IC 8-1.5-5
Chapter 5. Department of Storm Water Management
IC 8-1.5-5-1 Application of chapter
Sec. 1. This chapter applies to each:
(1) municipality; and
(2) county that:
(A) does not have a consolidated city; and
(B) receives notification from the department of
environmental management that the county will be subject
to storm water regulation under 327 IAC 15-13;
that adopts the provisions of this chapter by ordinance. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.2.
IC 8-1.5-5-1.5 Definitions
Sec. 1.5. The definitions in IC 36-1-2 apply throughout this
chapter. As added by P.L.282-2003, SEC.3.
IC 8-1.5-5-2 "Board" defined
Sec. 2. As used in this chapter, "board" means the following:
(1) For a consolidated city, the board of public works
established by IC 36-3-5-6.
(2) For all other municipalities, the:
(A) board of directors described in section 4 of this chapter;
or
(B) board that controls the third class city's municipally
owned utilities under IC 8-1.5-3-3(a) if the city has adopted
an ordinance under IC 8-1.5-3-3(a) that provides for the
control of any or all of the city's storm water facilities by the
board that controls the city's municipally owned utilities.
(3) For a county:
(A) the county executive; and
(B) the county surveyor. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.3;
P.L.98-1993, SEC.1; P.L.282-2003, SEC.4.
IC 8-1.5-5-3 "Department" defined
Sec. 3. As used in this chapter, "department" means the following:
(1) For a consolidated city, the department of public works.
(2) For all other municipalities, the department of storm water
management established under section 4 of this chapter.
(3) For a county, the department of storm water management
established under section 4.5 of this chapter. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.4;
P.L.98-1993, SEC.2; P.L.282-2003, SEC.5.
IC 8-1.5-5-3.5 "District" defined
Sec. 3.5. As used in this chapter, "district" means the special
taxing district established by section 5 of this chapter. As added by P.L.93-1993, SEC.5 and P.L.98-1993, SEC.3.
IC 8-1.5-5-4 Board of storm water management; directors
Sec. 4. (a) This section applies to all municipalities except a
consolidated city.
(b) If the legislative body of a municipality adopts the provisions
of this chapter by ordinance, a department of storm water
management is established and is controlled by a board of directors.
(c) Except as provided in subsections (f) and (g), the board
consists of three (3) directors. The executive of the municipality shall
appoint the directors, not more than two (2) of whom may be of the
same political party.
(d) Except as provided in subsections (f) and (g), the legislative
body shall prescribe, by ordinance, the terms of the directors.
However, the legislative body must prescribe the initial terms of the
directors so that they will be staggered.
(e) The executive may remove a director at any time when, in the
judgment of the executive, it is for the best interest of the
department.
(f) If a second class city has a department of public sanitation
under IC 36-9-25, the executive of the city may appoint the members
of the board of sanitary commissioners as the board of directors of
the department of storm water management. The terms of the
members of the board of directors are the same as the terms of the
members of the board of sanitary commissioners under IC 36-9-25-4.
(g) If a third class city:
(1) has a board that controls the city's municipally owned
utilities under IC 8-1.5-3-3(a); and
(2) has adopted an ordinance under IC 8-1.5-3-3(a) that
provides for the control of any or all of the city's storm water
facilities by the board that controls the city's municipally owned
utilities;
the members of the board that controls the city's municipally owned
utilities shall serve as the board of directors of the department of
storm water management, subject to any transition procedure
specified in the ordinance under IC 8-1.5-3-3(b). The terms of the
members of the board of directors are the same as the terms of the
members of the board that controls the city's municipally owned
utilities under IC 8-1.5-3-3(a), subject to the completion of any
transition procedure specified in the ordinance under IC 8-1.5-3-3(b).
(h) A member of the board of directors of the department of storm
water management who:
(1) is appointed under subsection (f); or
(2) is a member of the board under subsection (g) and receives
a salary as a member of the board that controls the third class
city's municipally owned utilities;
is not entitled to a salary for serving as a member of the board of
directors of the department of storm water management. However,
a member shall be reimbursed for necessary expenses incurred by the
member in the performance of official duties. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.6;
P.L.98-1993, SEC.4; P.L.5-1998, SEC.1; P.L.282-2003, SEC.6.
IC 8-1.5-5-4.5 County department of storm water management; board of
directors; compensation
Sec. 4.5. (a) This section applies to a county.
(b) If the county executive adopts the provisions of this chapter by
ordinance, a department of storm water management is established
and is controlled by a board of directors.
(c) An ordinance adopted under this section shall provide for the
appointment of:
(1) the members of the county executive; and
(2) the county surveyor;
as the board of directors of the department. The term of office of a
member of the board who is appointed from the membership of the
county executive is coextensive with the member's term of office on
the county executive. The term of the surveyor or the surveyor's
designee as a member of the board is coextensive with the surveyor's
term of office.
(d) A member of the board of directors is not entitled to a salary
or per diem for serving as a member of the board of directors.
However, a member shall be reimbursed for necessary expenses
incurred by the member in the performance of official duties. As added by P.L.282-2003, SEC.7.
IC 8-1.5-5-5 Special taxing district
Sec. 5. (a) The ordinance adopting the provisions of this chapter
creates a special taxing district that includes the following:
(1) For a consolidated city, all of the territory of the county
containing the consolidated city.
(2) For all other municipalities, all territory within the corporate
boundaries of the municipality.
(3) For a county, all the territory in the county that is not
located in a municipality.
(b) All the territory within the district constitutes a special taxing
district for the purpose of providing for the collection and disposal
of storm water of the district in a manner that protects the public
health and welfare and for the purpose of levying special benefit
taxes for purposes of storm water collection and disposal. All
territory in the district and all territory added to the district is
considered to have received a special benefit from the storm water
collection and disposal facilities of the district equal to or greater
than the special taxes imposed on the territory under this chapter in
order to pay all or part of the costs of such facilities. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.7;
P.L.98-1993, SEC.5; P.L.282-2003, SEC.8.
IC 8-1.5-5-6 Powers of board
Sec. 6. The board has the powers and duties prescribed by
IC 8-1.5-3-4(a). In addition, the board may:
(1) hold hearings following public notice;
(2) make findings and determinations;
(3) install, maintain, and operate a storm water collection and
disposal system;
(4) make all necessary or desirable improvements of the
grounds and premises under its control; and
(5) issue and sell bonds of the district in the name of the unit
served by the department for the acquisition, construction,
alteration, addition, or extension of the storm water collection
and disposal system or for the refunding of any bonds issued by
the board. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.9.
IC 8-1.5-5-7 Financing of facilities; user fees
Sec. 7. (a) The acquisition, construction, installation, operation,
and maintenance of facilities and land for storm water systems may
be financed through:
(1) proceeds of special taxing district bonds of the storm water
district;
(2) the assumption of liability incurred to construct the storm
water system being acquired;
(3) service rates;
(4) revenue bonds; or
(5) any other available funds.
(b) Except as provided in IC 36-9-23-37, the board, after holding
a public hearing with notice given under IC 5-3-1 and obtaining the
approval of the fiscal body of the unit served by the department, may
assess and collect user fees from all of the property of the storm
water district for the operation and maintenance of the storm water
system. The amount of the user fees must be the minimum amount
necessary for the operation and maintenance of the storm water
system. The assessment and collection of user fees under this
subsection by the board of a county must also be approved by the
county executive.
(c) The collection of the fees authorized by this section may be
effectuated through a periodic billing system or through a charge
appearing on the semiannual property tax statement of the affected
property owner.
(d) The board shall use one (1) or more of the following factors
to establish the fees authorized by this section:
(1) A flat charge for each lot, parcel of property, or building.
(2) The amount of impervious surface on the property.
(3) The number and size of storm water outlets on the property.
(4) The amount, strength, or character of storm water
discharged.
(5) The existence of improvements on the property that address
storm water quality and quantity issues.
(6) The degree to which storm water discharged from the
property affects water quality in the storm water district.
(7) Any other factors the board considers necessary.
(e) The board may exercise reasonable discretion in adopting
different schedules of fees or making classifications in schedules of
fees based on:
(1) variations in the costs, including capital expenditures, of
furnishing services to various classes of users or to various
locations;
(2) variations in the number of users in various locations; and
(3) whether the property is used primarily for residential,
commercial, or agricultural purposes. As added by P.L.125-1987, SEC.1. Amended by P.L.176-2002,
SEC.6; P.L.282-2003, SEC.10; P.L.114-2008, SEC.3.
IC 8-1.5-5-8 Fixing and setting aside revenues
Sec. 8. The board may fix and set aside:
(1) revenues of the department necessary for reasonable and
proper operation and maintenance;
(2) revenues for a proper and adequate depreciation account;
and
(3) revenues to be applied to the payment of the principal and
interest of the authorized bonds. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-9 Maintenance account; surplus
Sec. 9. (a) In fixing the revenues of the department required for
operation and maintenance, the board shall consider the cost of the
operation and maintenance of the department.
(b) If a surplus is accumulated in the operating and maintenance
account, the board may transfer any excess over that surplus to:
(1) the depreciation account, to be used for any improvements,
extensions, or additions to the storm water system; or
(2) the bond and interest redemption account. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-10 Bond and interest redemption account; surplus
Sec. 10. (a) The revenues set aside for the payment of the
principal and interest of the authorized bonds shall be deposited and
credited to a special account identified as "the bond and interest
redemption account".
(b) In determining the amount that is to be set aside for the
payment of the principal and interest of the authorized bonds, the
board may provide that the amount to be set aside and paid into the
bond and interest redemption account for any year or years should
not exceed a fixed sum, which must be at least sufficient to provide
for the payment of the interest and principal of the bonds maturing
and becoming payable in each year.
(c) If a surplus is created in the bond and interest redemption
account, the board may transfer any excess over the surplus to:
(1) the operation and maintenance account; or
(2) the depreciation account. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-11 Depreciation account; use of revenues
Sec. 11. The revenues set aside to the depreciation account shall
be expended for:
(1) the repair of the storm water system;
(2) new acquisition, construction, extensions, or additions to the
property of the storm water system; or
(3) transfer to the bond and interest redemption account to
prevent a default. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-12 Assumption and payment of liability upon acquisition of storm
water system
Sec. 12. (a) If the board acquires a storm water system and
assumes the liability incurred by the seller to construct the storm
water system, the principal and interest on the liability so assumed
shall be paid from the bond and interest redemption account in the
same manner as bonds of the district would be paid, and the board
shall set aside sufficient revenues to comply with the requirements
of the instrument creating the liability.
(b) A unit acquiring a storm water system may not assume any
liability for the payment of a secured debt or charge other than the
obligation to apply the revenues in the manner prescribed in the
ordinance.
(c) The board may issue bonds in exchange for, or satisfaction of,
the liability assumed in the acquisition of a storm water system. The
bonds so issued may not be issued at less than ninety-seven percent
(97%) of the par value thereof in exchange for, or satisfaction of, the
liability. Notwithstanding section 13(c) of this chapter, bonds issued
in exchange for, or satisfaction of, the liability need not be sold in
accordance with IC 5-1-11. However, the interest rate on such bonds
may not exceed the average yield on municipal revenue bonds of
comparable credit rating and maturity as of the end of the week
immediately preceding the issuance of the bonds. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.11.
IC 8-1.5-5-13 District bonds; nature
Sec. 13. (a) The bonds of the district are:
(1) a valid claim of the holders only against the bond and
interest redemption account and the revenues of the storm water
system; and
(2) exempt from taxation in Indiana as provided by IC 6-8-5.
(b) The bonds may be issued either as registered bonds or as
coupon bonds payable to the bearer.
(c) Except as provided in this chapter or IC 5-1-5, bonds shall be
sold in accordance with IC 5-1-11. The registration of bonds does not
affect negotiability. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-14 Bond issue
Sec. 14. A board acquiring a storm water system and paying for
it and for extensions and betterments authorized at the time of
acquisition may provide for the combined cost in one (1) issue of
bonds. The board shall issue and secure the bonds in the manner
provided in this chapter to provide funds for the original construction
of a storm water system. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-15 Use of bond proceeds; actions to compel performance; actions
upon default
Sec. 15. (a) All money received from bonds issued under this
chapter shall be applied solely to the acquisition, construction, repair,
and maintenance of the storm water system, the cost of the issuance
of the bonds, and the creation of any reserve for the bonds.
