4928.66 Implementing energy efficiency programs.

(A)(1)(a) Beginning in 2009, an electric distribution utility shall implement energy efficiency programs that achieve energy savings equivalent to at least three-tenths of one per cent of the total, annual average, and normalized kilowatt-hour sales of the electric distribution utility during the preceding three calendar years to customers in this state. The savings requirement, using such a three-year average, shall increase to an additional five-tenths of one per cent in 2010, seven-tenths of one per cent in 2011, eight-tenths of one per cent in 2012, nine-tenths of one per cent in 2013, one per cent from 2014 to 2018, and two per cent each year thereafter, achieving a cumulative, annual energy savings in excess of twenty-two per cent by the end of 2025.

(b) Beginning in 2009, an electric distribution utility shall implement peak demand reduction programs designed to achieve a one per cent reduction in peak demand in 2009 and an additional seventy-five hundredths of one per cent reduction each year through 2018. In 2018, the standing committees in the house of representatives and the senate primarily dealing with energy issues shall make recommendations to the general assembly regarding future peak demand reduction targets.

(2) For the purposes of divisions (A)(1)(a) and (b) of this section:

(a) The baseline for energy savings under division (A)(1)(a) of this section shall be the average of the total kilowatt hours the electric distribution utility sold in the preceding three calendar years, and the baseline for a peak demand reduction under division (A)(1)(b) of this section shall be the average peak demand on the utility in the preceding three calendar years, except that the commission may reduce either baseline to adjust for new economic growth in the utility’s certified territory.

(b) The commission may amend the benchmarks set forth in division (A)(1)(a) or (b) of this section if, after application by the electric distribution utility, the commission determines that the amendment is necessary because the utility cannot reasonably achieve the benchmarks due to regulatory, economic, or technological reasons beyond its reasonable control.

(c) Compliance with divisions (A)(1)(a) and (b) of this section shall be measured by including the effects of all demand-response programs for mercantile customers of the subject electric distribution utility and all such mercantile customer-sited energy efficiency and peak demand reduction programs, adjusted upward by the appropriate loss factors. Any mechanism designed to recover the cost of energy efficiency and peak demand reduction programs under divisions (A)(1)(a) and (b) of this section may exempt mercantile customers that commit their demand-response or other customer-sited capabilities, whether existing or new, for integration into the electric distribution utility’s demand-response, energy efficiency, or peak demand reduction programs, if the commission determines that that exemption reasonably encourages such customers to commit those capabilities to those programs. If a mercantile customer makes such existing or new demand-response, energy efficiency, or peak demand reduction capability available to an electric distribution utility pursuant to division (A)(2)(c) of this section, the electric utility’s baseline under division (A)(2)(a) of this section shall be adjusted to exclude the effects of all such demand-response, energy efficiency, or peak demand reduction programs that may have existed during the period used to establish the baseline. The baseline also shall be normalized for changes in numbers of customers, sales, weather, peak demand, and other appropriate factors so that the compliance measurement is not unduly influenced by factors outside the control of the electric distribution utility.

(d) Programs implemented by a utility may include demand-response programs, customer-sited programs, and transmission and distribution infrastructure improvements that reduce line losses. Division (A)(2)(c) of this section shall be applied to include facilitating efforts by a mercantile customer or group of those customers to offer customer-sited demand-response, energy efficiency, or peak demand reduction capabilities to the electric distribution utility as part of a reasonable arrangement submitted to the commission pursuant to section 4905.31 of the Revised Code.

(e) No programs or improvements described in division (A)(2)(d) of this section shall conflict with any statewide building code adopted by the board of building standards.

(B) In accordance with rules it shall adopt, the public utilities commission shall produce and docket at the commission an annual report containing the results of its verification of the annual levels of energy efficiency and of peak demand reductions achieved by each electric distribution utility pursuant to division (A) of this section. A copy of the report shall be provided to the consumers’ counsel.

