      Sec. 10-264h. Grants for capital expenditures for interdistrict magnet school facilities. (a)(1) For the fiscal year ending June 30, 1996, until the fiscal year ending June 30, 2003, a local or regional board of education, regional educational service center or a cooperative arrangement pursuant to section 10-158a for purposes of an interdistrict magnet school may be eligible for reimbursement up to the full reasonable cost of any capital expenditure for the purchase, construction, extension, replacement, leasing or major alteration of interdistrict magnet school facilities, including any expenditure for the purchase of equipment, in accordance with this section. (A) For the fiscal year ending June 30, 2004, and each fiscal year thereafter, such entities, and (B) for the fiscal year ending June 30, 2008, and each fiscal year thereafter, the following entities that operate an interdistrict magnet school that assists the state in meeting the goals of the 2008 stipulation and order for Milo Sheff, et al. v. William A. O'Neill, et al., as determined by the commissioner: (i) The Board of Trustees of the Community-Technical Colleges on behalf of a regional community-technical college, (ii) the Board of Trustees of the Connecticut State University System on behalf of a state university, (iii) the Board of Trustees for The University of Connecticut on behalf of the university, (iv) the board of governors for an independent college or university, as defined in section 10a-37, or the equivalent of such a board, on behalf of the independent college or university, and (v) any other third-party not-for-profit corporation approved by the commissioner may be eligible for reimbursement up to ninety-five per cent of such cost. To be eligible for reimbursement under this section a magnet school construction project shall meet the requirements for a school building project established in chapter 173, except that the Commissioner of Education may waive any requirement in such chapter for good cause. On and after July 1, 1997, the commissioner shall approve only applications for reimbursement under this section that he finds will reduce racial, ethnic and economic isolation.

      (2) (A) Not later than July 1, 2007, the Commissioner of Education and the president of the Connecticut Science Center, Inc. shall enter into a memorandum of understanding establishing the parameters within which the center shall operate as and be given the status of a state-wide magnet science learning center. Upon achieving such status, the Connecticut Science Center, Inc. shall be eligible to apply for, in accordance with the provisions of subparagraph (B) of this subdivision, a grant of reimbursement of ninety-five per cent of any expenditures for the construction, replacement, alteration or repair of its facilities, including the reasonable and necessary costs for major exhibits. The Connecticut Science Center, Inc. may fund its five per cent share of expenditures from private contributions.

      (B) To be eligible to receive a grant pursuant to this subdivision, the Connecticut Science Center, Inc. shall file an application with the Commissioner of Education in such form and manner as the commissioner prescribes. Construction projects at the magnet science learning center shall meet the requirements of chapter 173, except that the commissioner may waive any requirements in such chapter for good cause.

      (b) Subject to the provisions of subsection (a) of this section, the applicant shall receive current payments of scheduled estimated eligible project costs for the facility, provided (1) the applicant files an application for a school building project, in accordance with section 10-283 by the date prescribed by the commissioner, (2) final plans and specifications for the project are approved pursuant to sections 10-291 and 10-292, and (3) such district submits to the commissioner, in such form as the commissioner prescribes, and the commissioner approves a plan for the operation of the facility which includes, but need not be limited to: A description of the educational programs to be offered, the completion date for the project, an estimated budget for the operation of the facility, written commitments for participation from the districts that will participate in the school and an analysis of the effect of the program on the reduction of racial, ethnic and economic isolation. The commissioner shall notify the secretary of the State Bond Commission when the provisions of subdivisions (1) and (3) of this subsection have been met. Upon application to the Commissioner of Education, compliance with the provisions of subdivisions (1) and (3) of this subsection and after authorization by the General Assembly pursuant to section 10-283, the applicant shall be eligible to receive progress payments in accordance with the provisions of section 10-287i.

