40-10-10. Permit application fee -- Submission of application and reclamation plan-- Determinations, tests, and samplings -- Filing of application -- Insurance required --Blasting plan.
(1) Each application for a surface coal mining and reclamation permit under theprovisions of this chapter shall be accompanied by a fee as determined by the division. The feespecified in this Subsection (1) may not exceed the cost by the division to process and review theapplication.
(2) (a) The permit application and the reclamation plan submitted as part of a permitapplication shall be submitted in the manner, form, and with the content specified by the divisionin its rules, and shall include the names and addresses of:
(i) the permit applicant;
(ii) every legal owner of record of the surface and mineral estate to be mined;
(iii) the holders, of record, of any leasehold interest in the property;
(iv) any purchaser, of record, of the property under a real estate contract;
(v) the operator, if he is a person different from the applicant; and
(vi) the names and addresses of the principals, officers, and resident agent for service ofprocess, if any of these are business entities other than a single proprietor.
(b) (i) A permit application shall include:
(A) an accurate map or plan, to an appropriate scale, clearly showing the land to beaffected as of the date of the application, and the area of land within the permit area upon whichthe applicant has the legal right to enter and commence surface mining operations; and
(B) a statement of those documents upon which the applicant bases his legal right toenter and commence surface mining operations on the area affected, and whether that right is thesubject of pending court litigation.
(ii) This chapter may not be construed as vesting in the division the jurisdiction toadjudicate property title disputes.
(c) (i) A permit application shall also include a:
(A) determination of the probable hydrologic consequences of the mining andreclamation operations, both on and off the mine site with respect to the hydrologic regime;
(B) determination of the quantity and quality of water in surface and groundwatersystems, including the dissolved and suspended solids under seasonal flow conditions; and
(C) collection of sufficient data for the mine site and surrounding areas so that anassessment can be made by the division of the probable cumulative impacts of all anticipatedmining in the area upon the hydrology of the area and, particularly, upon water availability.
(ii) The determination required under Subsection (2)(c)(i) shall not be required until thehydrologic information on the general area prior to mining is made available from an appropriatefederal or state agency.
(iii) The permit shall not be approved until the information required under this section isavailable and is incorporated into the application.
(d) (i) A permit application will also include the following information:
(A) the result of test borings or core samplings from the permit area, including logs ofthe drill holes;
(B) the thickness of the coal seam found;
(C) an analysis of the chemical properties of the coal;
(D) the sulfur content of any coal seam;


(E) chemical analysis of potentially acid or toxic-forming sections of the overburden; and
(F) chemical analysis of the stratum lying immediately underneath the coal to be mined.
(ii) Application requirements of Subsection (2)(d)(i) may be waived by the division ifthere is a written determination that these requirements are unnecessary.
(3) (a) If the division finds that the probable total annual production at all locations of acoal surface mining operator will not exceed 300,000 tons, and if funding is available under theSurface Mining Control and Reclamation Act of 1977, 30 U.S.C. Sec. 1201 et seq., the cost ofthe following activities shall be paid by the division, upon the written request of the operator inconnection with a permit application:
(i) the determination of probable hydrologic consequences required by Subsection (2)(c),including the engineering analyses and designs necessary for the determination;
(ii) the development of cross-section maps and plans of the land to be affected, includingthe area to be mined;
(iii) the geologic drilling and statement of results of test borings and core samplingsrequired by Subsection (2)(d);
(iv) the collection of archaeological and historical information required by the division,and the preparation of those plans;
(v) preblast surveys required by Subsection 40-10-17(2)(o); and
(vi) the collection of site-specific resource information and production of protection andenhancement plans for fish and wildlife habitats and other environmental values required by thedivision under this act.
(b) The activities specified in Subsection (3)(a) shall be performed by a qualified publicor private laboratory or other qualified public or private entity designated by the division.
(c) A coal operator who has received assistance pursuant to this Subsection (3) shallreimburse the division for the cost of the services rendered, if the division finds that theoperator's actual and attributed annual production of coal for all locations exceeds 300,000 tonsduring the 12 months immediately following the date on which the operator is issued the surfacecoal mining and reclamation permit.
(4) (a) Information pertaining to coal seams, test borings, core samplings, or soil samplesor other equivalent information, as required by this section, shall be made available to a personwhose interest is, or may be, adversely affected.
(b) Information which pertains only to the analysis of the chemical and physicalproperties of the coal, except information regarding any mineral or elemental content which ispotentially toxic to the environment, shall be kept confidential and not made a matter of publicrecord.
(5) An applicant for a surface coal mining and reclamation permit shall file a copy of theapplication for public inspection with the county clerk of the county, or an appropriate publicoffice approved by the division where the mining is proposed to occur, except for informationpertaining to the coal seam itself.
(6) (a) An applicant for a permit shall be required to submit to the division as part of thepermit application a certificate issued by an insurance company, authorized to do business in thestate, certifying that the applicant has a public liability insurance policy in force for the surfacemining and reclamation operation for which the permit is sought, or evidence that the applicanthas satisfied other state or federal self-insurance requirements.
(b) The policy shall:


