27-1275
27-1275. Features excluded from reclamation A. A reclamation plan may exclude any provision for reclaiming open pits, rock B. The following factors shall be considered in determining whether the reclamation 1. Cost to perform the reclamation. 2. Topography of the site. 3. Geology and stability of the site. 4. Time required to perform the reclamation. 5. Consumption of resources required to perform the reclamation. 6. Future access to aggregate resources. 7. Regional or local hydrogeology. C. Buildings and other structures may remain after reclamation if adequate measures |