      (c) (1) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the purchase or construction of the facility, the commissioner shall determine whether (A) title to the building and any legal interest in appurtenant land shall revert to the state or (B) the school district shall reimburse the state an amount equal to the difference between the amount received pursuant to this section and the amount the district would have been eligible to receive based on the percentage determined pursuant to section 10-285a multiplied by the estimated eligible project costs. (2) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the extension or major alteration of the facility, the school district shall reimburse the state the amount determined in accordance with subparagraph (B) of subdivision (1) of this subsection. A school district receiving a request for reimbursement pursuant to this subdivision shall reimburse the state not later than the close of the fiscal year following the year in which the request is made. If the school district fails to so reimburse the state, the Department of Education may withhold such amount from the total sum which is paid from the State Treasury to such school district or the town in which it is located or, in the case of a regional school district, the towns which comprise the school district. If the amount paid from the State Treasury is less than the amount due, the department may refer the matter to the Department of Administrative Services for collection.

      (d) The commissioner shall provide for a final audit of all project expenditures pursuant to this section and may require repayment of any ineligible expenditures.

      (P.A. 93-263, S. 9, 14; May Sp. Sess. P.A. 94-2, S. 177, 203; P.A. 95-226, S. 22, 30; P.A. 97-265, S. 84, 98; 97-290, S. 15, 29; P.A. 98-252, S. 20, 63, 80; 98-259, S. 2, 17; May 9 Sp. Sess. P.A. 02-5, S. 7; May 9 Sp. Sess. P.A. 02-6, S. 2; P.A. 07-249, S. 21; P.A. 08-169, S. 27.)

      History: P.A. 93-263 effective June 28, 1993; May Sp. Sess. P.A. 94-2 amended Subsec. (a) to substitute current payments of scheduled estimated eligible project costs for a lump sum payment equal to the highest percentage rate determined pursuant to Sec. 10-285a multiplied by estimated eligible project costs and provided for a grant in an amount equal to 5% of the amount authorized and allocated for the project upon compliance with the provisions of Subdivs. (1) and (3), amended Subsec. (b) to provide for reimbursement to the state of the difference between the amount received pursuant to this section and the amount the school district would have been eligible to receive based on the percentage determined pursuant to Sec. 10-285a multiplied by the estimated eligible project costs if within three years after completion of the project children from at least two or more school districts are not participating in the school and to provide, in such a case, if the school district does not reimburse the state, title to the building shall revert to the state, inserted a new Subsec. (c) on a final audit and relettered Subsec. (c) as Subsec. (d), effective June 21, 1994; P.A. 95-226 divided Subsec. (a) into Subsecs. (a) and (b) and relettered the remaining Subsecs., in Subsec. (a) specified that the cost be "reasonable", added the requirement concerning chapter 173 and made technical changes, in Subsec. (b) added the requirement for the plan to include an estimated budget for the operation of the facility, specified that the project be authorized by the General Assembly and made technical changes, deleted former Subsec. (d) re reversion and added similar provision to Subsec. (c), and in Subsec. (c) replaced provision requiring the school district to reimburse the state if within three years of completion of the project students from two or more school districts are not participating in the school with provision allowing the commissioner to decide between reversion and reimbursement if the school building ceases to be used for the purpose for which the grant was provided, effective July 1, 1995; P.A. 97-265 amended Subsec. (a) to make a technical change, effective July 1, 1997; P.A. 97-290 amended Subsec. (a) to add provisions re cooperative arrangements for the purposes of an interdistrict magnet school and the limitation on the approval of applications on and after July 1, 1997, to applications that the commissioner finds will reduce racial, ethnic and economic isolation, and amended Subsec. (b) to add the requirement for the plan to include an analysis of the effect of the program on the reduction of racial, ethnic and economic isolation, effective July 1, 1997; P.A. 98-252 and P.A. 98-259 both amended Subsec. (b) to replace a grant in the amount of 5% of the amount authorized for the project with progress payments in accordance with Sec. 10-287i, effective July 1, 1998, and P.A. 98-252 further amended Subsec. (c) to designate existing provisions as Subdiv. (1) and limit applicability to grants for purchase or construction of a facility and to add new Subdiv. (2) re grants for extension or major alteration of a facility, effective June 8, 1998; May 9 Sp. Sess. P.A. 02-5 amended Subsec. (a) by making existing provisions re full reimbursement applicable until June 30, 2002, and by adding provisions re 95% reimbursement for the fiscal year ending June 30, 2003, and fiscal years thereafter, effective July 1, 2002; May 9 Sp. Sess. P.A. 02-6 amended Subsec. (a) by delaying change from full reimbursement to 95% reimbursement until the fiscal year ending June 30, 2004, and fiscal years thereafter, effective July 1, 2002; P.A. 07-249 amended Subsec. (a) to designate existing language as Subdiv. (1) and add Subdiv. (2) re Connecticut Science Center, Inc., effective July 10, 2007; P.A. 08-169 amended Subsec. (a)(1) to designate existing language re fiscal year ending June 30, 2004, as Subpara. (A) and to add Subpara. (B) re fiscal year ending June 30, 2008, and each fiscal year thereafter, and additional entities that operate magnet schools, effective July 1, 2008.

