519A.220 Ā Applicant to complete checklist for permit; contents. Ā The Division shall develop a checklist to be completed by applicants for a permit to engage in a mining operation. The information requested by the checklist must include:

1. Ā Information relating to the plan for reclamation, including:

(a) The proposed subsequent use of the land after the mining operation is completed;

(b) The proposed schedule of reclamation that will be followed;

(c) The proposed topography of the land after the mining operation is completed;

(d) The treatment of slopes created or affected by the mining operation;

(e) The proposed use of impoundments;

(f) The kinds of access roads to be built and the manner of reclamation of road sites;

(g) The methods of drainage that will be used during the mining operation and reclamation;

(h) The revegetation of the land;

(i) The monitoring and maintenance of the reclaimed land that will be performed by the operator;

(j) The reclamation that will be necessary as a result of instream mining;

(k) The effect that reclamation will have on future mining in that area; and

(l) The effect of the reclamation on public safety.

2. Ā Information relating to the mining operation and maps of the area which is required by the regulations adopted by the Commission pursuant to NRS 519A.160.

3. Ā Other information as requested by the Administrator which the Administrator determines is pertinent to the reclamation activities of the mining operation.

(Added to NRS by 1989, 1285)