CHAPTER 2. UNDERGROUND STORAGE OF CARBON DIOXIDE
- IC 14-39-2-1 Applicability; rules; memorandum of agreement
- IC 14-39-2-1.5 Authorization; primacy; inspection and maintenance
- IC 14-39-2-2 Repealed
- IC 14-39-2-3 Rights to pore space
- IC 14-39-2-4 Integration of interests to develop pore space
- IC 14-39-2-5 Carbon sequestration project permit; application requirements
- IC 14-39-2-5.1 Site of well
- IC 14-39-2-5.2 Construction of well
- IC 14-39-2-5.3 Duties during drilling and construction of well
- IC 14-39-2-5.4 Depth requirement waiver
- IC 14-39-2-5.5 Draft permit
- IC 14-39-2-5.6 Public comment and hearing
- IC 14-39-2-5.7 Drinking water protections; aquifer exemption
- IC 14-39-2-6 Application; return of incomplete application; public notice
- IC 14-39-2-6.2 Criteria for approving permit; restrictions and conditions
- IC 14-39-2-7 Issuance of permit; issuance of initial certificate
- IC 14-39-2-7.1 Appeal; informal hearing
- IC 14-39-2-8 Public disclosure of confidential information by the department
- IC 14-39-2-9 Payment to the department a fee for carbon dioxide storage
- IC 14-39-2-10 Carbon dioxide storage facility trust fund; reversion; appropriation
- IC 14-39-2-10.5 Carbon sequestration project program administrative fund; reversion
- IC 14-39-2-11 Drilling a well
- IC 14-39-2-11.5 Permit application for investigatory carbon dioxide wells
- IC 14-39-2-12 Recovery of public utility; claim of subsurface trespass
- IC 14-39-2-12.1 Injection pressure; stimulation program; well operating requirements
- IC 14-39-2-12.2 Modification, suspension, revocation, or reissuance of permit
- IC 14-39-2-12.3 Cooperation with the United States Environmental Protection Agency; reporting
- IC 14-39-2-12.4 Notice to other government or sovereign entities
- IC 14-39-2-12.5 Compliance oversight
- IC 14-39-2-12.6 Injection into oil and gas reservoir
- IC 14-39-2-12.7 Applicable permit to oil and gas reservoir injection; determination by the department
- IC 14-39-2-12.8 Compliance; limits and conditions of permit
- IC 14-39-2-13 Certificate of project completion; issuance; requirements; site closure
- IC 14-39-2-14 Applicability; carbon sequestration pilot project
- IC 14-39-2-14.5 Prohibited activities; violations
- IC 14-39-2-15 Enforcement
- IC 14-39-2-15.5 Construction
- IC 14-39-2-16 Reports