State Codes and Statutes

Statutes > Connecticut > Title10 > Chap172 > Sec10-264h

      Sec. 10-264h. Grants for capital expenditures for interdistrict magnet school facilities. (a)(1) For the fiscal year ending June 30, 1996, until the fiscal year ending June 30, 2003, a local or regional board of education, regional educational service center or a cooperative arrangement pursuant to section 10-158a for purposes of an interdistrict magnet school may be eligible for reimbursement up to the full reasonable cost of any capital expenditure for the purchase, construction, extension, replacement, leasing or major alteration of interdistrict magnet school facilities, including any expenditure for the purchase of equipment, in accordance with this section. (A) For the fiscal year ending June 30, 2004, and each fiscal year thereafter, such entities, and (B) for the fiscal year ending June 30, 2008, and each fiscal year thereafter, the following entities that operate an interdistrict magnet school that assists the state in meeting the goals of the 2008 stipulation and order for Milo Sheff, et al. v. William A. O'Neill, et al., as determined by the commissioner: (i) The Board of Trustees of the Community-Technical Colleges on behalf of a regional community-technical college, (ii) the Board of Trustees of the Connecticut State University System on behalf of a state university, (iii) the Board of Trustees for The University of Connecticut on behalf of the university, (iv) the board of governors for an independent college or university, as defined in section 10a-37, or the equivalent of such a board, on behalf of the independent college or university, and (v) any other third-party not-for-profit corporation approved by the commissioner may be eligible for reimbursement up to ninety-five per cent of such cost. To be eligible for reimbursement under this section a magnet school construction project shall meet the requirements for a school building project established in chapter 173, except that the Commissioner of Education may waive any requirement in such chapter for good cause. On and after July 1, 1997, the commissioner shall approve only applications for reimbursement under this section that he finds will reduce racial, ethnic and economic isolation.

      (2) (A) Not later than July 1, 2007, the Commissioner of Education and the president of the Connecticut Science Center, Inc. shall enter into a memorandum of understanding establishing the parameters within which the center shall operate as and be given the status of a state-wide magnet science learning center. Upon achieving such status, the Connecticut Science Center, Inc. shall be eligible to apply for, in accordance with the provisions of subparagraph (B) of this subdivision, a grant of reimbursement of ninety-five per cent of any expenditures for the construction, replacement, alteration or repair of its facilities, including the reasonable and necessary costs for major exhibits. The Connecticut Science Center, Inc. may fund its five per cent share of expenditures from private contributions.

      (B) To be eligible to receive a grant pursuant to this subdivision, the Connecticut Science Center, Inc. shall file an application with the Commissioner of Education in such form and manner as the commissioner prescribes. Construction projects at the magnet science learning center shall meet the requirements of chapter 173, except that the commissioner may waive any requirements in such chapter for good cause.

