   § 23-19.2-11  Percolation tests and groundwater determinations. – Whenever a percolation test and/or ground water determination is required onany property within this state, the registered professional engineer orregistered surveyor conducting the tests shall notify the city or townengineering department where the tests are to be taken, in writing, of the dateand location of the tests, at least seven (7) days prior to the taking of thetests.

State Codes and Statutes

Statutes > Rhode-island > Title-23 > Chapter-23-19-2 > 23-19-2-11

SECTION 23-19.2-11

   § 23-19.2-11  Percolation tests and groundwater determinations. – Whenever a percolation test and/or ground water determination is required onany property within this state, the registered professional engineer orregistered surveyor conducting the tests shall notify the city or townengineering department where the tests are to be taken, in writing, of the dateand location of the tests, at least seven (7) days prior to the taking of thetests.


State Codes and Statutes

State Codes and Statutes

Statutes > Rhode-island > Title-23 > Chapter-23-19-2 > 23-19-2-11

SECTION 23-19.2-11

   § 23-19.2-11  Percolation tests and groundwater determinations. – Whenever a percolation test and/or ground water determination is required onany property within this state, the registered professional engineer orregistered surveyor conducting the tests shall notify the city or townengineering department where the tests are to be taken, in writing, of the dateand location of the tests, at least seven (7) days prior to the taking of thetests.