58:11-9.6.Ā  Renewal of permit, prerequisites to
The State department, before it renews any permit, shall be satisfied of theĀ  following facts:

(a) That the approved physical connection has been tested for tightness under prevailing pressure conditions at least every 3 months;

(b) That the approved physical connection has been subjected to an internalĀ  inspection within 6 months prior to the application;Ā  and

(c) That the local board of health, the State department, and the owner of the water supply set forth in section 3 of this act, have determined that the approved physical connection was functioning satisfactorily.

L.1942, c. 308, p. 1141, s. 6.Ā  Amended by L.1966, c. 47, s. 5, eff. May 24, 1966.