28-506
28-506. Long-range statewide transportation A. The division shall prepare for presentation to the board a long-range statewide 1. The plan shall include all anticipated critical statewide highway system needs 2. The plan shall be developed using the planning practices and the performance 3. To the extent practicable, the plan shall reflect local general land use plans 4. In developing the plan, the division shall consider any information developed as 5. The plan shall be developed in addition to any federally mandated planning 6. The division shall develop the plan every five years for review and approval by 7. All dollar amounts in the plan shall be expressed in constant dollars 8. The division shall annually identify any projects or services that should be B. The plan shall include: 1. All projects included in the plan adopted pursuant to section 28-307 and all 2. In addition to the projects identified in paragraph 1 of this subsection, lump C. For each statewide transportation project included in the plan, the division 1. A detailed description of the project, including the location of the project. 2. Estimates of any revenues directly attributable to the project, including 3. The anticipated performance outcomes associated with the project. D. For each transportation capital project included in the plan, the division shall 1. Right-of-way acquisition and preparation. 2. Project design, planning and engineering. 3. Project construction. 4. Any other related project costs. E. The division shall develop and include in the plan separate cost estimates for 1. Optimal long-term system preservation of each major transportation system 2. Appropriate comprehensive system management. 3. Appropriate system maintenance and operations. F. To the extent the division is not able to determine any information required in G. The division shall develop an estimate of projected revenues for the twenty year 1. Existing and enacted future revenue rates and schedules. 2. Reasonable expected future changes in revenue rates and schedules. H. If the revenues estimated pursuant to subsection G, paragraph 1 or 2 of this I. For the plan, and the portions of the plan determined pursuant to subsection H J. The division shall estimate the anticipated performance outcomes of: 1. The plan as developed by the division. 2. The portion of the plan that could be completed with the revenue estimate 3. The portion of the plan that could be completed with the revenue estimate K. The division shall maintain information developed concerning the projects and |