(b) Any holder of the bonds may bring a civil action to compel
performance of all duties required by this chapter of the board
issuing the bonds or of any officer of the board, including the
following:
(1) Making and collecting reasonable and sufficient user fees
lawfully established for service rendered by the storm water
system.
(2) Segregating the income and revenues of the department.
(3) Applying the respective funds created under this chapter.
(c) If there is any default in the payment of the principal or
interest of any of the bonds, a court having jurisdiction of the action
may:
(1) appoint an administrator or receiver to administer the storm
water system on behalf of the unit served by the department and
the bondholders, with power to:
(A) charge and collect user fees lawfully established
sufficient to provide for the payment of the operating
expenses and also to pay any bonds or obligations
outstanding against the storm water system; and
(B) apply the income and revenues in conformity with this
chapter and the ordinance; or
(2) declare the whole amount of the bonds due and payable and
direct the sale of the storm water system.
Under a sale ordered under subdivision (2), the purchaser is vested
with an indeterminate permit as defined in IC 8-1-2-1 to maintain and
operate the storm water system to collect and dispose of storm water
for the unit served by the department and its citizens. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.12.
IC 8-1.5-5-16 Charge for services in a municipality; deposit of funds
Sec. 16. (a) This section applies to a municipality.
(b) The reasonable cost and value of any service rendered to the
municipality by the storm water system by furnishing storm water
collection and disposal shall be:
(1) charged against the municipality; and
(2) paid for as the service accrues out of:
(A) the current revenues of the municipality, collected or in
process of collection; or
(B) the tax levy of the municipality made by it to raise
money to meet its necessary current expenses.
(c) The compensation for the service provided to the municipality
shall, in the manner prescribed by this chapter, be treated as revenues
of the system and paid into the funds created under this chapter. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.13.
IC 8-1.5-5-16.5 Charge for services in a county; deposit of funds
Sec. 16.5. (a) This section applies to a county.
(b) The reasonable cost and value of any service rendered to the
county by the storm water system by furnishing storm water
collection and disposal shall be:
(1) charged against all the territory in the county, except
territory within a municipality; and
(2) paid for as the service accrues out of:
(A) the current revenues of the county, collected or in
process of collection; or
(B) the tax levy of the county made by the county to raise
money to meet the county's necessary current expenses.
(c) The compensation for the service provided to the county shall,
in the manner prescribed by this chapter, be treated as revenues of
the system and paid into the funds created under this chapter. As added by P.L.282-2003, SEC.14. IC 8-1.5-5-17 Proposed projects; resolution; notice to property owners;
preadoption contracts for purchase
Sec. 17. (a) If, upon investigation, the board finds that:
(1) the storm water system is insufficient to furnish the
necessary collection and disposal of storm water to properly
protect the public health and welfare and safeguard the property
within the district; or
(2) it is necessary to acquire, construct, rebuild, repair, extend,
and improve the storm water system and equipment, to acquire
lands, or to construct, erect, or acquire other systems and other
structures and equipment appurtenant to them;
the board shall prepare maps, plans, specifications, and drawings
with full details and descriptions for the proposed work, together
with an estimate of the cost. The board shall also prepare a
description of all property rights necessary to be acquired in
connection with the proposed work and the manner in which the
rights are to be acquired, whether by purchase or appropriation,
along with a description of any other property that may be injuriously
affected, together with the estimated cost.
(b) The board shall then adopt a resolution approving the project
by:
(1) declaring that it is necessary for the protection of the public
health and welfare of the inhabitants of the storm water district
and the safeguarding of the property within the district;
(2) declaring that it is of public utility and benefit;
(3) appropriating the property described in the resolution;
(4) stating the maximum proposed cost of any land to be
purchased; and
(5) adopting plans, maps, specifications, drawings, details,
descriptions, and estimates.
(c) If the resolution is adopted, the board shall publish a notice in
accordance with IC 5-3-1 of the adoption of the resolution and of the
fact that plans, specifications, and estimates have been prepared and
can be inspected. The notice must also name a date, not less than ten
(10) days after the date of the last publication, when the board will
receive or hear remonstrances from the persons interested in, or
affected by, the resolution, and when it will determine the public
utility and benefit of the project. Notice shall be mailed to the owners
of all property appropriated by the resolution. If a landowner is a
nonresident and the landowner's place of residence is known, a
notice shall be mailed to the nonresident owner. If the nonresident
owner's residence is unknown to the board, then the owner is
considered notified of the pendency of the proceedings by the
publication of notice.
(d) Separate descriptions of each piece or parcel of land are not
required in the resolution and notice, but it is a sufficient description
of the property purchased or to be purchased, or to be appropriated
or damaged, to give a description of the entire tract, whether it is one
(1) or more lots or parcels and whether it is owned by one (1) or
more persons.
(e) All persons affected by the proceedings, including all
taxpayers in the storm water district, are considered to be notified of
the proceedings and all subsequent acts, hearings, adjournments, and
orders of the board by the original publication of notice.
(f) The board may, before adoption of the resolution, obtain from
the owners of the property an option for its purchase or may enter
into a contract for its purchase after an appraisal by two (2) qualified
land appraisers. An option or contract is subject to the final action of
the board confirming, modifying, or rescinding the resolution. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-18 Remonstrances
Sec. 18. (a) At the time fixed for the hearing or before the hearing,
the following persons may file a written remonstrance with the
board:
(1) The owner of real property, rights-of-way, or other property
to be appropriated under the resolution.
(2) A person injuriously affected by the appropriation.
(3) A person owning real or personal property within the storm
water district.
(b) The board shall:
(1) hear all persons interested in the proceedings;
(2) hear all the remonstrances that have been filed; and
(3) take action to confirm, modify, or reject the resolution. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-19 Appeal
Sec. 19. (a) A person who has remonstrated in writing and is
aggrieved by the decision of the board may, within thirty (30) days,
take an appeal to the circuit or superior court of the county in which
the storm water district is located.
(b) A remonstrator desiring to appeal the action of the board shall,
within thirty (30) days after the final action of the board, file in the
office of the clerk of the circuit or superior court a copy of the order
of the board and the remonstrance, together with a bond conditioned
to pay the costs of the appeal, should the appeal be determined
against the remonstrator.
(c) The court may hear the appeal only if the question is whether
the board acted arbitrarily or capriciously in adopting the resolution.
(d) The cause shall be tried by the court without a jury.
(e) All remonstrances upon which appeals are taken may be
consolidated and heard as one (1) claim for relief by the court. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-20 Property held in name of unit served by the department
Sec. 20. All real property, rights-of-way, or other property
acquired by purchase or appropriation shall be taken and held in the
name of the unit served by the department. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.15.
IC 8-1.5-5-21 Bonds for proposed work projects
Sec. 21. (a) To procure money to pay for the required property
and the acquisition, erection, and construction of the proposed work,
and in anticipation of the collection of the special benefit tax, the
board may issue, in the name of the unit served by the department,
special taxing district bonds of the storm water district. The bonds
may not exceed the total estimated cost of the work and property to
be acquired as provided for in the resolution, including:
(1) all expenses necessarily incurred for supervision and
inspection during the period of construction; and
(2) expenses actually incurred preliminary to the acquiring of
the necessary property and the construction of the work,
including the cost of records, engineering expenses, publication
of notices, salaries, and other expenses incurred, before and in
connection with the acquiring of the property, the letting of the
contract, and the sale of bonds.
(b) After adopting a resolution authorizing the bonds, the board
shall certify a copy of the resolution to the fiscal officer, who shall
then prepare the bonds. The executive shall execute the bonds, and
the fiscal officer shall attest the bonds.
(c) The board may not issue bonds of the storm water district,
payable by a special benefit property tax, when the total of the
outstanding bonds of the district that are payable from a special
benefit property tax, including the bonds already issued and to be
issued, exceeds eight percent (8%) of the total adjusted value of
taxable property in the district as determined under IC 36-1-15. For
purposes of this section, bonds are not considered to be outstanding
bonds if the payment has been provided for by an irrevocable deposit
in escrow of government obligations sufficient to pay the bonds
when due or called for redemption.
(d) The bonds are not a corporate obligation or indebtedness of
the unit but are an indebtedness of the storm water district. The
bonds and interest are payable:
(1) out of a special benefit tax levied upon all of the property of
the storm water district; or
(2) by any other means including revenues, cash on hand, and
cash in depreciation or reserve accounts.
(e) The bonds must recite the terms upon their face, together with
the purpose for which they are issued. As added by P.L.125-1987, SEC.1. Amended by P.L.6-1997,
SEC.132; P.L.282-2003, SEC.16.
IC 8-1.5-5-22 Special benefit tax
Sec. 22. (a) To raise the necessary revenues to pay for the bonds
issued and the interest on the bonds, the board:
(1) after approval by the fiscal body of the unit served by the
department, shall levy a special benefit tax upon all the property
of the storm water district in the amount necessary to meet and
pay the principal of the bonds as they severally mature, together
with all accruing interest; and
(2) shall certify the tax levied each year to the fiscal officer of
the unit served by the department at the same time and in the
same manner as other levies of the unit are certified.
The tax levied and certified shall be estimated and entered upon the
tax duplicate and shall be collected and enforced in the same manner
as state and county taxes are estimated, entered, and enforced.
(b) In fixing the amount of the necessary levy, the board:
(1) shall consider the amount of revenues derived by the board
from the operation of the storm water system under its
jurisdiction above the amount of revenues required to pay the
cost of operation and maintenance of the storm water system;
and
(2) may, in lieu of making the levy in this section, set aside by
resolution a specific amount of the surplus revenues to be
collected before maturity of the principal and interest of the
bonds payable in the following calendar year.
(c) The special tax shall be deposited in the bond and interest
redemption account. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.17.
IC 8-1.5-5-23 Approval of bond issuance by unit served by the department;
applicability of IC 6-1.1-20
Sec. 23. (a) The board may not issue any bonds authorized by this
chapter until it has secured the approval for the issuance of the bonds
from the fiscal body of the unit served by the department.
(b) IC 6-1.1-20 applies to the issuance of bonds under this chapter
which are or may be payable from the special benefit property tax. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.18.
IC 8-1.5-5-24 Combined sanitary sewer and storm water system projects
Sec. 24. (a) Whenever work on a storm water system (that is
combined with a sanitary sewer system) necessitates the repair or
replacement of all or part of a sanitary sewer system, the entity that
owns or maintains the sanitary sewer system shall assume a
proportionate share of the cost of repairing or replacing the sanitary
sewer system.
(b) The board and the entity that owns or manages the sanitary
sewer system shall negotiate the division of the costs described in
subsection (a).
(c) If the parties cannot agree to a division of the costs, they shall
petition the circuit court of the county where the majority of the
systems are located to divide the costs. The circuit court shall hold
a hearing on the division of costs within sixty (60) days after
receiving the petition. The court shall publish notice of the hearing
in accordance with IC 5-3-1. The decision of the court is binding on
both parties. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-25 Use of bond payment revenues; pledge of user fees; reductions in
fees
Sec. 25. (a) Revenues received by the department may be used to
pay for bonds issued to acquire, construct, install, operate, and
maintain facilities and land for storm water collection and disposal
systems.
(b) If there are bonds outstanding for which user fees were
pledged, the board may not rescind user fees or reduce them below
a rate that would produce one hundred twenty-five percent (125%)
of the highest annual debt service on the bonds issued under this
chapter to their final maturity, based on an average of the
immediately preceding three (3) years of user fee collections, if the
user fees have been levied for the preceding three (3) years. If the
user fees have not been levied for the preceding three (3) years, the
board may not reduce user fees below a rate that would produce one
hundred twenty-five percent (125%) of the highest debt service,
based upon a study by a qualified public accountant or financial
adviser. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-26 User fee pledges; effect of amendments or repeal of chapter
Sec. 26. With respect to bonds for which a pledge has been made
under section 25 of this chapter, the general assembly covenants with
the holders of these bonds that:
(1) this chapter will not be repealed or amended in a manner
that will adversely affect the imposition or collection of the user
fees under this chapter; and
(2) this chapter will not be amended in a manner that will
change the purpose for which revenues from the user fees
imposed under this chapter may be used;
as long as those bonds are outstanding. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-27 Maintenance of private property by the department
Sec. 27. If the department:
(1) uses private property for storm water collection or disposal;
and
(2) obtains the consent of the owner of the private property to
maintain the private property;
the department shall maintain the private property. As added by P.L.282-2003, SEC.19.
