41-1364. Alteration or modification to
monuments and memorials within governmental mall; procedures;
approval


A. Any alteration or modification to an existing monument or memorial that was
completed pursuant to section 41-1363 must abide by the following procedures:


1. The proponents of the monument or memorial that submitted the concept pursuant
to section 41-1363 shall submit the proposed alteration or modification to the
legislative governmental mall commission.


2. After recommendations from the historical advisory commission regarding what
impact the proposed alteration or modification would have on the historical integrity of
the existing monument or memorial and after any necessary negotiations with the
proponents, the legislative governmental mall commission shall approve or reject the
proposed alteration or modification.


3. If the proposed alteration or modification is approved and before the beginning
of construction involved in implementing the alteration or modification to the monument
or memorial, the proponents shall enter into a contract with the department of
administration specifying the scope of the alteration or modification to the monument or
memorial, a list of the artists, contractors and subcontractors that will be employed and
a verification that all employees for the project are insured and that this state is
indemnified against any liability in regard to the construction involved in implementing
the alteration or modification to the monument or memorial.


4. The alteration or modification to an existing monument or memorial shall be
completed and dedicated to this state within two years after the effective date of the
approval of the alteration or modification by the legislative governmental mall
commission.


B. All fund-raising, establishment and administration of a fund for deposit of
monies and contracts for artistic design and construction of the alteration or
modification to the existing monument or memorial are the sole responsibility of the
proponents.