      (b) Subject to the provisions of subsection (a) of this section, the applicant shall receive current payments of scheduled estimated eligible project costs for the facility, provided (1) the applicant files an application for a school building project, in accordance with section 10-283 by the date prescribed by the commissioner, (2) final plans and specifications for the project are approved pursuant to sections 10-291 and 10-292, and (3) such district submits to the commissioner, in such form as the commissioner prescribes, and the commissioner approves a plan for the operation of the facility which includes, but need not be limited to: A description of the educational programs to be offered, the completion date for the project, an estimated budget for the operation of the facility, written commitments for participation from the districts that will participate in the school and an analysis of the effect of the program on the reduction of racial, ethnic and economic isolation. The commissioner shall notify the secretary of the State Bond Commission when the provisions of subdivisions (1) and (3) of this subsection have been met. Upon application to the Commissioner of Education, compliance with the provisions of subdivisions (1) and (3) of this subsection and after authorization by the General Assembly pursuant to section 10-283, the applicant shall be eligible to receive progress payments in accordance with the provisions of section 10-287i.

      (c) (1) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the purchase or construction of the facility, the commissioner shall determine whether (A) title to the building and any legal interest in appurtenant land shall revert to the state or (B) the school district shall reimburse the state an amount equal to the difference between the amount received pursuant to this section and the amount the district would have been eligible to receive based on the percentage determined pursuant to section 10-285a multiplied by the estimated eligible project costs. (2) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the extension or major alteration of the facility, the school district shall reimburse the state the amount determined in accordance with subparagraph (B) of subdivision (1) of this subsection. A school district receiving a request for reimbursement pursuant to this subdivision shall reimburse the state not later than the close of the fiscal year following the year in which the request is made. If the school district fails to so reimburse the state, the Department of Education may withhold such amount from the total sum which is paid from the State Treasury to such school district or the town in which it is located or, in the case of a regional school district, the towns which comprise the school district. If the amount paid from the State Treasury is less than the amount due, the department may refer the matter to the Department of Administrative Services for collection.

      (d) The commissioner shall provide for a final audit of all project expenditures pursuant to this section and may require repayment of any ineligible expenditures.

      (P.A. 93-263, S. 9, 14; May Sp. Sess. P.A. 94-2, S. 177, 203; P.A. 95-226, S. 22, 30; P.A. 97-265, S. 84, 98; 97-290, S. 15, 29; P.A. 98-252, S. 20, 63, 80; 98-259, S. 2, 17; May 9 Sp. Sess. P.A. 02-5, S. 7; May 9 Sp. Sess. P.A. 02-6, S. 2; P.A. 07-249, S. 21; P.A. 08-169, S. 27.)