IC 8-1.5-5-28 Screening of storm water outfalls
Sec. 28. A person may not be required to screen a storm water
outfall if the pipe diameter of the storm water outfall is less than
twenty-four (24) inches. As added by P.L.282-2003, SEC.20.
IC 8-1.5-5-29 Liens for unpaid fees
Sec. 29. (a) Subsections (c), (d), and (e) do not apply to a city that
before January 1, 2005, adopted an ordinance establishing
procedures for the collection of unpaid user fees under this chapter
through the enforcement of a lien.
(b) Fees assessed against real property under this chapter
constitute a lien against the property assessed. The lien is superior to
all other liens except tax liens. Except as provided in subsections (c)
and (d), the lien attaches when notice of the lien is filed in the county
recorder's office under section 30 of this chapter.
(c) A fee is not enforceable as a lien against a subsequent owner
of property unless the lien for the fee was recorded with the county
recorder before the conveyance to the subsequent owner. If property
is conveyed before a lien is filed, the department shall notify the
person who owned the property at the time the fee became payable.
The notice must inform the person that payment, including penalty
fees for delinquencies, is due not more than fifteen (15) days after
the date of the notice. If payment is not received within one hundred
eighty (180) days after the date of the notice, the amount due may be
expensed as a bad debt loss.
(d) A lien attaches against real property occupied by someone
other than the owner only if the department notifies the owner within
twenty (20) days after the time the user fees became sixty (60) days
delinquent. However, the department must give notice to the owner
only if the owner has given the department written notice of the
address to which to send notice.
(e) The department shall release:
(1) liens filed with the county recorder after the recorded date
of conveyance of the property; and
(2) delinquent fees incurred by the seller;
upon receipt of a verified demand in writing from the purchaser. The
demand must state that the delinquent fees were not incurred by the
purchaser as a user, lessee, or previous owner and that the purchaser
has not been paid by the seller for the delinquent fees. As added by P.L.131-2005, SEC.1.
IC 8-1.5-5-30 Recording and collection of liens; filing fees
Sec. 30. (a) The board may defer enforcing the collection of
unpaid fees and penalties assessed under this chapter until the unpaid
fees and penalties have been due and unpaid for at least ninety (90)
days.
(b) Except as provided in subsection (k), the board shall enforce
payment of fees imposed under this chapter. As often as the board
determines necessary in a calendar year, the board shall prepare
either of the following:
(1) A list of the delinquent fees and penalties that are
enforceable under this section. The list must include the
following:
(A) The name of the owner of each lot or parcel of real
property on which fees are delinquent.
(B) A description of the premises, as shown by the records
of the county auditor.
(C) The amount of the delinquent fees, together with the
penalty.
(2) An individual instrument for each lot or parcel of real
property on which the fees are delinquent.
(c) An officer of the board shall record a copy of each list or each
individual instrument with the county recorder who shall charge a fee
for recording the list or each individual instrument in accordance
with the fee schedule established in IC 36-2-7-10. The officer shall
mail by certified mail, or by another delivery service providing proof
of delivery, to each property owner on the list or on an individual
instrument a notice stating that a lien against the owner's property
has been recorded. A service charge of five dollars ($5), which is in
addition to the recording fee charged under this subsection and under
subsection (e), shall be added to each delinquent fee that is recorded.
(d) Using the lists and instruments prepared under subsection (b)
and recorded under subsection (c), the board shall, not later than ten
(10) days after the list or each individual instrument is recorded
under subsection (c), certify to the county auditor a list of the liens
that remain unpaid for collection in the next May. The county and its
officers and employees are not liable for any material error in the
information on this list.
(e) The board shall release any recorded lien when the delinquent
fees, penalties, service charges, and recording fees have been fully
paid. The county recorder shall charge a fee for releasing the lien in
accordance with IC 36-2-7-10.
(f) Upon receipt of the list under subsection (c), the county auditor
of each county shall add a fifteen dollar ($15) certification fee for
each lot or parcel of real property on which fees are delinquent. The
fee is in addition to all other fees and charges. The county auditor
shall immediately enter on the tax duplicate for the district the
delinquent fees, penalties, service charges, recording fees, and
certification fees, which are due not later than the due date of the
next May installment of property taxes. The county treasurer shall
include any unpaid charges for the delinquent fee, penalty, service
charge, recording fee, and certification fee to the owner or owners of
each lot or parcel of property, at the time the next cycle's property tax
installment is billed.
(g) After certification of liens under subsection (d), the board may
not collect or accept delinquent fees, penalties, service charges,
recording fees, or certification fees from property owners whose
property has been certified to the county auditor.
(h) If a delinquent fee, penalty, service charge, recording fee, and
certification fee are not paid, they shall be collected by the county
treasurer in the same way that delinquent property taxes are
collected.
(i) At the time of each semiannual tax settlement, the county
treasurer shall certify to the county auditor all fees, charges, and
penalties that have been collected. The county auditor shall deduct
the service charges and certification fees collected by the county
treasurer and pay over to the officer the remaining fees and penalties
due the district. The county treasurer shall retain the service charges
and certification fees that have been collected and shall deposit them
in the county general fund.
(j) Fees, penalties, and service charges that were not recorded
before a recorded conveyance shall be removed from the tax roll for
a purchaser who, in the manner prescribed by section 29(e) of this
chapter, files a verified demand with the county auditor.
(k) A board may write off a fee or penalty under subsection (a)
that is less than forty dollars ($40). As added by P.L.131-2005, SEC.2.
IC 8-1.5-5-31 Foreclosure of liens
Sec. 31. (a) A district may foreclose a lien established by this
chapter in order to collect fees and penalties. The district shall
recover the amount of the fees and penalties, and a reasonable
attorney's fee. The court shall order the sale to be made without relief
from valuation or appraisement laws.
(b) Except as otherwise provided by this chapter, actions under
this chapter are subject to the general statutes regarding municipal
public improvement assessments. As added by P.L.131-2005, SEC.3.
IC 8-1.5-5-32 Withdrawal from district by excluded municipality; notice;
outstanding bonds; payments to municipality
Sec. 32. (a) This section applies to excluded cities and towns in
a county containing a consolidated city.
(b) A municipality to which this section applies may withdraw
from the district established by the consolidated city if the municipal
legislative body adopts an ordinance withdrawing the municipality
from the district. The municipal legislative body shall, at least thirty
(30) days before the final vote on the ordinance, mail written notice
of the meeting to the following:
(1) All owners of lots and parcels within the municipality that
are subject to storm water user fees imposed in the district by
the department of public works of the consolidated city.
(2) The department of public works of the consolidated city.
(c) An ordinance described in subsection (b) takes effect sixty
(60) days after adoption by the municipal legislative body.
(d) In addition to the notice required by subsection (b), if a
municipal legislative body adopts an ordinance under subsection (b),
the municipal legislative body shall mail written notice of the
withdrawal from the district to the department of public works of the
consolidated city not more than thirty (30) days after the ordinance
becomes effective.
(e) If on the date of a municipality's withdrawal from the district
there are bonds outstanding that have been issued by the board of
public works of the consolidated city, the municipality is liable for
and shall pay that indebtedness in the same ratio as the assessed
valuation of the property in the municipality bears to the assessed
valuation of all property included in the district on the date one (1)
day before the date of withdrawal, as shown in the most recent
assessment for taxation before the date of withdrawal.
(f) If a municipal legislative body adopts an ordinance under
subsection (b), the municipality is entitled to receive the following:
(1) An annual lump sum payment equal to the total amount of
property taxes paid and allocated to the district's flood debt
service fund from all property taxpayers within the
municipality, to the extent the property taxes are not necessary
to pay the indebtedness owed by the municipality under
subsection (e). A payment under this subdivision is required for
property taxes assessed beginning on the January 1 preceding
the effective date of the municipality's withdrawal from the
district.
(2) The total amount of storm water user fees collected by the
department of public works of the consolidated city from the
lots and parcels in the municipality beginning on the January 1
preceding the effective date of the municipality's withdrawal
from the district.
(g) Payments received under subsection (f):
(1) shall be deposited by the municipality in a dedicated fund;
and
(2) may be used by the municipality only for purposes of storm
water management in the municipality and may not be diverted,
directly or indirectly, in any manner to any use other than the
purposes of storm water management in the municipality. As added by P.L.52-2006, SEC.1 and P.L.175-2006, SEC.1. Amended
by P.L.154-2006, SEC.65.
IC 8-1.5-5
Chapter 5. Department of Storm Water Management
IC 8-1.5-5-1 Application of chapter
Sec. 1. This chapter applies to each:
(1) municipality; and
(2) county that:
(A) does not have a consolidated city; and
(B) receives notification from the department of
environmental management that the county will be subject
to storm water regulation under 327 IAC 15-13;
that adopts the provisions of this chapter by ordinance. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.2.
IC 8-1.5-5-1.5 Definitions
Sec. 1.5. The definitions in IC 36-1-2 apply throughout this
chapter. As added by P.L.282-2003, SEC.3.
IC 8-1.5-5-2 "Board" defined
Sec. 2. As used in this chapter, "board" means the following:
(1) For a consolidated city, the board of public works
established by IC 36-3-5-6.
(2) For all other municipalities, the:
(A) board of directors described in section 4 of this chapter;
or
(B) board that controls the third class city's municipally
owned utilities under IC 8-1.5-3-3(a) if the city has adopted
an ordinance under IC 8-1.5-3-3(a) that provides for the
control of any or all of the city's storm water facilities by the
board that controls the city's municipally owned utilities.
(3) For a county:
(A) the county executive; and
(B) the county surveyor. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.3;
P.L.98-1993, SEC.1; P.L.282-2003, SEC.4.
IC 8-1.5-5-3 "Department" defined
Sec. 3. As used in this chapter, "department" means the following:
(1) For a consolidated city, the department of public works.
(2) For all other municipalities, the department of storm water
management established under section 4 of this chapter.
(3) For a county, the department of storm water management
established under section 4.5 of this chapter. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.4;
P.L.98-1993, SEC.2; P.L.282-2003, SEC.5.
IC 8-1.5-5-3.5 "District" defined
Sec. 3.5. As used in this chapter, "district" means the special
taxing district established by section 5 of this chapter. As added by P.L.93-1993, SEC.5 and P.L.98-1993, SEC.3.
IC 8-1.5-5-4 Board of storm water management; directors
Sec. 4. (a) This section applies to all municipalities except a
consolidated city.
(b) If the legislative body of a municipality adopts the provisions
of this chapter by ordinance, a department of storm water
management is established and is controlled by a board of directors.
(c) Except as provided in subsections (f) and (g), the board
consists of three (3) directors. The executive of the municipality shall
appoint the directors, not more than two (2) of whom may be of the
same political party.
(d) Except as provided in subsections (f) and (g), the legislative
body shall prescribe, by ordinance, the terms of the directors.
However, the legislative body must prescribe the initial terms of the
directors so that they will be staggered.
(e) The executive may remove a director at any time when, in the
judgment of the executive, it is for the best interest of the
department.
(f) If a second class city has a department of public sanitation
under IC 36-9-25, the executive of the city may appoint the members
of the board of sanitary commissioners as the board of directors of
the department of storm water management. The terms of the
members of the board of directors are the same as the terms of the
members of the board of sanitary commissioners under IC 36-9-25-4.
(g) If a third class city:
(1) has a board that controls the city's municipally owned
utilities under IC 8-1.5-3-3(a); and
(2) has adopted an ordinance under IC 8-1.5-3-3(a) that
provides for the control of any or all of the city's storm water
facilities by the board that controls the city's municipally owned
utilities;
the members of the board that controls the city's municipally owned
utilities shall serve as the board of directors of the department of
storm water management, subject to any transition procedure
specified in the ordinance under IC 8-1.5-3-3(b). The terms of the
members of the board of directors are the same as the terms of the
members of the board that controls the city's municipally owned
utilities under IC 8-1.5-3-3(a), subject to the completion of any
transition procedure specified in the ordinance under IC 8-1.5-3-3(b).
(h) A member of the board of directors of the department of storm
water management who:
(1) is appointed under subsection (f); or
(2) is a member of the board under subsection (g) and receives
a salary as a member of the board that controls the third class
city's municipally owned utilities;
is not entitled to a salary for serving as a member of the board of
directors of the department of storm water management. However,
a member shall be reimbursed for necessary expenses incurred by the
member in the performance of official duties. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.6;
P.L.98-1993, SEC.4; P.L.5-1998, SEC.1; P.L.282-2003, SEC.6.
IC 8-1.5-5-4.5 County department of storm water management; board of
directors; compensation
Sec. 4.5. (a) This section applies to a county.
