State Codes and Statutes
Statutes > Nevada > Title-22 > Chapter-278 > General-provisions > 278-0195278.0195 “Utility project” defined. “Utility project” means:
1. An electric transmission line which is designed to operate at 200 kilovolts or more; or
2. A line used to transport natural gas which operates at 20 percent or more of the specified minimum yield strength of the material from which the line is constructed,
Ê which has been approved for construction after October 1, 1991, by the State or Federal Government or a governing body.
(Added to NRS by 1993, 2558)