§ 65-18-11. Conditions for eligibility.
 

(1)  In order for a county to be eligible to utilize its Local System Bridge Replacement and Rehabilitation Program allocation or any of its state aid road funds for the Local System Road Program, a county must meet the following conditions: 

(a) The county has employed a county engineer, together with such other technical assistance as is necessary to carry out the duties of this chapter, the same as provided under the provisions of Section 65-9-15, for its state aid road system and, through its official minutes, has authorized the county engineer to perform the necessary engineering services connected with the Local System Road Program. The county engineer shall prepare the necessary plans and designs for all construction projects, including state aid projects and projects provided under this chapter. He also shall provide engineering supervision for the construction of such projects and shall approve all estimate payments made on the projects. Engineering cost for any project performed under the Local System Road Program may be paid from any funds allocated to a county under the program; however, the maximum fee paid to an engineer shall not exceed twelve percent (12%) of the final construction cost. No such cost shall be reimbursed to the county before the letting of the project; and 

(b) The county has presented a plan for the construction, reconstruction and paving of a local system road which plan has been made and approved by the county engineer of the county, showing the specific road or project to be improved, stating the condition of the existing roadbed, drainage and bridges and outlining the type of construction or reconstruction to be made and the designs and specifications therefor including the paving of the road and the sources of revenue to be used and the sources and types of material to be used thereon. The plan shall be presented to the State Aid Engineer for the initial approval of the beginning of a project to receive monies. 

(2)  After the initial approval of the plan and plans as specified in subsection (1)(b) of this section has been made by the State Aid Engineer, the county shall be eligible to receive all funds made available to the county under the Local System Road Program to be used exclusively for the construction, reconstruction or paving of the local system road. The project may be done either by contract or by using county equipment and employees. It shall be according to the original plan or any amendments thereto which have been approved by the State Aid Engineer. The board may use county equipment and employees if the construction can be accomplished at a more reasonable cost than can be achieved by contract. 
 

Sources: Laws, 2001, ch. 492, § 6, eff from and after July 1, 2001.
 

State Codes and Statutes

Statutes > Mississippi > Title-65 > 18 > 65-18-11

§ 65-18-11. Conditions for eligibility.
 

(1)  In order for a county to be eligible to utilize its Local System Bridge Replacement and Rehabilitation Program allocation or any of its state aid road funds for the Local System Road Program, a county must meet the following conditions: 

(a) The county has employed a county engineer, together with such other technical assistance as is necessary to carry out the duties of this chapter, the same as provided under the provisions of Section 65-9-15, for its state aid road system and, through its official minutes, has authorized the county engineer to perform the necessary engineering services connected with the Local System Road Program. The county engineer shall prepare the necessary plans and designs for all construction projects, including state aid projects and projects provided under this chapter. He also shall provide engineering supervision for the construction of such projects and shall approve all estimate payments made on the projects. Engineering cost for any project performed under the Local System Road Program may be paid from any funds allocated to a county under the program; however, the maximum fee paid to an engineer shall not exceed twelve percent (12%) of the final construction cost. No such cost shall be reimbursed to the county before the letting of the project; and 

(b) The county has presented a plan for the construction, reconstruction and paving of a local system road which plan has been made and approved by the county engineer of the county, showing the specific road or project to be improved, stating the condition of the existing roadbed, drainage and bridges and outlining the type of construction or reconstruction to be made and the designs and specifications therefor including the paving of the road and the sources of revenue to be used and the sources and types of material to be used thereon. The plan shall be presented to the State Aid Engineer for the initial approval of the beginning of a project to receive monies. 

(2)  After the initial approval of the plan and plans as specified in subsection (1)(b) of this section has been made by the State Aid Engineer, the county shall be eligible to receive all funds made available to the county under the Local System Road Program to be used exclusively for the construction, reconstruction or paving of the local system road. The project may be done either by contract or by using county equipment and employees. It shall be according to the original plan or any amendments thereto which have been approved by the State Aid Engineer. The board may use county equipment and employees if the construction can be accomplished at a more reasonable cost than can be achieved by contract. 
 

Sources: Laws, 2001, ch. 492, § 6, eff from and after July 1, 2001.
 


State Codes and Statutes

State Codes and Statutes

Statutes > Mississippi > Title-65 > 18 > 65-18-11

§ 65-18-11. Conditions for eligibility.
 

(1)  In order for a county to be eligible to utilize its Local System Bridge Replacement and Rehabilitation Program allocation or any of its state aid road funds for the Local System Road Program, a county must meet the following conditions: 

(a) The county has employed a county engineer, together with such other technical assistance as is necessary to carry out the duties of this chapter, the same as provided under the provisions of Section 65-9-15, for its state aid road system and, through its official minutes, has authorized the county engineer to perform the necessary engineering services connected with the Local System Road Program. The county engineer shall prepare the necessary plans and designs for all construction projects, including state aid projects and projects provided under this chapter. He also shall provide engineering supervision for the construction of such projects and shall approve all estimate payments made on the projects. Engineering cost for any project performed under the Local System Road Program may be paid from any funds allocated to a county under the program; however, the maximum fee paid to an engineer shall not exceed twelve percent (12%) of the final construction cost. No such cost shall be reimbursed to the county before the letting of the project; and 

(b) The county has presented a plan for the construction, reconstruction and paving of a local system road which plan has been made and approved by the county engineer of the county, showing the specific road or project to be improved, stating the condition of the existing roadbed, drainage and bridges and outlining the type of construction or reconstruction to be made and the designs and specifications therefor including the paving of the road and the sources of revenue to be used and the sources and types of material to be used thereon. The plan shall be presented to the State Aid Engineer for the initial approval of the beginning of a project to receive monies. 

(2)  After the initial approval of the plan and plans as specified in subsection (1)(b) of this section has been made by the State Aid Engineer, the county shall be eligible to receive all funds made available to the county under the Local System Road Program to be used exclusively for the construction, reconstruction or paving of the local system road. The project may be done either by contract or by using county equipment and employees. It shall be according to the original plan or any amendments thereto which have been approved by the State Aid Engineer. The board may use county equipment and employees if the construction can be accomplished at a more reasonable cost than can be achieved by contract. 
 

Sources: Laws, 2001, ch. 492, § 6, eff from and after July 1, 2001.