(b) If the county executive adopts the provisions of this chapter by
ordinance, a department of storm water management is established
and is controlled by a board of directors.
(c) An ordinance adopted under this section shall provide for the
appointment of:
(1) the members of the county executive; and
(2) the county surveyor;
as the board of directors of the department. The term of office of a
member of the board who is appointed from the membership of the
county executive is coextensive with the member's term of office on
the county executive. The term of the surveyor or the surveyor's
designee as a member of the board is coextensive with the surveyor's
term of office.
(d) A member of the board of directors is not entitled to a salary
or per diem for serving as a member of the board of directors.
However, a member shall be reimbursed for necessary expenses
incurred by the member in the performance of official duties. As added by P.L.282-2003, SEC.7.
IC 8-1.5-5-5 Special taxing district
Sec. 5. (a) The ordinance adopting the provisions of this chapter
creates a special taxing district that includes the following:
(1) For a consolidated city, all of the territory of the county
containing the consolidated city.
(2) For all other municipalities, all territory within the corporate
boundaries of the municipality.
(3) For a county, all the territory in the county that is not
located in a municipality.
(b) All the territory within the district constitutes a special taxing
district for the purpose of providing for the collection and disposal
of storm water of the district in a manner that protects the public
health and welfare and for the purpose of levying special benefit
taxes for purposes of storm water collection and disposal. All
territory in the district and all territory added to the district is
considered to have received a special benefit from the storm water
collection and disposal facilities of the district equal to or greater
than the special taxes imposed on the territory under this chapter in
order to pay all or part of the costs of such facilities. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.7;
P.L.98-1993, SEC.5; P.L.282-2003, SEC.8.
IC 8-1.5-5-6 Powers of board
Sec. 6. The board has the powers and duties prescribed by
IC 8-1.5-3-4(a). In addition, the board may:
(1) hold hearings following public notice;
(2) make findings and determinations;
(3) install, maintain, and operate a storm water collection and
disposal system;
(4) make all necessary or desirable improvements of the
grounds and premises under its control; and
(5) issue and sell bonds of the district in the name of the unit
served by the department for the acquisition, construction,
alteration, addition, or extension of the storm water collection
and disposal system or for the refunding of any bonds issued by
the board. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.9.
IC 8-1.5-5-7 Financing of facilities; user fees
Sec. 7. (a) The acquisition, construction, installation, operation,
and maintenance of facilities and land for storm water systems may
be financed through:
(1) proceeds of special taxing district bonds of the storm water
district;
(2) the assumption of liability incurred to construct the storm
water system being acquired;
(3) service rates;
(4) revenue bonds; or
(5) any other available funds.
(b) Except as provided in IC 36-9-23-37, the board, after holding
a public hearing with notice given under IC 5-3-1 and obtaining the
approval of the fiscal body of the unit served by the department, may
assess and collect user fees from all of the property of the storm
water district for the operation and maintenance of the storm water
system. The amount of the user fees must be the minimum amount
necessary for the operation and maintenance of the storm water
system. The assessment and collection of user fees under this
subsection by the board of a county must also be approved by the
county executive.
(c) The collection of the fees authorized by this section may be
effectuated through a periodic billing system or through a charge
appearing on the semiannual property tax statement of the affected
property owner.
(d) The board shall use one (1) or more of the following factors
to establish the fees authorized by this section:
(1) A flat charge for each lot, parcel of property, or building.
(2) The amount of impervious surface on the property.
(3) The number and size of storm water outlets on the property.
(4) The amount, strength, or character of storm water
discharged.
(5) The existence of improvements on the property that address
storm water quality and quantity issues.
(6) The degree to which storm water discharged from the
property affects water quality in the storm water district.
(7) Any other factors the board considers necessary.
(e) The board may exercise reasonable discretion in adopting
different schedules of fees or making classifications in schedules of
fees based on:
(1) variations in the costs, including capital expenditures, of
furnishing services to various classes of users or to various
locations;
(2) variations in the number of users in various locations; and
(3) whether the property is used primarily for residential,
commercial, or agricultural purposes. As added by P.L.125-1987, SEC.1. Amended by P.L.176-2002,
SEC.6; P.L.282-2003, SEC.10; P.L.114-2008, SEC.3.
IC 8-1.5-5-8 Fixing and setting aside revenues
Sec. 8. The board may fix and set aside:
(1) revenues of the department necessary for reasonable and
proper operation and maintenance;
(2) revenues for a proper and adequate depreciation account;
and
(3) revenues to be applied to the payment of the principal and
interest of the authorized bonds. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-9 Maintenance account; surplus
Sec. 9. (a) In fixing the revenues of the department required for
operation and maintenance, the board shall consider the cost of the
operation and maintenance of the department.
(b) If a surplus is accumulated in the operating and maintenance
account, the board may transfer any excess over that surplus to:
(1) the depreciation account, to be used for any improvements,
extensions, or additions to the storm water system; or
(2) the bond and interest redemption account. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-10 Bond and interest redemption account; surplus
Sec. 10. (a) The revenues set aside for the payment of the
principal and interest of the authorized bonds shall be deposited and
credited to a special account identified as "the bond and interest
redemption account".
(b) In determining the amount that is to be set aside for the
payment of the principal and interest of the authorized bonds, the
board may provide that the amount to be set aside and paid into the
bond and interest redemption account for any year or years should
not exceed a fixed sum, which must be at least sufficient to provide
for the payment of the interest and principal of the bonds maturing
and becoming payable in each year.
(c) If a surplus is created in the bond and interest redemption
account, the board may transfer any excess over the surplus to:
(1) the operation and maintenance account; or
(2) the depreciation account. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-11 Depreciation account; use of revenues
Sec. 11. The revenues set aside to the depreciation account shall
be expended for:
(1) the repair of the storm water system;
(2) new acquisition, construction, extensions, or additions to the
property of the storm water system; or
(3) transfer to the bond and interest redemption account to
prevent a default. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-12 Assumption and payment of liability upon acquisition of storm
water system
Sec. 12. (a) If the board acquires a storm water system and
assumes the liability incurred by the seller to construct the storm
water system, the principal and interest on the liability so assumed
shall be paid from the bond and interest redemption account in the
same manner as bonds of the district would be paid, and the board
shall set aside sufficient revenues to comply with the requirements
of the instrument creating the liability.
(b) A unit acquiring a storm water system may not assume any
liability for the payment of a secured debt or charge other than the
obligation to apply the revenues in the manner prescribed in the
ordinance.
(c) The board may issue bonds in exchange for, or satisfaction of,
the liability assumed in the acquisition of a storm water system. The
bonds so issued may not be issued at less than ninety-seven percent
(97%) of the par value thereof in exchange for, or satisfaction of, the
liability. Notwithstanding section 13(c) of this chapter, bonds issued
in exchange for, or satisfaction of, the liability need not be sold in
accordance with IC 5-1-11. However, the interest rate on such bonds
may not exceed the average yield on municipal revenue bonds of
comparable credit rating and maturity as of the end of the week
immediately preceding the issuance of the bonds. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.11.
IC 8-1.5-5-13 District bonds; nature
Sec. 13. (a) The bonds of the district are:
(1) a valid claim of the holders only against the bond and
interest redemption account and the revenues of the storm water
system; and
(2) exempt from taxation in Indiana as provided by IC 6-8-5.
(b) The bonds may be issued either as registered bonds or as
coupon bonds payable to the bearer.
(c) Except as provided in this chapter or IC 5-1-5, bonds shall be
sold in accordance with IC 5-1-11. The registration of bonds does not
affect negotiability. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-14 Bond issue
Sec. 14. A board acquiring a storm water system and paying for
it and for extensions and betterments authorized at the time of
acquisition may provide for the combined cost in one (1) issue of
bonds. The board shall issue and secure the bonds in the manner
provided in this chapter to provide funds for the original construction
of a storm water system. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-15 Use of bond proceeds; actions to compel performance; actions
upon default
Sec. 15. (a) All money received from bonds issued under this
chapter shall be applied solely to the acquisition, construction, repair,
and maintenance of the storm water system, the cost of the issuance
of the bonds, and the creation of any reserve for the bonds.
(b) Any holder of the bonds may bring a civil action to compel
performance of all duties required by this chapter of the board
issuing the bonds or of any officer of the board, including the
following:
(1) Making and collecting reasonable and sufficient user fees
lawfully established for service rendered by the storm water
system.
(2) Segregating the income and revenues of the department.
(3) Applying the respective funds created under this chapter.
(c) If there is any default in the payment of the principal or
interest of any of the bonds, a court having jurisdiction of the action
may:
(1) appoint an administrator or receiver to administer the storm
water system on behalf of the unit served by the department and
the bondholders, with power to:
(A) charge and collect user fees lawfully established
sufficient to provide for the payment of the operating
expenses and also to pay any bonds or obligations
outstanding against the storm water system; and
(B) apply the income and revenues in conformity with this
chapter and the ordinance; or
(2) declare the whole amount of the bonds due and payable and
direct the sale of the storm water system.
Under a sale ordered under subdivision (2), the purchaser is vested
with an indeterminate permit as defined in IC 8-1-2-1 to maintain and
operate the storm water system to collect and dispose of storm water
for the unit served by the department and its citizens. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.12.
IC 8-1.5-5-16 Charge for services in a municipality; deposit of funds
Sec. 16. (a) This section applies to a municipality.
(b) The reasonable cost and value of any service rendered to the
municipality by the storm water system by furnishing storm water
collection and disposal shall be:
(1) charged against the municipality; and
(2) paid for as the service accrues out of:
(A) the current revenues of the municipality, collected or in
process of collection; or
(B) the tax levy of the municipality made by it to raise
money to meet its necessary current expenses.
(c) The compensation for the service provided to the municipality
shall, in the manner prescribed by this chapter, be treated as revenues
of the system and paid into the funds created under this chapter. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.13.
IC 8-1.5-5-16.5 Charge for services in a county; deposit of funds
Sec. 16.5. (a) This section applies to a county.
(b) The reasonable cost and value of any service rendered to the
county by the storm water system by furnishing storm water
collection and disposal shall be:
(1) charged against all the territory in the county, except
territory within a municipality; and
(2) paid for as the service accrues out of:
(A) the current revenues of the county, collected or in
process of collection; or
(B) the tax levy of the county made by the county to raise
money to meet the county's necessary current expenses.
(c) The compensation for the service provided to the county shall,
in the manner prescribed by this chapter, be treated as revenues of
the system and paid into the funds created under this chapter. As added by P.L.282-2003, SEC.14. IC 8-1.5-5-17 Proposed projects; resolution; notice to property owners;
preadoption contracts for purchase
Sec. 17. (a) If, upon investigation, the board finds that:
(1) the storm water system is insufficient to furnish the
necessary collection and disposal of storm water to properly
protect the public health and welfare and safeguard the property
within the district; or
(2) it is necessary to acquire, construct, rebuild, repair, extend,
and improve the storm water system and equipment, to acquire
lands, or to construct, erect, or acquire other systems and other
structures and equipment appurtenant to them;
the board shall prepare maps, plans, specifications, and drawings
with full details and descriptions for the proposed work, together
with an estimate of the cost. The board shall also prepare a
description of all property rights necessary to be acquired in
connection with the proposed work and the manner in which the
rights are to be acquired, whether by purchase or appropriation,
along with a description of any other property that may be injuriously
affected, together with the estimated cost.
(b) The board shall then adopt a resolution approving the project
by:
(1) declaring that it is necessary for the protection of the public
health and welfare of the inhabitants of the storm water district
and the safeguarding of the property within the district;
(2) declaring that it is of public utility and benefit;
(3) appropriating the property described in the resolution;
(4) stating the maximum proposed cost of any land to be
purchased; and
(5) adopting plans, maps, specifications, drawings, details,
descriptions, and estimates.
(c) If the resolution is adopted, the board shall publish a notice in
accordance with IC 5-3-1 of the adoption of the resolution and of the
fact that plans, specifications, and estimates have been prepared and
can be inspected. The notice must also name a date, not less than ten
(10) days after the date of the last publication, when the board will
receive or hear remonstrances from the persons interested in, or
affected by, the resolution, and when it will determine the public
utility and benefit of the project. Notice shall be mailed to the owners
of all property appropriated by the resolution. If a landowner is a
nonresident and the landowner's place of residence is known, a
notice shall be mailed to the nonresident owner. If the nonresident
owner's residence is unknown to the board, then the owner is
considered notified of the pendency of the proceedings by the
publication of notice.
