that county, city, village or town shall make a commitment to develop and adopt the ordinance as a condition of receiving a grant under this section.

281.65(9)

(9) The department may distribute grants and aids to state agencies, including itself, for administration and implementation of the nonpoint source water pollution abatement program on land under state ownership or control for projects affecting priority lakes or in priority watershed areas. The department may distribute grants and aids to itself for the purchase of easements in priority watershed areas.

281.65(11)

(11) Notwithstanding subs. (3) (am) and (3m), the South Fork of the Hay River is a priority watershed for the period ending on June 30, 2005. Notwithstanding subs. (2) (a), (4) (dm), (e), (em) and (g) 4., (4m) (b) 3. and (8) (b) and (e), the department, in consultation with the local units of government involved with the priority watershed project, shall establish guidelines for the types of nonpoint source water pollution abatement practices to be eligible for cost-sharing grants in the watershed. Notwithstanding sub. (8) (f), the amount of a cost-sharing grant in the watershed may be based on the amount of pollution reduction achieved rather than on the cost of the practices installed, using guidelines developed by the department, in consultation with the local units of government involved with the priority watershed project. In providing funding under s. 92.14 (3), the department of agriculture, trade and consumer protection shall determine the amount of matching funds required for staff for the priority watershed project as though the funding termination date of June 30, 2005, had been in effect on October 6, 1998. The department and the local governmental staff involved with the priority watershed project shall evaluate the cost effectiveness of the project and the reduction in nonpoint source water pollution associated with the project.

281.65(12)

(12) Notwithstanding sub. (8), during fiscal year 2002-03, the department shall make a payment under this section to a landowner who received a notice of discharge under ch. 283, who entered into a cost-share agreement with the department of agriculture, trade and consumer protection for a grant under s. 92.14 (4) (c), 1997 stats., and who complied with the cost-share agreement but who did not receive the grant under s. 92.14 (4) (c), 1997 stats. The department shall make a payment under this subsection in the amount to which the landowner would have been entitled under the cost-share agreement with the department of agriculture, trade and consumer protection. The department may not require a landowner to file an application to receive payment under this subsection.

281.65 - ANNOT.

History: 1977 c. 418; 1979 c. 34, 221; 1979 c. 355 s. 241; 1981 c. 20; 1981 c. 346 s. 38; 1983 a. 27; 1983 a. 189 s. 329 (16); 1983 a. 416; 1985 a. 29; 1987 a. 27; 1989 a. 31, 336, 366; 1991 a. 39, 309; 1993 a. 16, 166, 213, 246, 491; 1995 a. 27, 201, 225; 1995 a. 227 s. 428; Stats. 1995 s. 281.65; 1995 a. 404 s. 204; 1997 a. 27, 209, 237; 1999 a. 9; 1999 a. 150 s. 672; 2001 a. 16, 109; 2003 a. 33; 2007 a. 20; 2009 a. 28.

281.65 - ANNOT.

Cross Reference: See also chs. NR 120 and 151, Wis. adm. code.