SECTION 23-27.3-128.5.3

   § 23-27.3-128.5.3  Inspection waiver –Utilization. – The building official may utilize this inspection waiver, in whole or in part,but he or she must cause sufficient plan review and construction inspection bythe building official or staff to insure that:

   (1) The proposed usage and facilities are in conformance withthe municipal zoning ordinances and this code;

   (2) The contractor is maintaining the required constructionsafety;

   (3) The professional engineer or registered architect is, infact, providing the necessary inspections; and

   (4) State approvals for septic systems, wetlands, and FireSafety Code provisions have been submitted to the building official prior tothe issuance of a permit.

State Codes and Statutes

Statutes > Rhode-island > Title-23 > Chapter-23-27-3 > 23-27-3-128-5-3

SECTION 23-27.3-128.5.3

   § 23-27.3-128.5.3  Inspection waiver –Utilization. – The building official may utilize this inspection waiver, in whole or in part,but he or she must cause sufficient plan review and construction inspection bythe building official or staff to insure that:

   (1) The proposed usage and facilities are in conformance withthe municipal zoning ordinances and this code;

   (2) The contractor is maintaining the required constructionsafety;

   (3) The professional engineer or registered architect is, infact, providing the necessary inspections; and

   (4) State approvals for septic systems, wetlands, and FireSafety Code provisions have been submitted to the building official prior tothe issuance of a permit.


State Codes and Statutes

State Codes and Statutes

Statutes > Rhode-island > Title-23 > Chapter-23-27-3 > 23-27-3-128-5-3

SECTION 23-27.3-128.5.3

   § 23-27.3-128.5.3  Inspection waiver –Utilization. – The building official may utilize this inspection waiver, in whole or in part,but he or she must cause sufficient plan review and construction inspection bythe building official or staff to insure that:

   (1) The proposed usage and facilities are in conformance withthe municipal zoning ordinances and this code;

   (2) The contractor is maintaining the required constructionsafety;

   (3) The professional engineer or registered architect is, infact, providing the necessary inspections; and

   (4) State approvals for septic systems, wetlands, and FireSafety Code provisions have been submitted to the building official prior tothe issuance of a permit.