(d) Separate descriptions of each piece or parcel of land are not
required in the resolution and notice, but it is a sufficient description
of the property purchased or to be purchased, or to be appropriated
or damaged, to give a description of the entire tract, whether it is one
(1) or more lots or parcels and whether it is owned by one (1) or
more persons.
(e) All persons affected by the proceedings, including all
taxpayers in the storm water district, are considered to be notified of
the proceedings and all subsequent acts, hearings, adjournments, and
orders of the board by the original publication of notice.
(f) The board may, before adoption of the resolution, obtain from
the owners of the property an option for its purchase or may enter
into a contract for its purchase after an appraisal by two (2) qualified
land appraisers. An option or contract is subject to the final action of
the board confirming, modifying, or rescinding the resolution. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-18 Remonstrances
Sec. 18. (a) At the time fixed for the hearing or before the hearing,
the following persons may file a written remonstrance with the
board:
(1) The owner of real property, rights-of-way, or other property
to be appropriated under the resolution.
(2) A person injuriously affected by the appropriation.
(3) A person owning real or personal property within the storm
water district.
(b) The board shall:
(1) hear all persons interested in the proceedings;
(2) hear all the remonstrances that have been filed; and
(3) take action to confirm, modify, or reject the resolution. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-19 Appeal
Sec. 19. (a) A person who has remonstrated in writing and is
aggrieved by the decision of the board may, within thirty (30) days,
take an appeal to the circuit or superior court of the county in which
the storm water district is located.
(b) A remonstrator desiring to appeal the action of the board shall,
within thirty (30) days after the final action of the board, file in the
office of the clerk of the circuit or superior court a copy of the order
of the board and the remonstrance, together with a bond conditioned
to pay the costs of the appeal, should the appeal be determined
against the remonstrator.
(c) The court may hear the appeal only if the question is whether
the board acted arbitrarily or capriciously in adopting the resolution.
(d) The cause shall be tried by the court without a jury.
(e) All remonstrances upon which appeals are taken may be
consolidated and heard as one (1) claim for relief by the court. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-20 Property held in name of unit served by the department
Sec. 20. All real property, rights-of-way, or other property
acquired by purchase or appropriation shall be taken and held in the
name of the unit served by the department. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.15.
IC 8-1.5-5-21 Bonds for proposed work projects
Sec. 21. (a) To procure money to pay for the required property
and the acquisition, erection, and construction of the proposed work,
and in anticipation of the collection of the special benefit tax, the
board may issue, in the name of the unit served by the department,
special taxing district bonds of the storm water district. The bonds
may not exceed the total estimated cost of the work and property to
be acquired as provided for in the resolution, including:
(1) all expenses necessarily incurred for supervision and
inspection during the period of construction; and
(2) expenses actually incurred preliminary to the acquiring of
the necessary property and the construction of the work,
including the cost of records, engineering expenses, publication
of notices, salaries, and other expenses incurred, before and in
connection with the acquiring of the property, the letting of the
contract, and the sale of bonds.
(b) After adopting a resolution authorizing the bonds, the board
shall certify a copy of the resolution to the fiscal officer, who shall
then prepare the bonds. The executive shall execute the bonds, and
the fiscal officer shall attest the bonds.
(c) The board may not issue bonds of the storm water district,
payable by a special benefit property tax, when the total of the
outstanding bonds of the district that are payable from a special
benefit property tax, including the bonds already issued and to be
issued, exceeds eight percent (8%) of the total adjusted value of
taxable property in the district as determined under IC 36-1-15. For
purposes of this section, bonds are not considered to be outstanding
bonds if the payment has been provided for by an irrevocable deposit
in escrow of government obligations sufficient to pay the bonds
when due or called for redemption.
(d) The bonds are not a corporate obligation or indebtedness of
the unit but are an indebtedness of the storm water district. The
bonds and interest are payable:
(1) out of a special benefit tax levied upon all of the property of
the storm water district; or
(2) by any other means including revenues, cash on hand, and
cash in depreciation or reserve accounts.
(e) The bonds must recite the terms upon their face, together with
the purpose for which they are issued. As added by P.L.125-1987, SEC.1. Amended by P.L.6-1997,
SEC.132; P.L.282-2003, SEC.16.
IC 8-1.5-5-22 Special benefit tax
Sec. 22. (a) To raise the necessary revenues to pay for the bonds
issued and the interest on the bonds, the board:
(1) after approval by the fiscal body of the unit served by the
department, shall levy a special benefit tax upon all the property
of the storm water district in the amount necessary to meet and
pay the principal of the bonds as they severally mature, together
with all accruing interest; and
(2) shall certify the tax levied each year to the fiscal officer of
the unit served by the department at the same time and in the
same manner as other levies of the unit are certified.
The tax levied and certified shall be estimated and entered upon the
tax duplicate and shall be collected and enforced in the same manner
as state and county taxes are estimated, entered, and enforced.
(b) In fixing the amount of the necessary levy, the board:
(1) shall consider the amount of revenues derived by the board
from the operation of the storm water system under its
jurisdiction above the amount of revenues required to pay the
cost of operation and maintenance of the storm water system;
and
(2) may, in lieu of making the levy in this section, set aside by
resolution a specific amount of the surplus revenues to be
collected before maturity of the principal and interest of the
bonds payable in the following calendar year.
(c) The special tax shall be deposited in the bond and interest
redemption account. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.17.
IC 8-1.5-5-23 Approval of bond issuance by unit served by the department;
applicability of IC 6-1.1-20
Sec. 23. (a) The board may not issue any bonds authorized by this
chapter until it has secured the approval for the issuance of the bonds
from the fiscal body of the unit served by the department.
(b) IC 6-1.1-20 applies to the issuance of bonds under this chapter
which are or may be payable from the special benefit property tax. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.18.
IC 8-1.5-5-24 Combined sanitary sewer and storm water system projects
Sec. 24. (a) Whenever work on a storm water system (that is
combined with a sanitary sewer system) necessitates the repair or
replacement of all or part of a sanitary sewer system, the entity that
owns or maintains the sanitary sewer system shall assume a
proportionate share of the cost of repairing or replacing the sanitary
sewer system.
(b) The board and the entity that owns or manages the sanitary
sewer system shall negotiate the division of the costs described in
subsection (a).
(c) If the parties cannot agree to a division of the costs, they shall
petition the circuit court of the county where the majority of the
systems are located to divide the costs. The circuit court shall hold
a hearing on the division of costs within sixty (60) days after
receiving the petition. The court shall publish notice of the hearing
in accordance with IC 5-3-1. The decision of the court is binding on
both parties. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-25 Use of bond payment revenues; pledge of user fees; reductions in
fees
Sec. 25. (a) Revenues received by the department may be used to
pay for bonds issued to acquire, construct, install, operate, and
maintain facilities and land for storm water collection and disposal
systems.
(b) If there are bonds outstanding for which user fees were
pledged, the board may not rescind user fees or reduce them below
a rate that would produce one hundred twenty-five percent (125%)
of the highest annual debt service on the bonds issued under this
chapter to their final maturity, based on an average of the
immediately preceding three (3) years of user fee collections, if the
user fees have been levied for the preceding three (3) years. If the
user fees have not been levied for the preceding three (3) years, the
board may not reduce user fees below a rate that would produce one
hundred twenty-five percent (125%) of the highest debt service,
based upon a study by a qualified public accountant or financial
adviser. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-26 User fee pledges; effect of amendments or repeal of chapter
Sec. 26. With respect to bonds for which a pledge has been made
under section 25 of this chapter, the general assembly covenants with
the holders of these bonds that:
(1) this chapter will not be repealed or amended in a manner
that will adversely affect the imposition or collection of the user
fees under this chapter; and
(2) this chapter will not be amended in a manner that will
change the purpose for which revenues from the user fees
imposed under this chapter may be used;
as long as those bonds are outstanding. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-27 Maintenance of private property by the department
Sec. 27. If the department:
(1) uses private property for storm water collection or disposal;
and
(2) obtains the consent of the owner of the private property to
maintain the private property;
the department shall maintain the private property. As added by P.L.282-2003, SEC.19.
IC 8-1.5-5-28 Screening of storm water outfalls
Sec. 28. A person may not be required to screen a storm water
outfall if the pipe diameter of the storm water outfall is less than
twenty-four (24) inches. As added by P.L.282-2003, SEC.20.
IC 8-1.5-5-29 Liens for unpaid fees
Sec. 29. (a) Subsections (c), (d), and (e) do not apply to a city that
before January 1, 2005, adopted an ordinance establishing
procedures for the collection of unpaid user fees under this chapter
through the enforcement of a lien.
(b) Fees assessed against real property under this chapter
constitute a lien against the property assessed. The lien is superior to
all other liens except tax liens. Except as provided in subsections (c)
and (d), the lien attaches when notice of the lien is filed in the county
recorder's office under section 30 of this chapter.
(c) A fee is not enforceable as a lien against a subsequent owner
of property unless the lien for the fee was recorded with the county
recorder before the conveyance to the subsequent owner. If property
is conveyed before a lien is filed, the department shall notify the
person who owned the property at the time the fee became payable.
The notice must inform the person that payment, including penalty
fees for delinquencies, is due not more than fifteen (15) days after
the date of the notice. If payment is not received within one hundred
eighty (180) days after the date of the notice, the amount due may be
expensed as a bad debt loss.
(d) A lien attaches against real property occupied by someone
other than the owner only if the department notifies the owner within
twenty (20) days after the time the user fees became sixty (60) days
delinquent. However, the department must give notice to the owner
only if the owner has given the department written notice of the
address to which to send notice.
(e) The department shall release:
(1) liens filed with the county recorder after the recorded date
of conveyance of the property; and
(2) delinquent fees incurred by the seller;
upon receipt of a verified demand in writing from the purchaser. The
demand must state that the delinquent fees were not incurred by the
purchaser as a user, lessee, or previous owner and that the purchaser
has not been paid by the seller for the delinquent fees. As added by P.L.131-2005, SEC.1.
IC 8-1.5-5-30 Recording and collection of liens; filing fees
Sec. 30. (a) The board may defer enforcing the collection of
unpaid fees and penalties assessed under this chapter until the unpaid
fees and penalties have been due and unpaid for at least ninety (90)
days.
(b) Except as provided in subsection (k), the board shall enforce
payment of fees imposed under this chapter. As often as the board
determines necessary in a calendar year, the board shall prepare
either of the following:
(1) A list of the delinquent fees and penalties that are
enforceable under this section. The list must include the
following:
(A) The name of the owner of each lot or parcel of real
property on which fees are delinquent.
(B) A description of the premises, as shown by the records
of the county auditor.
(C) The amount of the delinquent fees, together with the
penalty.
(2) An individual instrument for each lot or parcel of real
property on which the fees are delinquent.
(c) An officer of the board shall record a copy of each list or each
individual instrument with the county recorder who shall charge a fee
for recording the list or each individual instrument in accordance
with the fee schedule established in IC 36-2-7-10. The officer shall
mail by certified mail, or by another delivery service providing proof
of delivery, to each property owner on the list or on an individual
instrument a notice stating that a lien against the owner's property
has been recorded. A service charge of five dollars ($5), which is in
addition to the recording fee charged under this subsection and under
subsection (e), shall be added to each delinquent fee that is recorded.
(d) Using the lists and instruments prepared under subsection (b)
and recorded under subsection (c), the board shall, not later than ten
(10) days after the list or each individual instrument is recorded
under subsection (c), certify to the county auditor a list of the liens
that remain unpaid for collection in the next May. The county and its
officers and employees are not liable for any material error in the
information on this list.
(e) The board shall release any recorded lien when the delinquent
fees, penalties, service charges, and recording fees have been fully
paid. The county recorder shall charge a fee for releasing the lien in
accordance with IC 36-2-7-10.
(f) Upon receipt of the list under subsection (c), the county auditor
of each county shall add a fifteen dollar ($15) certification fee for
each lot or parcel of real property on which fees are delinquent. The
fee is in addition to all other fees and charges. The county auditor
shall immediately enter on the tax duplicate for the district the
delinquent fees, penalties, service charges, recording fees, and
certification fees, which are due not later than the due date of the
next May installment of property taxes. The county treasurer shall
include any unpaid charges for the delinquent fee, penalty, service
charge, recording fee, and certification fee to the owner or owners of
each lot or parcel of property, at the time the next cycle's property tax
installment is billed.
