State Codes and Statutes

Statutes > Missouri > T21 > C319 > 319_029

Notification required prior to excavation.

319.029. Notwithstanding the fact that a project is a preengineeredproject or a permitted project, or that a design request was previouslymade, excavators connected therewith shall be required to give notificationin accordance with sections 319.025 and 319.026 prior to commencement ofexcavation.

(L. 2008 H.B. 1779)

Effective 1-01-09

State Codes and Statutes

Statutes > Missouri > T21 > C319 > 319_029

Notification required prior to excavation.

319.029. Notwithstanding the fact that a project is a preengineeredproject or a permitted project, or that a design request was previouslymade, excavators connected therewith shall be required to give notificationin accordance with sections 319.025 and 319.026 prior to commencement ofexcavation.

(L. 2008 H.B. 1779)

Effective 1-01-09


State Codes and Statutes

State Codes and Statutes

Statutes > Missouri > T21 > C319 > 319_029

Notification required prior to excavation.

319.029. Notwithstanding the fact that a project is a preengineeredproject or a permitted project, or that a design request was previouslymade, excavators connected therewith shall be required to give notificationin accordance with sections 319.025 and 319.026 prior to commencement ofexcavation.

(L. 2008 H.B. 1779)

Effective 1-01-09