45-2456
45-2456. Annual plan of operation A. By January 1 of each year, the authority shall adopt a plan of operation for B. In developing the plan of operation, the authority shall consider all of the 1. The amount of Colorado river water available for storage. 2. The advice of the department of water resources regarding where water storage 3. The advice of CAWCD regarding the amount and location of water delivery and 4. The respective costs of storing water at available storage facilities. 5. The amount of storage allowed by water storage permits held by the authority. 6. The monies available from the banking fund. 7. The way in which water stored could be used by the authority to achieve the 8. The obligations of the authority under any water banking services agreement into 9. Any other factor the authority determines to be relevant. C. The authority shall prepare a draft plan of operation each year. The authority 1. To the groundwater users advisory councils for the Tucson, Phoenix and Pinal 2. If any water storage during the year is to occur outside of an active management D. The authority may revise the draft plan of operation based on the public comment E. An adopted plan of operation shall include all of the following: 1. A projection of expenditures for acquiring water. 2. A projection of the amount of water to be acquired each month by the authority. 3. A projection of the cost of delivering that water through the central Arizona 4. A projection of expenditures for water storage. 5. A projection of water storage permits to be obtained and a projection of with 6. A projection of the amount of water to be stored, accounted for by active 7. A projection of long-term storage credits that will be distributed or 8. A projection of long-term storage credits that will be stored, loaned, replaced 9. Any other matter determined to be relevant by the authority. F. The authority may modify an adopted plan of operation. G. The authority shall operate in accordance with its adopted or modified plan of |