534.280 - Project for recharge, storage and recovery of water: Annual report to State Engineer.
1. Â Any person who holds a permit for a project must compile and file with the State Engineer annual reports which define the operation of the project and provide such information as the State Engineer requires.
2. Â Each report must contain either a sworn statement or a certification, under penalty of perjury, that the information contained in the report is true and correct according to the best belief and knowledge of the person filing the report.
3. Â The annual report must be maintained on a calendar-year basis for the preceding calendar year. If a person who is required to file an annual report under this section fails to file a report when due, the State Engineer may assess and collect a penalty of $500 for each month or portion of a month that the annual report is delinquent. The total penalty assessed under this subsection must not exceed $5,000.
4. Â The records and reports required to be kept and filed pursuant to this section must be in such form as the State Engineer prescribes.
(Added to NRS by 1987, 1773)