(C) If the commission determines, after notice and opportunity for hearing and based upon its report under division (B) of this section, that an electric distribution utility has failed to comply with an energy efficiency or peak demand reduction requirement of division (A) of this section, the commission shall assess a forfeiture on the utility as provided under sections 4905.55 to 4905.60 and 4905.64 of the Revised Code, either in the amount, per day per undercompliance or noncompliance, relative to the period of the report, equal to that prescribed for noncompliances under section 4905.54 of the Revised Code, or in an amount equal to the then existing market value of one renewable energy credit per megawatt hour of undercompliance or noncompliance. Revenue from any forfeiture assessed under this division shall be deposited to the credit of the advanced energy fund created under section 4928.61 of the Revised Code.

(D) The commission may establish rules regarding the content of an application by an electric distribution utility for commission approval of a revenue decoupling mechanism under this division. Such an application shall not be considered an application to increase rates and may be included as part of a proposal to establish, continue, or expand energy efficiency or conservation programs. The commission by order may approve an application under this division if it determines both that the revenue decoupling mechanism provides for the recovery of revenue that otherwise may be foregone by the utility as a result of or in connection with the implementation by the electric distribution utility of any energy efficiency or energy conservation programs and reasonably aligns the interests of the utility and of its customers in favor of those programs.

(E) The commission additionally shall adopt rules that require an electric distribution utility to provide a customer upon request with two years’ consumption data in an accessible form.

Effective Date: 2008 SB221 07-31-2008

State Codes and Statutes

Statutes > Ohio > Title49 > Chapter4928 > 4928_66

4928.66 Implementing energy efficiency programs.

(A)(1)(a) Beginning in 2009, an electric distribution utility shall implement energy efficiency programs that achieve energy savings equivalent to at least three-tenths of one per cent of the total, annual average, and normalized kilowatt-hour sales of the electric distribution utility during the preceding three calendar years to customers in this state. The savings requirement, using such a three-year average, shall increase to an additional five-tenths of one per cent in 2010, seven-tenths of one per cent in 2011, eight-tenths of one per cent in 2012, nine-tenths of one per cent in 2013, one per cent from 2014 to 2018, and two per cent each year thereafter, achieving a cumulative, annual energy savings in excess of twenty-two per cent by the end of 2025.

(b) Beginning in 2009, an electric distribution utility shall implement peak demand reduction programs designed to achieve a one per cent reduction in peak demand in 2009 and an additional seventy-five hundredths of one per cent reduction each year through 2018. In 2018, the standing committees in the house of representatives and the senate primarily dealing with energy issues shall make recommendations to the general assembly regarding future peak demand reduction targets.

(2) For the purposes of divisions (A)(1)(a) and (b) of this section:

(a) The baseline for energy savings under division (A)(1)(a) of this section shall be the average of the total kilowatt hours the electric distribution utility sold in the preceding three calendar years, and the baseline for a peak demand reduction under division (A)(1)(b) of this section shall be the average peak demand on the utility in the preceding three calendar years, except that the commission may reduce either baseline to adjust for new economic growth in the utility’s certified territory.

(b) The commission may amend the benchmarks set forth in division (A)(1)(a) or (b) of this section if, after application by the electric distribution utility, the commission determines that the amendment is necessary because the utility cannot reasonably achieve the benchmarks due to regulatory, economic, or technological reasons beyond its reasonable control.

(c) Compliance with divisions (A)(1)(a) and (b) of this section shall be measured by including the effects of all demand-response programs for mercantile customers of the subject electric distribution utility and all such mercantile customer-sited energy efficiency and peak demand reduction programs, adjusted upward by the appropriate loss factors. Any mechanism designed to recover the cost of energy efficiency and peak demand reduction programs under divisions (A)(1)(a) and (b) of this section may exempt mercantile customers that commit their demand-response or other customer-sited capabilities, whether existing or new, for integration into the electric distribution utility’s demand-response, energy efficiency, or peak demand reduction programs, if the commission determines that that exemption reasonably encourages such customers to commit those capabilities to those programs. If a mercantile customer makes such existing or new demand-response, energy efficiency, or peak demand reduction capability available to an electric distribution utility pursuant to division (A)(2)(c) of this section, the electric utility’s baseline under division (A)(2)(a) of this section shall be adjusted to exclude the effects of all such demand-response, energy efficiency, or peak demand reduction programs that may have existed during the period used to establish the baseline. The baseline also shall be normalized for changes in numbers of customers, sales, weather, peak demand, and other appropriate factors so that the compliance measurement is not unduly influenced by factors outside the control of the electric distribution utility.