(g) After certification of liens under subsection (d), the board may
not collect or accept delinquent fees, penalties, service charges,
recording fees, or certification fees from property owners whose
property has been certified to the county auditor.
(h) If a delinquent fee, penalty, service charge, recording fee, and
certification fee are not paid, they shall be collected by the county
treasurer in the same way that delinquent property taxes are
collected.
(i) At the time of each semiannual tax settlement, the county
treasurer shall certify to the county auditor all fees, charges, and
penalties that have been collected. The county auditor shall deduct
the service charges and certification fees collected by the county
treasurer and pay over to the officer the remaining fees and penalties
due the district. The county treasurer shall retain the service charges
and certification fees that have been collected and shall deposit them
in the county general fund.
(j) Fees, penalties, and service charges that were not recorded
before a recorded conveyance shall be removed from the tax roll for
a purchaser who, in the manner prescribed by section 29(e) of this
chapter, files a verified demand with the county auditor.
(k) A board may write off a fee or penalty under subsection (a)
that is less than forty dollars ($40). As added by P.L.131-2005, SEC.2.
IC 8-1.5-5-31 Foreclosure of liens
Sec. 31. (a) A district may foreclose a lien established by this
chapter in order to collect fees and penalties. The district shall
recover the amount of the fees and penalties, and a reasonable
attorney's fee. The court shall order the sale to be made without relief
from valuation or appraisement laws.
(b) Except as otherwise provided by this chapter, actions under
this chapter are subject to the general statutes regarding municipal
public improvement assessments. As added by P.L.131-2005, SEC.3.
IC 8-1.5-5-32 Withdrawal from district by excluded municipality; notice;
outstanding bonds; payments to municipality
Sec. 32. (a) This section applies to excluded cities and towns in
a county containing a consolidated city.
(b) A municipality to which this section applies may withdraw
from the district established by the consolidated city if the municipal
legislative body adopts an ordinance withdrawing the municipality
from the district. The municipal legislative body shall, at least thirty
(30) days before the final vote on the ordinance, mail written notice
of the meeting to the following:
(1) All owners of lots and parcels within the municipality that
are subject to storm water user fees imposed in the district by
the department of public works of the consolidated city.
(2) The department of public works of the consolidated city.
(c) An ordinance described in subsection (b) takes effect sixty
(60) days after adoption by the municipal legislative body.
(d) In addition to the notice required by subsection (b), if a
municipal legislative body adopts an ordinance under subsection (b),
the municipal legislative body shall mail written notice of the
withdrawal from the district to the department of public works of the
consolidated city not more than thirty (30) days after the ordinance
becomes effective.
(e) If on the date of a municipality's withdrawal from the district
there are bonds outstanding that have been issued by the board of
public works of the consolidated city, the municipality is liable for
and shall pay that indebtedness in the same ratio as the assessed
valuation of the property in the municipality bears to the assessed
valuation of all property included in the district on the date one (1)
day before the date of withdrawal, as shown in the most recent
assessment for taxation before the date of withdrawal.
(f) If a municipal legislative body adopts an ordinance under
subsection (b), the municipality is entitled to receive the following:
(1) An annual lump sum payment equal to the total amount of
property taxes paid and allocated to the district's flood debt
service fund from all property taxpayers within the
municipality, to the extent the property taxes are not necessary
to pay the indebtedness owed by the municipality under
subsection (e). A payment under this subdivision is required for
property taxes assessed beginning on the January 1 preceding
the effective date of the municipality's withdrawal from the
district.
(2) The total amount of storm water user fees collected by the
department of public works of the consolidated city from the
lots and parcels in the municipality beginning on the January 1
preceding the effective date of the municipality's withdrawal
from the district.
(g) Payments received under subsection (f):
(1) shall be deposited by the municipality in a dedicated fund;
and
(2) may be used by the municipality only for purposes of storm
water management in the municipality and may not be diverted,
directly or indirectly, in any manner to any use other than the
purposes of storm water management in the municipality. As added by P.L.52-2006, SEC.1 and P.L.175-2006, SEC.1. Amended
by P.L.154-2006, SEC.65.
IC 8-1.5-5
Chapter 5. Department of Storm Water Management
IC 8-1.5-5-1 Application of chapter
Sec. 1. This chapter applies to each:
(1) municipality; and
(2) county that:
(A) does not have a consolidated city; and
(B) receives notification from the department of
environmental management that the county will be subject
to storm water regulation under 327 IAC 15-13;
that adopts the provisions of this chapter by ordinance. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.2.
IC 8-1.5-5-1.5 Definitions
Sec. 1.5. The definitions in IC 36-1-2 apply throughout this
chapter. As added by P.L.282-2003, SEC.3.
IC 8-1.5-5-2 "Board" defined
Sec. 2. As used in this chapter, "board" means the following:
(1) For a consolidated city, the board of public works
established by IC 36-3-5-6.
(2) For all other municipalities, the:
(A) board of directors described in section 4 of this chapter;
or
(B) board that controls the third class city's municipally
owned utilities under IC 8-1.5-3-3(a) if the city has adopted
an ordinance under IC 8-1.5-3-3(a) that provides for the
control of any or all of the city's storm water facilities by the
board that controls the city's municipally owned utilities.
(3) For a county:
(A) the county executive; and
(B) the county surveyor. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.3;
P.L.98-1993, SEC.1; P.L.282-2003, SEC.4.
IC 8-1.5-5-3 "Department" defined
Sec. 3. As used in this chapter, "department" means the following:
(1) For a consolidated city, the department of public works.
(2) For all other municipalities, the department of storm water
management established under section 4 of this chapter.
(3) For a county, the department of storm water management
established under section 4.5 of this chapter. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.4;
P.L.98-1993, SEC.2; P.L.282-2003, SEC.5.
IC 8-1.5-5-3.5 "District" defined
Sec. 3.5. As used in this chapter, "district" means the special
taxing district established by section 5 of this chapter. As added by P.L.93-1993, SEC.5 and P.L.98-1993, SEC.3.
IC 8-1.5-5-4 Board of storm water management; directors
Sec. 4. (a) This section applies to all municipalities except a
consolidated city.
(b) If the legislative body of a municipality adopts the provisions
of this chapter by ordinance, a department of storm water
management is established and is controlled by a board of directors.
(c) Except as provided in subsections (f) and (g), the board
consists of three (3) directors. The executive of the municipality shall
appoint the directors, not more than two (2) of whom may be of the
same political party.
(d) Except as provided in subsections (f) and (g), the legislative
body shall prescribe, by ordinance, the terms of the directors.
However, the legislative body must prescribe the initial terms of the
directors so that they will be staggered.
(e) The executive may remove a director at any time when, in the
judgment of the executive, it is for the best interest of the
department.
(f) If a second class city has a department of public sanitation
under IC 36-9-25, the executive of the city may appoint the members
of the board of sanitary commissioners as the board of directors of
the department of storm water management. The terms of the
members of the board of directors are the same as the terms of the
members of the board of sanitary commissioners under IC 36-9-25-4.
(g) If a third class city:
(1) has a board that controls the city's municipally owned
utilities under IC 8-1.5-3-3(a); and
(2) has adopted an ordinance under IC 8-1.5-3-3(a) that
provides for the control of any or all of the city's storm water
facilities by the board that controls the city's municipally owned
utilities;
the members of the board that controls the city's municipally owned
utilities shall serve as the board of directors of the department of
storm water management, subject to any transition procedure
specified in the ordinance under IC 8-1.5-3-3(b). The terms of the
members of the board of directors are the same as the terms of the
members of the board that controls the city's municipally owned
utilities under IC 8-1.5-3-3(a), subject to the completion of any
transition procedure specified in the ordinance under IC 8-1.5-3-3(b).
(h) A member of the board of directors of the department of storm
water management who:
(1) is appointed under subsection (f); or
(2) is a member of the board under subsection (g) and receives
a salary as a member of the board that controls the third class
city's municipally owned utilities;
is not entitled to a salary for serving as a member of the board of
directors of the department of storm water management. However,
a member shall be reimbursed for necessary expenses incurred by the
member in the performance of official duties. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.6;
P.L.98-1993, SEC.4; P.L.5-1998, SEC.1; P.L.282-2003, SEC.6.
IC 8-1.5-5-4.5 County department of storm water management; board of
directors; compensation
Sec. 4.5. (a) This section applies to a county.
(b) If the county executive adopts the provisions of this chapter by
ordinance, a department of storm water management is established
and is controlled by a board of directors.
(c) An ordinance adopted under this section shall provide for the
appointment of:
(1) the members of the county executive; and
(2) the county surveyor;
as the board of directors of the department. The term of office of a
member of the board who is appointed from the membership of the
county executive is coextensive with the member's term of office on
the county executive. The term of the surveyor or the surveyor's
designee as a member of the board is coextensive with the surveyor's
term of office.
(d) A member of the board of directors is not entitled to a salary
or per diem for serving as a member of the board of directors.
However, a member shall be reimbursed for necessary expenses
incurred by the member in the performance of official duties. As added by P.L.282-2003, SEC.7.
IC 8-1.5-5-5 Special taxing district
Sec. 5. (a) The ordinance adopting the provisions of this chapter
creates a special taxing district that includes the following:
(1) For a consolidated city, all of the territory of the county
containing the consolidated city.
(2) For all other municipalities, all territory within the corporate
boundaries of the municipality.
(3) For a county, all the territory in the county that is not
located in a municipality.
(b) All the territory within the district constitutes a special taxing
district for the purpose of providing for the collection and disposal
of storm water of the district in a manner that protects the public
health and welfare and for the purpose of levying special benefit
taxes for purposes of storm water collection and disposal. All
territory in the district and all territory added to the district is
considered to have received a special benefit from the storm water
collection and disposal facilities of the district equal to or greater
than the special taxes imposed on the territory under this chapter in
order to pay all or part of the costs of such facilities. As added by P.L.125-1987, SEC.1. Amended by P.L.93-1993, SEC.7;
P.L.98-1993, SEC.5; P.L.282-2003, SEC.8.
IC 8-1.5-5-6 Powers of board
Sec. 6. The board has the powers and duties prescribed by
IC 8-1.5-3-4(a). In addition, the board may:
(1) hold hearings following public notice;
(2) make findings and determinations;
(3) install, maintain, and operate a storm water collection and
disposal system;
(4) make all necessary or desirable improvements of the
grounds and premises under its control; and
(5) issue and sell bonds of the district in the name of the unit
served by the department for the acquisition, construction,
alteration, addition, or extension of the storm water collection
and disposal system or for the refunding of any bonds issued by
the board. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.9.
IC 8-1.5-5-7 Financing of facilities; user fees
Sec. 7. (a) The acquisition, construction, installation, operation,
and maintenance of facilities and land for storm water systems may
be financed through:
(1) proceeds of special taxing district bonds of the storm water
district;
(2) the assumption of liability incurred to construct the storm
water system being acquired;
(3) service rates;
(4) revenue bonds; or
(5) any other available funds.
(b) Except as provided in IC 36-9-23-37, the board, after holding
a public hearing with notice given under IC 5-3-1 and obtaining the
approval of the fiscal body of the unit served by the department, may
assess and collect user fees from all of the property of the storm
water district for the operation and maintenance of the storm water
system. The amount of the user fees must be the minimum amount
necessary for the operation and maintenance of the storm water
system. The assessment and collection of user fees under this
subsection by the board of a county must also be approved by the
county executive.
(c) The collection of the fees authorized by this section may be
effectuated through a periodic billing system or through a charge
appearing on the semiannual property tax statement of the affected
property owner.
(d) The board shall use one (1) or more of the following factors
to establish the fees authorized by this section:
(1) A flat charge for each lot, parcel of property, or building.
(2) The amount of impervious surface on the property.
(3) The number and size of storm water outlets on the property.
(4) The amount, strength, or character of storm water
discharged.
(5) The existence of improvements on the property that address
storm water quality and quantity issues.
(6) The degree to which storm water discharged from the
property affects water quality in the storm water district.
(7) Any other factors the board considers necessary.
(e) The board may exercise reasonable discretion in adopting
different schedules of fees or making classifications in schedules of
fees based on:
(1) variations in the costs, including capital expenditures, of
furnishing services to various classes of users or to various
locations;
(2) variations in the number of users in various locations; and
(3) whether the property is used primarily for residential,
commercial, or agricultural purposes. As added by P.L.125-1987, SEC.1. Amended by P.L.176-2002,
SEC.6; P.L.282-2003, SEC.10; P.L.114-2008, SEC.3.