      History: P.A. 93-263 effective June 28, 1993; May Sp. Sess. P.A. 94-2 amended Subsec. (a) to substitute current payments of scheduled estimated eligible project costs for a lump sum payment equal to the highest percentage rate determined pursuant to Sec. 10-285a multiplied by estimated eligible project costs and provided for a grant in an amount equal to 5% of the amount authorized and allocated for the project upon compliance with the provisions of Subdivs. (1) and (3), amended Subsec. (b) to provide for reimbursement to the state of the difference between the amount received pursuant to this section and the amount the school district would have been eligible to receive based on the percentage determined pursuant to Sec. 10-285a multiplied by the estimated eligible project costs if within three years after completion of the project children from at least two or more school districts are not participating in the school and to provide, in such a case, if the school district does not reimburse the state, title to the building shall revert to the state, inserted a new Subsec. (c) on a final audit and relettered Subsec. (c) as Subsec. (d), effective June 21, 1994; P.A. 95-226 divided Subsec. (a) into Subsecs. (a) and (b) and relettered the remaining Subsecs., in Subsec. (a) specified that the cost be "reasonable", added the requirement concerning chapter 173 and made technical changes, in Subsec. (b) added the requirement for the plan to include an estimated budget for the operation of the facility, specified that the project be authorized by the General Assembly and made technical changes, deleted former Subsec. (d) re reversion and added similar provision to Subsec. (c), and in Subsec. (c) replaced provision requiring the school district to reimburse the state if within three years of completion of the project students from two or more school districts are not participating in the school with provision allowing the commissioner to decide between reversion and reimbursement if the school building ceases to be used for the purpose for which the grant was provided, effective July 1, 1995; P.A. 97-265 amended Subsec. (a) to make a technical change, effective July 1, 1997; P.A. 97-290 amended Subsec. (a) to add provisions re cooperative arrangements for the purposes of an interdistrict magnet school and the limitation on the approval of applications on and after July 1, 1997, to applications that the commissioner finds will reduce racial, ethnic and economic isolation, and amended Subsec. (b) to add the requirement for the plan to include an analysis of the effect of the program on the reduction of racial, ethnic and economic isolation, effective July 1, 1997; P.A. 98-252 and P.A. 98-259 both amended Subsec. (b) to replace a grant in the amount of 5% of the amount authorized for the project with progress payments in accordance with Sec. 10-287i, effective July 1, 1998, and P.A. 98-252 further amended Subsec. (c) to designate existing provisions as Subdiv. (1) and limit applicability to grants for purchase or construction of a facility and to add new Subdiv. (2) re grants for extension or major alteration of a facility, effective June 8, 1998; May 9 Sp. Sess. P.A. 02-5 amended Subsec. (a) by making existing provisions re full reimbursement applicable until June 30, 2002, and by adding provisions re 95% reimbursement for the fiscal year ending June 30, 2003, and fiscal years thereafter, effective July 1, 2002; May 9 Sp. Sess. P.A. 02-6 amended Subsec. (a) by delaying change from full reimbursement to 95% reimbursement until the fiscal year ending June 30, 2004, and fiscal years thereafter, effective July 1, 2002; P.A. 07-249 amended Subsec. (a) to designate existing language as Subdiv. (1) and add Subdiv. (2) re Connecticut Science Center, Inc., effective July 10, 2007; P.A. 08-169 amended Subsec. (a)(1) to designate existing language re fiscal year ending June 30, 2004, as Subpara. (A) and to add Subpara. (B) re fiscal year ending June 30, 2008, and each fiscal year thereafter, and additional entities that operate magnet schools, effective July 1, 2008.


State Codes and Statutes

State Codes and Statutes

Statutes > Connecticut > Title10 > Chap172 > Sec10-264h

      Sec. 10-264h. Grants for capital expenditures for interdistrict magnet school facilities. (a)(1) For the fiscal year ending June 30, 1996, until the fiscal year ending June 30, 2003, a local or regional board of education, regional educational service center or a cooperative arrangement pursuant to section 10-158a for purposes of an interdistrict magnet school may be eligible for reimbursement up to the full reasonable cost of any capital expenditure for the purchase, construction, extension, replacement, leasing or major alteration of interdistrict magnet school facilities, including any expenditure for the purchase of equipment, in accordance with this section. (A) For the fiscal year ending June 30, 2004, and each fiscal year thereafter, such entities, and (B) for the fiscal year ending June 30, 2008, and each fiscal year thereafter, the following entities that operate an interdistrict magnet school that assists the state in meeting the goals of the 2008 stipulation and order for Milo Sheff, et al. v. William A. O'Neill, et al., as determined by the commissioner: (i) The Board of Trustees of the Community-Technical Colleges on behalf of a regional community-technical college, (ii) the Board of Trustees of the Connecticut State University System on behalf of a state university, (iii) the Board of Trustees for The University of Connecticut on behalf of the university, (iv) the board of governors for an independent college or university, as defined in section 10a-37, or the equivalent of such a board, on behalf of the independent college or university, and (v) any other third-party not-for-profit corporation approved by the commissioner may be eligible for reimbursement up to ninety-five per cent of such cost. To be eligible for reimbursement under this section a magnet school construction project shall meet the requirements for a school building project established in chapter 173, except that the Commissioner of Education may waive any requirement in such chapter for good cause. On and after July 1, 1997, the commissioner shall approve only applications for reimbursement under this section that he finds will reduce racial, ethnic and economic isolation.