(d) Programs implemented by a utility may include demand-response programs, customer-sited programs, and transmission and distribution infrastructure improvements that reduce line losses. Division (A)(2)(c) of this section shall be applied to include facilitating efforts by a mercantile customer or group of those customers to offer customer-sited demand-response, energy efficiency, or peak demand reduction capabilities to the electric distribution utility as part of a reasonable arrangement submitted to the commission pursuant to section 4905.31 of the Revised Code.

(e) No programs or improvements described in division (A)(2)(d) of this section shall conflict with any statewide building code adopted by the board of building standards.

(B) In accordance with rules it shall adopt, the public utilities commission shall produce and docket at the commission an annual report containing the results of its verification of the annual levels of energy efficiency and of peak demand reductions achieved by each electric distribution utility pursuant to division (A) of this section. A copy of the report shall be provided to the consumers’ counsel.

(C) If the commission determines, after notice and opportunity for hearing and based upon its report under division (B) of this section, that an electric distribution utility has failed to comply with an energy efficiency or peak demand reduction requirement of division (A) of this section, the commission shall assess a forfeiture on the utility as provided under sections 4905.55 to 4905.60 and 4905.64 of the Revised Code, either in the amount, per day per undercompliance or noncompliance, relative to the period of the report, equal to that prescribed for noncompliances under section 4905.54 of the Revised Code, or in an amount equal to the then existing market value of one renewable energy credit per megawatt hour of undercompliance or noncompliance. Revenue from any forfeiture assessed under this division shall be deposited to the credit of the advanced energy fund created under section 4928.61 of the Revised Code.

(D) The commission may establish rules regarding the content of an application by an electric distribution utility for commission approval of a revenue decoupling mechanism under this division. Such an application shall not be considered an application to increase rates and may be included as part of a proposal to establish, continue, or expand energy efficiency or conservation programs. The commission by order may approve an application under this division if it determines both that the revenue decoupling mechanism provides for the recovery of revenue that otherwise may be foregone by the utility as a result of or in connection with the implementation by the electric distribution utility of any energy efficiency or energy conservation programs and reasonably aligns the interests of the utility and of its customers in favor of those programs.

(E) The commission additionally shall adopt rules that require an electric distribution utility to provide a customer upon request with two years’ consumption data in an accessible form.

Effective Date: 2008 SB221 07-31-2008


State Codes and Statutes

State Codes and Statutes

Statutes > Ohio > Title49 > Chapter4928 > 4928_66

4928.66 Implementing energy efficiency programs.

(A)(1)(a) Beginning in 2009, an electric distribution utility shall implement energy efficiency programs that achieve energy savings equivalent to at least three-tenths of one per cent of the total, annual average, and normalized kilowatt-hour sales of the electric distribution utility during the preceding three calendar years to customers in this state. The savings requirement, using such a three-year average, shall increase to an additional five-tenths of one per cent in 2010, seven-tenths of one per cent in 2011, eight-tenths of one per cent in 2012, nine-tenths of one per cent in 2013, one per cent from 2014 to 2018, and two per cent each year thereafter, achieving a cumulative, annual energy savings in excess of twenty-two per cent by the end of 2025.

(b) Beginning in 2009, an electric distribution utility shall implement peak demand reduction programs designed to achieve a one per cent reduction in peak demand in 2009 and an additional seventy-five hundredths of one per cent reduction each year through 2018. In 2018, the standing committees in the house of representatives and the senate primarily dealing with energy issues shall make recommendations to the general assembly regarding future peak demand reduction targets.