IC 8-1.5-5-8 Fixing and setting aside revenues
Sec. 8. The board may fix and set aside:
(1) revenues of the department necessary for reasonable and
proper operation and maintenance;
(2) revenues for a proper and adequate depreciation account;
and
(3) revenues to be applied to the payment of the principal and
interest of the authorized bonds. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-9 Maintenance account; surplus
Sec. 9. (a) In fixing the revenues of the department required for
operation and maintenance, the board shall consider the cost of the
operation and maintenance of the department.
(b) If a surplus is accumulated in the operating and maintenance
account, the board may transfer any excess over that surplus to:
(1) the depreciation account, to be used for any improvements,
extensions, or additions to the storm water system; or
(2) the bond and interest redemption account. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-10 Bond and interest redemption account; surplus
Sec. 10. (a) The revenues set aside for the payment of the
principal and interest of the authorized bonds shall be deposited and
credited to a special account identified as "the bond and interest
redemption account".
(b) In determining the amount that is to be set aside for the
payment of the principal and interest of the authorized bonds, the
board may provide that the amount to be set aside and paid into the
bond and interest redemption account for any year or years should
not exceed a fixed sum, which must be at least sufficient to provide
for the payment of the interest and principal of the bonds maturing
and becoming payable in each year.
(c) If a surplus is created in the bond and interest redemption
account, the board may transfer any excess over the surplus to:
(1) the operation and maintenance account; or
(2) the depreciation account. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-11 Depreciation account; use of revenues
Sec. 11. The revenues set aside to the depreciation account shall
be expended for:
(1) the repair of the storm water system;
(2) new acquisition, construction, extensions, or additions to the
property of the storm water system; or
(3) transfer to the bond and interest redemption account to
prevent a default. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-12 Assumption and payment of liability upon acquisition of storm
water system
Sec. 12. (a) If the board acquires a storm water system and
assumes the liability incurred by the seller to construct the storm
water system, the principal and interest on the liability so assumed
shall be paid from the bond and interest redemption account in the
same manner as bonds of the district would be paid, and the board
shall set aside sufficient revenues to comply with the requirements
of the instrument creating the liability.
(b) A unit acquiring a storm water system may not assume any
liability for the payment of a secured debt or charge other than the
obligation to apply the revenues in the manner prescribed in the
ordinance.
(c) The board may issue bonds in exchange for, or satisfaction of,
the liability assumed in the acquisition of a storm water system. The
bonds so issued may not be issued at less than ninety-seven percent
(97%) of the par value thereof in exchange for, or satisfaction of, the
liability. Notwithstanding section 13(c) of this chapter, bonds issued
in exchange for, or satisfaction of, the liability need not be sold in
accordance with IC 5-1-11. However, the interest rate on such bonds
may not exceed the average yield on municipal revenue bonds of
comparable credit rating and maturity as of the end of the week
immediately preceding the issuance of the bonds. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.11.
IC 8-1.5-5-13 District bonds; nature
Sec. 13. (a) The bonds of the district are:
(1) a valid claim of the holders only against the bond and
interest redemption account and the revenues of the storm water
system; and
(2) exempt from taxation in Indiana as provided by IC 6-8-5.
(b) The bonds may be issued either as registered bonds or as
coupon bonds payable to the bearer.
(c) Except as provided in this chapter or IC 5-1-5, bonds shall be
sold in accordance with IC 5-1-11. The registration of bonds does not
affect negotiability. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-14 Bond issue
Sec. 14. A board acquiring a storm water system and paying for
it and for extensions and betterments authorized at the time of
acquisition may provide for the combined cost in one (1) issue of
bonds. The board shall issue and secure the bonds in the manner
provided in this chapter to provide funds for the original construction
of a storm water system. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-15 Use of bond proceeds; actions to compel performance; actions
upon default
Sec. 15. (a) All money received from bonds issued under this
chapter shall be applied solely to the acquisition, construction, repair,
and maintenance of the storm water system, the cost of the issuance
of the bonds, and the creation of any reserve for the bonds.
(b) Any holder of the bonds may bring a civil action to compel
performance of all duties required by this chapter of the board
issuing the bonds or of any officer of the board, including the
following:
(1) Making and collecting reasonable and sufficient user fees
lawfully established for service rendered by the storm water
system.
(2) Segregating the income and revenues of the department.
(3) Applying the respective funds created under this chapter.
(c) If there is any default in the payment of the principal or
interest of any of the bonds, a court having jurisdiction of the action
may:
(1) appoint an administrator or receiver to administer the storm
water system on behalf of the unit served by the department and
the bondholders, with power to:
(A) charge and collect user fees lawfully established
sufficient to provide for the payment of the operating
expenses and also to pay any bonds or obligations
outstanding against the storm water system; and
(B) apply the income and revenues in conformity with this
chapter and the ordinance; or
(2) declare the whole amount of the bonds due and payable and
direct the sale of the storm water system.
Under a sale ordered under subdivision (2), the purchaser is vested
with an indeterminate permit as defined in IC 8-1-2-1 to maintain and
operate the storm water system to collect and dispose of storm water
for the unit served by the department and its citizens. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.12.
IC 8-1.5-5-16 Charge for services in a municipality; deposit of funds
Sec. 16. (a) This section applies to a municipality.
(b) The reasonable cost and value of any service rendered to the
municipality by the storm water system by furnishing storm water
collection and disposal shall be:
(1) charged against the municipality; and
(2) paid for as the service accrues out of:
(A) the current revenues of the municipality, collected or in
process of collection; or
(B) the tax levy of the municipality made by it to raise
money to meet its necessary current expenses.
(c) The compensation for the service provided to the municipality
shall, in the manner prescribed by this chapter, be treated as revenues
of the system and paid into the funds created under this chapter. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.13.
IC 8-1.5-5-16.5 Charge for services in a county; deposit of funds
Sec. 16.5. (a) This section applies to a county.
(b) The reasonable cost and value of any service rendered to the
county by the storm water system by furnishing storm water
collection and disposal shall be:
(1) charged against all the territory in the county, except
territory within a municipality; and
(2) paid for as the service accrues out of:
(A) the current revenues of the county, collected or in
process of collection; or
(B) the tax levy of the county made by the county to raise
money to meet the county's necessary current expenses.
(c) The compensation for the service provided to the county shall,
in the manner prescribed by this chapter, be treated as revenues of
the system and paid into the funds created under this chapter. As added by P.L.282-2003, SEC.14. IC 8-1.5-5-17 Proposed projects; resolution; notice to property owners;
preadoption contracts for purchase
Sec. 17. (a) If, upon investigation, the board finds that:
(1) the storm water system is insufficient to furnish the
necessary collection and disposal of storm water to properly
protect the public health and welfare and safeguard the property
within the district; or
(2) it is necessary to acquire, construct, rebuild, repair, extend,
and improve the storm water system and equipment, to acquire
lands, or to construct, erect, or acquire other systems and other
structures and equipment appurtenant to them;
the board shall prepare maps, plans, specifications, and drawings
with full details and descriptions for the proposed work, together
with an estimate of the cost. The board shall also prepare a
description of all property rights necessary to be acquired in
connection with the proposed work and the manner in which the
rights are to be acquired, whether by purchase or appropriation,
along with a description of any other property that may be injuriously
affected, together with the estimated cost.
(b) The board shall then adopt a resolution approving the project
by:
(1) declaring that it is necessary for the protection of the public
health and welfare of the inhabitants of the storm water district
and the safeguarding of the property within the district;
(2) declaring that it is of public utility and benefit;
(3) appropriating the property described in the resolution;
(4) stating the maximum proposed cost of any land to be
purchased; and
(5) adopting plans, maps, specifications, drawings, details,
descriptions, and estimates.
(c) If the resolution is adopted, the board shall publish a notice in
accordance with IC 5-3-1 of the adoption of the resolution and of the
fact that plans, specifications, and estimates have been prepared and
can be inspected. The notice must also name a date, not less than ten
(10) days after the date of the last publication, when the board will
receive or hear remonstrances from the persons interested in, or
affected by, the resolution, and when it will determine the public
utility and benefit of the project. Notice shall be mailed to the owners
of all property appropriated by the resolution. If a landowner is a
nonresident and the landowner's place of residence is known, a
notice shall be mailed to the nonresident owner. If the nonresident
owner's residence is unknown to the board, then the owner is
considered notified of the pendency of the proceedings by the
publication of notice.
(d) Separate descriptions of each piece or parcel of land are not
required in the resolution and notice, but it is a sufficient description
of the property purchased or to be purchased, or to be appropriated
or damaged, to give a description of the entire tract, whether it is one
(1) or more lots or parcels and whether it is owned by one (1) or
more persons.
(e) All persons affected by the proceedings, including all
taxpayers in the storm water district, are considered to be notified of
the proceedings and all subsequent acts, hearings, adjournments, and
orders of the board by the original publication of notice.
(f) The board may, before adoption of the resolution, obtain from
the owners of the property an option for its purchase or may enter
into a contract for its purchase after an appraisal by two (2) qualified
land appraisers. An option or contract is subject to the final action of
the board confirming, modifying, or rescinding the resolution. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-18 Remonstrances
Sec. 18. (a) At the time fixed for the hearing or before the hearing,
the following persons may file a written remonstrance with the
board:
(1) The owner of real property, rights-of-way, or other property
to be appropriated under the resolution.
(2) A person injuriously affected by the appropriation.
(3) A person owning real or personal property within the storm
water district.
(b) The board shall:
(1) hear all persons interested in the proceedings;
(2) hear all the remonstrances that have been filed; and
(3) take action to confirm, modify, or reject the resolution. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-19 Appeal
Sec. 19. (a) A person who has remonstrated in writing and is
aggrieved by the decision of the board may, within thirty (30) days,
take an appeal to the circuit or superior court of the county in which
the storm water district is located.
(b) A remonstrator desiring to appeal the action of the board shall,
within thirty (30) days after the final action of the board, file in the
office of the clerk of the circuit or superior court a copy of the order
of the board and the remonstrance, together with a bond conditioned
to pay the costs of the appeal, should the appeal be determined
against the remonstrator.
(c) The court may hear the appeal only if the question is whether
the board acted arbitrarily or capriciously in adopting the resolution.
(d) The cause shall be tried by the court without a jury.
(e) All remonstrances upon which appeals are taken may be
consolidated and heard as one (1) claim for relief by the court. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-20 Property held in name of unit served by the department
Sec. 20. All real property, rights-of-way, or other property
acquired by purchase or appropriation shall be taken and held in the
name of the unit served by the department. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.15.
IC 8-1.5-5-21 Bonds for proposed work projects
Sec. 21. (a) To procure money to pay for the required property
and the acquisition, erection, and construction of the proposed work,
and in anticipation of the collection of the special benefit tax, the
board may issue, in the name of the unit served by the department,
special taxing district bonds of the storm water district. The bonds
may not exceed the total estimated cost of the work and property to
be acquired as provided for in the resolution, including:
(1) all expenses necessarily incurred for supervision and
inspection during the period of construction; and
(2) expenses actually incurred preliminary to the acquiring of
the necessary property and the construction of the work,
including the cost of records, engineering expenses, publication
of notices, salaries, and other expenses incurred, before and in
connection with the acquiring of the property, the letting of the
contract, and the sale of bonds.
(b) After adopting a resolution authorizing the bonds, the board
shall certify a copy of the resolution to the fiscal officer, who shall
then prepare the bonds. The executive shall execute the bonds, and
the fiscal officer shall attest the bonds.
(c) The board may not issue bonds of the storm water district,
payable by a special benefit property tax, when the total of the
outstanding bonds of the district that are payable from a special
benefit property tax, including the bonds already issued and to be
issued, exceeds eight percent (8%) of the total adjusted value of
taxable property in the district as determined under IC 36-1-15. For
purposes of this section, bonds are not considered to be outstanding
bonds if the payment has been provided for by an irrevocable deposit
in escrow of government obligations sufficient to pay the bonds
when due or called for redemption.
(d) The bonds are not a corporate obligation or indebtedness of
the unit but are an indebtedness of the storm water district. The
bonds and interest are payable:
(1) out of a special benefit tax levied upon all of the property of
the storm water district; or
(2) by any other means including revenues, cash on hand, and
cash in depreciation or reserve accounts.
(e) The bonds must recite the terms upon their face, together with
the purpose for which they are issued. As added by P.L.125-1987, SEC.1. Amended by P.L.6-1997,
SEC.132; P.L.282-2003, SEC.16.