      (2) (A) Not later than July 1, 2007, the Commissioner of Education and the president of the Connecticut Science Center, Inc. shall enter into a memorandum of understanding establishing the parameters within which the center shall operate as and be given the status of a state-wide magnet science learning center. Upon achieving such status, the Connecticut Science Center, Inc. shall be eligible to apply for, in accordance with the provisions of subparagraph (B) of this subdivision, a grant of reimbursement of ninety-five per cent of any expenditures for the construction, replacement, alteration or repair of its facilities, including the reasonable and necessary costs for major exhibits. The Connecticut Science Center, Inc. may fund its five per cent share of expenditures from private contributions.

      (B) To be eligible to receive a grant pursuant to this subdivision, the Connecticut Science Center, Inc. shall file an application with the Commissioner of Education in such form and manner as the commissioner prescribes. Construction projects at the magnet science learning center shall meet the requirements of chapter 173, except that the commissioner may waive any requirements in such chapter for good cause.

      (b) Subject to the provisions of subsection (a) of this section, the applicant shall receive current payments of scheduled estimated eligible project costs for the facility, provided (1) the applicant files an application for a school building project, in accordance with section 10-283 by the date prescribed by the commissioner, (2) final plans and specifications for the project are approved pursuant to sections 10-291 and 10-292, and (3) such district submits to the commissioner, in such form as the commissioner prescribes, and the commissioner approves a plan for the operation of the facility which includes, but need not be limited to: A description of the educational programs to be offered, the completion date for the project, an estimated budget for the operation of the facility, written commitments for participation from the districts that will participate in the school and an analysis of the effect of the program on the reduction of racial, ethnic and economic isolation. The commissioner shall notify the secretary of the State Bond Commission when the provisions of subdivisions (1) and (3) of this subsection have been met. Upon application to the Commissioner of Education, compliance with the provisions of subdivisions (1) and (3) of this subsection and after authorization by the General Assembly pursuant to section 10-283, the applicant shall be eligible to receive progress payments in accordance with the provisions of section 10-287i.

      (c) (1) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the purchase or construction of the facility, the commissioner shall determine whether (A) title to the building and any legal interest in appurtenant land shall revert to the state or (B) the school district shall reimburse the state an amount equal to the difference between the amount received pursuant to this section and the amount the district would have been eligible to receive based on the percentage determined pursuant to section 10-285a multiplied by the estimated eligible project costs. (2) If the school building ceases to be used as an interdistrict magnet school facility and the grant was provided for the extension or major alteration of the facility, the school district shall reimburse the state the amount determined in accordance with subparagraph (B) of subdivision (1) of this subsection. A school district receiving a request for reimbursement pursuant to this subdivision shall reimburse the state not later than the close of the fiscal year following the year in which the request is made. If the school district fails to so reimburse the state, the Department of Education may withhold such amount from the total sum which is paid from the State Treasury to such school district or the town in which it is located or, in the case of a regional school district, the towns which comprise the school district. If the amount paid from the State Treasury is less than the amount due, the department may refer the matter to the Department of Administrative Services for collection.

      (d) The commissioner shall provide for a final audit of all project expenditures pursuant to this section and may require repayment of any ineligible expenditures.