(2) For the purposes of divisions (A)(1)(a) and (b) of this section:

(a) The baseline for energy savings under division (A)(1)(a) of this section shall be the average of the total kilowatt hours the electric distribution utility sold in the preceding three calendar years, and the baseline for a peak demand reduction under division (A)(1)(b) of this section shall be the average peak demand on the utility in the preceding three calendar years, except that the commission may reduce either baseline to adjust for new economic growth in the utility’s certified territory.

(b) The commission may amend the benchmarks set forth in division (A)(1)(a) or (b) of this section if, after application by the electric distribution utility, the commission determines that the amendment is necessary because the utility cannot reasonably achieve the benchmarks due to regulatory, economic, or technological reasons beyond its reasonable control.

(c) Compliance with divisions (A)(1)(a) and (b) of this section shall be measured by including the effects of all demand-response programs for mercantile customers of the subject electric distribution utility and all such mercantile customer-sited energy efficiency and peak demand reduction programs, adjusted upward by the appropriate loss factors. Any mechanism designed to recover the cost of energy efficiency and peak demand reduction programs under divisions (A)(1)(a) and (b) of this section may exempt mercantile customers that commit their demand-response or other customer-sited capabilities, whether existing or new, for integration into the electric distribution utility’s demand-response, energy efficiency, or peak demand reduction programs, if the commission determines that that exemption reasonably encourages such customers to commit those capabilities to those programs. If a mercantile customer makes such existing or new demand-response, energy efficiency, or peak demand reduction capability available to an electric distribution utility pursuant to division (A)(2)(c) of this section, the electric utility’s baseline under division (A)(2)(a) of this section shall be adjusted to exclude the effects of all such demand-response, energy efficiency, or peak demand reduction programs that may have existed during the period used to establish the baseline. The baseline also shall be normalized for changes in numbers of customers, sales, weather, peak demand, and other appropriate factors so that the compliance measurement is not unduly influenced by factors outside the control of the electric distribution utility.

(d) Programs implemented by a utility may include demand-response programs, customer-sited programs, and transmission and distribution infrastructure improvements that reduce line losses. Division (A)(2)(c) of this section shall be applied to include facilitating efforts by a mercantile customer or group of those customers to offer customer-sited demand-response, energy efficiency, or peak demand reduction capabilities to the electric distribution utility as part of a reasonable arrangement submitted to the commission pursuant to section 4905.31 of the Revised Code.

(e) No programs or improvements described in division (A)(2)(d) of this section shall conflict with any statewide building code adopted by the board of building standards.

(B) In accordance with rules it shall adopt, the public utilities commission shall produce and docket at the commission an annual report containing the results of its verification of the annual levels of energy efficiency and of peak demand reductions achieved by each electric distribution utility pursuant to division (A) of this section. A copy of the report shall be provided to the consumers’ counsel.

(C) If the commission determines, after notice and opportunity for hearing and based upon its report under division (B) of this section, that an electric distribution utility has failed to comply with an energy efficiency or peak demand reduction requirement of division (A) of this section, the commission shall assess a forfeiture on the utility as provided under sections 4905.55 to 4905.60 and 4905.64 of the Revised Code, either in the amount, per day per undercompliance or noncompliance, relative to the period of the report, equal to that prescribed for noncompliances under section 4905.54 of the Revised Code, or in an amount equal to the then existing market value of one renewable energy credit per megawatt hour of undercompliance or noncompliance. Revenue from any forfeiture assessed under this division shall be deposited to the credit of the advanced energy fund created under section 4928.61 of the Revised Code.

(D) The commission may establish rules regarding the content of an application by an electric distribution utility for commission approval of a revenue decoupling mechanism under this division. Such an application shall not be considered an application to increase rates and may be included as part of a proposal to establish, continue, or expand energy efficiency or conservation programs. The commission by order may approve an application under this division if it determines both that the revenue decoupling mechanism provides for the recovery of revenue that otherwise may be foregone by the utility as a result of or in connection with the implementation by the electric distribution utility of any energy efficiency or energy conservation programs and reasonably aligns the interests of the utility and of its customers in favor of those programs.

(E) The commission additionally shall adopt rules that require an electric distribution utility to provide a customer upon request with two years’ consumption data in an accessible form.

Effective Date: 2008 SB221 07-31-2008