25-8-4. Blasting standards; formulas and tables


(a) In all blasting operations, except as otherwise provided in this chapter, the maximum peak particle velocity of any component of ground motion recorded on a three-component seismograph (where the components -- transverse, vertical, and longitudinal -- are arranged mutually perpendicular) shall not exceed two inches per second at the location of any dwelling house, public building, school, church, or commercial or institutional building normally occupied.

(b) For blast-to-structure distance greater than 300 feet, the standard table for maximum charge per delay shall be generated by the formula:

Display Image

State Codes and Statutes

Statutes > Georgia > Title-25 > Chapter-8 > 25-8-4

O.C.G.A. 25-8-4 (2010)
25-8-4. Blasting standards; formulas and tables


(a) In all blasting operations, except as otherwise provided in this chapter, the maximum peak particle velocity of any component of ground motion recorded on a three-component seismograph (where the components -- transverse, vertical, and longitudinal -- are arranged mutually perpendicular) shall not exceed two inches per second at the location of any dwelling house, public building, school, church, or commercial or institutional building normally occupied.

(b) For blast-to-structure distance greater than 300 feet, the standard table for maximum charge per delay shall be generated by the formula:

Display Image

State Codes and Statutes

State Codes and Statutes

Statutes > Georgia > Title-25 > Chapter-8 > 25-8-4

O.C.G.A. 25-8-4 (2010)
25-8-4. Blasting standards; formulas and tables


(a) In all blasting operations, except as otherwise provided in this chapter, the maximum peak particle velocity of any component of ground motion recorded on a three-component seismograph (where the components -- transverse, vertical, and longitudinal -- are arranged mutually perpendicular) shall not exceed two inches per second at the location of any dwelling house, public building, school, church, or commercial or institutional building normally occupied.

(b) For blast-to-structure distance greater than 300 feet, the standard table for maximum charge per delay shall be generated by the formula:

Display Image