27-303. Notification to inspector of beginning
or suspending operations


A. When mining operations are scheduled to begin at any mine, the operator, owner,
agent or other authorized representative shall give written notice to the inspector prior
to commencement of mining.


B. If operations do not commence within six months after the inspector receives the
notice of commencement, the operation is considered to be suspended.


C. In the case of temporary suspension of operations, excluding labor disputes,
exceeding six months or in the case of permanent termination of mining operations, the
operator shall notify the inspector, in writing, before the suspension or termination
date. All shafts, portals, adits or other openings shall be secured to prevent
unauthorized entry and to protect public health and safety pursuant to section 27-318.


D. On notification of suspension or termination of mining operations, the inspector
shall inspect the property to determine if adequate safety measures are being taken to
protect the public.