      (P.A. 93-263, S. 9, 14; May Sp. Sess. P.A. 94-2, S. 177, 203; P.A. 95-226, S. 22, 30; P.A. 97-265, S. 84, 98; 97-290, S. 15, 29; P.A. 98-252, S. 20, 63, 80; 98-259, S. 2, 17; May 9 Sp. Sess. P.A. 02-5, S. 7; May 9 Sp. Sess. P.A. 02-6, S. 2; P.A. 07-249, S. 21; P.A. 08-169, S. 27.)

      History: P.A. 93-263 effective June 28, 1993; May Sp. Sess. P.A. 94-2 amended Subsec. (a) to substitute current payments of scheduled estimated eligible project costs for a lump sum payment equal to the highest percentage rate determined pursuant to Sec. 10-285a multiplied by estimated eligible project costs and provided for a grant in an amount equal to 5% of the amount authorized and allocated for the project upon compliance with the provisions of Subdivs. (1) and (3), amended Subsec. (b) to provide for reimbursement to the state of the difference between the amount received pursuant to this section and the amount the school district would have been eligible to receive based on the percentage determined pursuant to Sec. 10-285a multiplied by the estimated eligible project costs if within three years after completion of the project children from at least two or more school districts are not participating in the school and to provide, in such a case, if the school district does not reimburse the state, title to the building shall revert to the state, inserted a new Subsec. (c) on a final audit and relettered Subsec. (c) as Subsec. (d), effective June 21, 1994; P.A. 95-226 divided Subsec. (a) into Subsecs. (a) and (b) and relettered the remaining Subsecs., in Subsec. (a) specified that the cost be "reasonable", added the requirement concerning chapter 173 and made technical changes, in Subsec. (b) added the requirement for the plan to include an estimated budget for the operation of the facility, specified that the project be authorized by the General Assembly and made technical changes, deleted former Subsec. (d) re reversion and added similar provision to Subsec. (c), and in Subsec. (c) replaced provision requiring the school district to reimburse the state if within three years of completion of the project students from two or more school districts are not participating in the school with provision allowing the commissioner to decide between reversion and reimbursement if the school building ceases to be used for the purpose for which the grant was provided, effective July 1, 1995; P.A. 97-265 amended Subsec. (a) to make a technical change, effective July 1, 1997; P.A. 97-290 amended Subsec. (a) to add provisions re cooperative arrangements for the purposes of an interdistrict magnet school and the limitation on the approval of applications on and after July 1, 1997, to applications that the commissioner finds will reduce racial, ethnic and economic isolation, and amended Subsec. (b) to add the requirement for the plan to include an analysis of the effect of the program on the reduction of racial, ethnic and economic isolation, effective July 1, 1997; P.A. 98-252 and P.A. 98-259 both amended Subsec. (b) to replace a grant in the amount of 5% of the amount authorized for the project with progress payments in accordance with Sec. 10-287i, effective July 1, 1998, and P.A. 98-252 further amended Subsec. (c) to designate existing provisions as Subdiv. (1) and limit applicability to grants for purchase or construction of a facility and to add new Subdiv. (2) re grants for extension or major alteration of a facility, effective June 8, 1998; May 9 Sp. Sess. P.A. 02-5 amended Subsec. (a) by making existing provisions re full reimbursement applicable until June 30, 2002, and by adding provisions re 95% reimbursement for the fiscal year ending June 30, 2003, and fiscal years thereafter, effective July 1, 2002; May 9 Sp. Sess. P.A. 02-6 amended Subsec. (a) by delaying change from full reimbursement to 95% reimbursement until the fiscal year ending June 30, 2004, and fiscal years thereafter, effective July 1, 2002; P.A. 07-249 amended Subsec. (a) to designate existing language as Subdiv. (1) and add Subdiv. (2) re Connecticut Science Center, Inc., effective July 10, 2007; P.A. 08-169 amended Subsec. (a)(1) to designate existing language re fiscal year ending June 30, 2004, as Subpara. (A) and to add Subpara. (B) re fiscal year ending June 30, 2008, and each fiscal year thereafter, and additional entities that operate magnet schools, effective July 1, 2008.