45-1203. Approval by director of proposed dams
or enlargements of existing dams; application for construction or
enlargement


A. Construction of a dam or enlargement of an existing dam shall not be commenced
until a written approval of plans and specifications has been obtained from the director.


B. A separate application for each dam shall be filed with the director upon forms
provided by him, reciting the name and address of the owner or his agent, the location,
type, size and height of the proposed dam and appurtenant works, the storage capacity of
the reservoir, and such other information as the director requests. The application
shall also set forth the area of the drainage basin, rainfall and stream flow records,
flood flow records and estimates and other similar information required by the
director. The director may require information concerning subsoil and foundation
conditions and may require that the site be drilled or otherwise prospected.


C. When the physical conditions and the size of the dam do not require the
information provided in subsection B, such information may be waived by the director.


D. The means, plans and specifications by which the stream or body of water is to
be dammed, by-passed or controlled during construction shall be stated in the
application, or such means, plans and specifications shall be submitted to the director
for approval prior to beginning construction. The director shall have the same authority
over the construction and maintenance of such means of damming, by-passing or controlling
the stream or body of water during construction of the dam as he has over similar work on
the dam itself.


E. The application shall further state the proposed time of beginning and
completing construction, the estimated cost of construction, the use to which the
impounded or diverted water is to be put, and shall be accompanied by maps, plans and
specifications and state such details and dimensions as the director may require. The
maps, plans and specifications shall be a part of the application.


F. Prior to the approval of plans and specifications, the director may require a
surety company bond in an amount sufficient to secure the costs to the state in assuring
the safety of any dam left partially constructed. The bond may be required only when the
director questions the financial ability of the owner or contractor, or otherwise deems