341.151 - Calculation of final total cost of building; statement of proposed source of funding.
341.151 Â Calculation of final total cost of building; statement of proposed source of funding.
1. Â The Board shall provide for a system of accounting for the total costs of state buildings throughout their expected useful life, taking into account all expenses of maintenance and operation.
2. Â Each proposal for the construction of a state building must include:
(a) Figures showing the final total cost of the building, which is the sum of:
(1) Initial construction costs; and
(2) Operating costs for the expected useful life of the building, including maintenance, heating, lighting, air-conditioning, personnel and other expenses of operation; and
(b) A statement of the proposed source of funding for the final total cost of the building.
(Added to NRS by 1977, 276; A 1997, 2486)