48-2056
48-2056. Costs A. Before the contract is entered into the bidder to whom the award was made shall B. If the work is abandoned by the district before letting the contract, the costs |
48-2056. Costs A. Before the contract is entered into the bidder to whom the award was made shall B. If the work is abandoned by the district before letting the contract, the costs |