IC 8-1.5-5-22 Special benefit tax
Sec. 22. (a) To raise the necessary revenues to pay for the bonds
issued and the interest on the bonds, the board:
(1) after approval by the fiscal body of the unit served by the
department, shall levy a special benefit tax upon all the property
of the storm water district in the amount necessary to meet and
pay the principal of the bonds as they severally mature, together
with all accruing interest; and
(2) shall certify the tax levied each year to the fiscal officer of
the unit served by the department at the same time and in the
same manner as other levies of the unit are certified.
The tax levied and certified shall be estimated and entered upon the
tax duplicate and shall be collected and enforced in the same manner
as state and county taxes are estimated, entered, and enforced.
(b) In fixing the amount of the necessary levy, the board:
(1) shall consider the amount of revenues derived by the board
from the operation of the storm water system under its
jurisdiction above the amount of revenues required to pay the
cost of operation and maintenance of the storm water system;
and
(2) may, in lieu of making the levy in this section, set aside by
resolution a specific amount of the surplus revenues to be
collected before maturity of the principal and interest of the
bonds payable in the following calendar year.
(c) The special tax shall be deposited in the bond and interest
redemption account. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.17.
IC 8-1.5-5-23 Approval of bond issuance by unit served by the department;
applicability of IC 6-1.1-20
Sec. 23. (a) The board may not issue any bonds authorized by this
chapter until it has secured the approval for the issuance of the bonds
from the fiscal body of the unit served by the department.
(b) IC 6-1.1-20 applies to the issuance of bonds under this chapter
which are or may be payable from the special benefit property tax. As added by P.L.125-1987, SEC.1. Amended by P.L.282-2003,
SEC.18.
IC 8-1.5-5-24 Combined sanitary sewer and storm water system projects
Sec. 24. (a) Whenever work on a storm water system (that is
combined with a sanitary sewer system) necessitates the repair or
replacement of all or part of a sanitary sewer system, the entity that
owns or maintains the sanitary sewer system shall assume a
proportionate share of the cost of repairing or replacing the sanitary
sewer system.
(b) The board and the entity that owns or manages the sanitary
sewer system shall negotiate the division of the costs described in
subsection (a).
(c) If the parties cannot agree to a division of the costs, they shall
petition the circuit court of the county where the majority of the
systems are located to divide the costs. The circuit court shall hold
a hearing on the division of costs within sixty (60) days after
receiving the petition. The court shall publish notice of the hearing
in accordance with IC 5-3-1. The decision of the court is binding on
both parties. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-25 Use of bond payment revenues; pledge of user fees; reductions in
fees
Sec. 25. (a) Revenues received by the department may be used to
pay for bonds issued to acquire, construct, install, operate, and
maintain facilities and land for storm water collection and disposal
systems.
(b) If there are bonds outstanding for which user fees were
pledged, the board may not rescind user fees or reduce them below
a rate that would produce one hundred twenty-five percent (125%)
of the highest annual debt service on the bonds issued under this
chapter to their final maturity, based on an average of the
immediately preceding three (3) years of user fee collections, if the
user fees have been levied for the preceding three (3) years. If the
user fees have not been levied for the preceding three (3) years, the
board may not reduce user fees below a rate that would produce one
hundred twenty-five percent (125%) of the highest debt service,
based upon a study by a qualified public accountant or financial
adviser. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-26 User fee pledges; effect of amendments or repeal of chapter
Sec. 26. With respect to bonds for which a pledge has been made
under section 25 of this chapter, the general assembly covenants with
the holders of these bonds that:
(1) this chapter will not be repealed or amended in a manner
that will adversely affect the imposition or collection of the user
fees under this chapter; and
(2) this chapter will not be amended in a manner that will
change the purpose for which revenues from the user fees
imposed under this chapter may be used;
as long as those bonds are outstanding. As added by P.L.125-1987, SEC.1.
IC 8-1.5-5-27 Maintenance of private property by the department
Sec. 27. If the department:
(1) uses private property for storm water collection or disposal;
and
(2) obtains the consent of the owner of the private property to
maintain the private property;
the department shall maintain the private property. As added by P.L.282-2003, SEC.19.
IC 8-1.5-5-28 Screening of storm water outfalls
Sec. 28. A person may not be required to screen a storm water
outfall if the pipe diameter of the storm water outfall is less than
twenty-four (24) inches. As added by P.L.282-2003, SEC.20.
IC 8-1.5-5-29 Liens for unpaid fees
Sec. 29. (a) Subsections (c), (d), and (e) do not apply to a city that
before January 1, 2005, adopted an ordinance establishing
procedures for the collection of unpaid user fees under this chapter
through the enforcement of a lien.
(b) Fees assessed against real property under this chapter
constitute a lien against the property assessed. The lien is superior to
all other liens except tax liens. Except as provided in subsections (c)
and (d), the lien attaches when notice of the lien is filed in the county
recorder's office under section 30 of this chapter.
(c) A fee is not enforceable as a lien against a subsequent owner
of property unless the lien for the fee was recorded with the county
recorder before the conveyance to the subsequent owner. If property
is conveyed before a lien is filed, the department shall notify the
person who owned the property at the time the fee became payable.
The notice must inform the person that payment, including penalty
fees for delinquencies, is due not more than fifteen (15) days after
the date of the notice. If payment is not received within one hundred
eighty (180) days after the date of the notice, the amount due may be
expensed as a bad debt loss.
(d) A lien attaches against real property occupied by someone
other than the owner only if the department notifies the owner within
twenty (20) days after the time the user fees became sixty (60) days
delinquent. However, the department must give notice to the owner
only if the owner has given the department written notice of the
address to which to send notice.
(e) The department shall release:
(1) liens filed with the county recorder after the recorded date
of conveyance of the property; and
(2) delinquent fees incurred by the seller;
upon receipt of a verified demand in writing from the purchaser. The
demand must state that the delinquent fees were not incurred by the
purchaser as a user, lessee, or previous owner and that the purchaser
has not been paid by the seller for the delinquent fees. As added by P.L.131-2005, SEC.1.
IC 8-1.5-5-30 Recording and collection of liens; filing fees
Sec. 30. (a) The board may defer enforcing the collection of
unpaid fees and penalties assessed under this chapter until the unpaid
fees and penalties have been due and unpaid for at least ninety (90)
days.
(b) Except as provided in subsection (k), the board shall enforce
payment of fees imposed under this chapter. As often as the board
determines necessary in a calendar year, the board shall prepare
either of the following:
(1) A list of the delinquent fees and penalties that are
enforceable under this section. The list must include the
following:
(A) The name of the owner of each lot or parcel of real
property on which fees are delinquent.
(B) A description of the premises, as shown by the records
of the county auditor.
(C) The amount of the delinquent fees, together with the
penalty.
(2) An individual instrument for each lot or parcel of real
property on which the fees are delinquent.
(c) An officer of the board shall record a copy of each list or each
individual instrument with the county recorder who shall charge a fee
for recording the list or each individual instrument in accordance
with the fee schedule established in IC 36-2-7-10. The officer shall
mail by certified mail, or by another delivery service providing proof
of delivery, to each property owner on the list or on an individual
instrument a notice stating that a lien against the owner's property
has been recorded. A service charge of five dollars ($5), which is in
addition to the recording fee charged under this subsection and under
subsection (e), shall be added to each delinquent fee that is recorded.
(d) Using the lists and instruments prepared under subsection (b)
and recorded under subsection (c), the board shall, not later than ten
(10) days after the list or each individual instrument is recorded
under subsection (c), certify to the county auditor a list of the liens
that remain unpaid for collection in the next May. The county and its
officers and employees are not liable for any material error in the
information on this list.
(e) The board shall release any recorded lien when the delinquent
fees, penalties, service charges, and recording fees have been fully
paid. The county recorder shall charge a fee for releasing the lien in
accordance with IC 36-2-7-10.
(f) Upon receipt of the list under subsection (c), the county auditor
of each county shall add a fifteen dollar ($15) certification fee for
each lot or parcel of real property on which fees are delinquent. The
fee is in addition to all other fees and charges. The county auditor
shall immediately enter on the tax duplicate for the district the
delinquent fees, penalties, service charges, recording fees, and
certification fees, which are due not later than the due date of the
next May installment of property taxes. The county treasurer shall
include any unpaid charges for the delinquent fee, penalty, service
charge, recording fee, and certification fee to the owner or owners of
each lot or parcel of property, at the time the next cycle's property tax
installment is billed.
(g) After certification of liens under subsection (d), the board may
not collect or accept delinquent fees, penalties, service charges,
recording fees, or certification fees from property owners whose
property has been certified to the county auditor.
(h) If a delinquent fee, penalty, service charge, recording fee, and
certification fee are not paid, they shall be collected by the county
treasurer in the same way that delinquent property taxes are
collected.
(i) At the time of each semiannual tax settlement, the county
treasurer shall certify to the county auditor all fees, charges, and
penalties that have been collected. The county auditor shall deduct
the service charges and certification fees collected by the county
treasurer and pay over to the officer the remaining fees and penalties
due the district. The county treasurer shall retain the service charges
and certification fees that have been collected and shall deposit them
in the county general fund.
(j) Fees, penalties, and service charges that were not recorded
before a recorded conveyance shall be removed from the tax roll for
a purchaser who, in the manner prescribed by section 29(e) of this
chapter, files a verified demand with the county auditor.
(k) A board may write off a fee or penalty under subsection (a)
that is less than forty dollars ($40). As added by P.L.131-2005, SEC.2.
IC 8-1.5-5-31 Foreclosure of liens
Sec. 31. (a) A district may foreclose a lien established by this
chapter in order to collect fees and penalties. The district shall
recover the amount of the fees and penalties, and a reasonable
attorney's fee. The court shall order the sale to be made without relief
from valuation or appraisement laws.
(b) Except as otherwise provided by this chapter, actions under
this chapter are subject to the general statutes regarding municipal
public improvement assessments. As added by P.L.131-2005, SEC.3.
IC 8-1.5-5-32 Withdrawal from district by excluded municipality; notice;
outstanding bonds; payments to municipality
Sec. 32. (a) This section applies to excluded cities and towns in
a county containing a consolidated city.
(b) A municipality to which this section applies may withdraw
from the district established by the consolidated city if the municipal
legislative body adopts an ordinance withdrawing the municipality
from the district. The municipal legislative body shall, at least thirty
(30) days before the final vote on the ordinance, mail written notice
of the meeting to the following:
(1) All owners of lots and parcels within the municipality that
are subject to storm water user fees imposed in the district by
the department of public works of the consolidated city.
(2) The department of public works of the consolidated city.
(c) An ordinance described in subsection (b) takes effect sixty
(60) days after adoption by the municipal legislative body.
(d) In addition to the notice required by subsection (b), if a
municipal legislative body adopts an ordinance under subsection (b),
the municipal legislative body shall mail written notice of the
withdrawal from the district to the department of public works of the
consolidated city not more than thirty (30) days after the ordinance
becomes effective.
(e) If on the date of a municipality's withdrawal from the district
there are bonds outstanding that have been issued by the board of
public works of the consolidated city, the municipality is liable for
and shall pay that indebtedness in the same ratio as the assessed
valuation of the property in the municipality bears to the assessed
valuation of all property included in the district on the date one (1)
day before the date of withdrawal, as shown in the most recent
assessment for taxation before the date of withdrawal.
(f) If a municipal legislative body adopts an ordinance under
subsection (b), the municipality is entitled to receive the following:
(1) An annual lump sum payment equal to the total amount of
property taxes paid and allocated to the district's flood debt
service fund from all property taxpayers within the
municipality, to the extent the property taxes are not necessary
to pay the indebtedness owed by the municipality under
subsection (e). A payment under this subdivision is required for
property taxes assessed beginning on the January 1 preceding
the effective date of the municipality's withdrawal from the
district.
(2) The total amount of storm water user fees collected by the
department of public works of the consolidated city from the
lots and parcels in the municipality beginning on the January 1
preceding the effective date of the municipality's withdrawal
from the district.
(g) Payments received under subsection (f):
(1) shall be deposited by the municipality in a dedicated fund;
and
(2) may be used by the municipality only for purposes of storm
water management in the municipality and may not be diverted,
directly or indirectly, in any manner to any use other than the
purposes of storm water management in the municipality. As added by P.L.52-2006, SEC.1 and P.L.175-2006, SEC.1. Amended
by P.L.154-2006, SEC.65.