(i) provide for personal injury and property damage protection in an amount adequate tocompensate any persons damaged as a result of surface coal mining and reclamation operations,including the use of explosives, and entitled to compensation under the applicable provisions ofstate law; and
(ii) be maintained in full force and effect during the terms of the permit or any renewal,including the length of all reclamation operations.
(7) An applicant for a surface coal mining and reclamation permit shall submit to thedivision, as part of the permit application, a blasting plan which shall outline the procedures andstandards by which the operator will meet the provisions of Subsection 40-10-17(2)(o).

Amended by Chapter 27, 2006 General Session

State Codes and Statutes

Statutes > Utah > Title-40 > Chapter-10 > 40-10-10

40-10-10. Permit application fee -- Submission of application and reclamation plan-- Determinations, tests, and samplings -- Filing of application -- Insurance required --Blasting plan.
(1) Each application for a surface coal mining and reclamation permit under theprovisions of this chapter shall be accompanied by a fee as determined by the division. The feespecified in this Subsection (1) may not exceed the cost by the division to process and review theapplication.
(2) (a) The permit application and the reclamation plan submitted as part of a permitapplication shall be submitted in the manner, form, and with the content specified by the divisionin its rules, and shall include the names and addresses of:
(i) the permit applicant;
(ii) every legal owner of record of the surface and mineral estate to be mined;
(iii) the holders, of record, of any leasehold interest in the property;
(iv) any purchaser, of record, of the property under a real estate contract;
(v) the operator, if he is a person different from the applicant; and
(vi) the names and addresses of the principals, officers, and resident agent for service ofprocess, if any of these are business entities other than a single proprietor.
(b) (i) A permit application shall include:
(A) an accurate map or plan, to an appropriate scale, clearly showing the land to beaffected as of the date of the application, and the area of land within the permit area upon whichthe applicant has the legal right to enter and commence surface mining operations; and
(B) a statement of those documents upon which the applicant bases his legal right toenter and commence surface mining operations on the area affected, and whether that right is thesubject of pending court litigation.
(ii) This chapter may not be construed as vesting in the division the jurisdiction toadjudicate property title disputes.
(c) (i) A permit application shall also include a:
(A) determination of the probable hydrologic consequences of the mining andreclamation operations, both on and off the mine site with respect to the hydrologic regime;
(B) determination of the quantity and quality of water in surface and groundwatersystems, including the dissolved and suspended solids under seasonal flow conditions; and
(C) collection of sufficient data for the mine site and surrounding areas so that anassessment can be made by the division of the probable cumulative impacts of all anticipatedmining in the area upon the hydrology of the area and, particularly, upon water availability.
(ii) The determination required under Subsection (2)(c)(i) shall not be required until thehydrologic information on the general area prior to mining is made available from an appropriatefederal or state agency.
(iii) The permit shall not be approved until the information required under this section isavailable and is incorporated into the application.
(d) (i) A permit application will also include the following information:
(A) the result of test borings or core samplings from the permit area, including logs ofthe drill holes;
(B) the thickness of the coal seam found;
(C) an analysis of the chemical properties of the coal;
(D) the sulfur content of any coal seam;


(E) chemical analysis of potentially acid or toxic-forming sections of the overburden; and
(F) chemical analysis of the stratum lying immediately underneath the coal to be mined.
(ii) Application requirements of Subsection (2)(d)(i) may be waived by the division ifthere is a written determination that these requirements are unnecessary.
(3) (a) If the division finds that the probable total annual production at all locations of acoal surface mining operator will not exceed 300,000 tons, and if funding is available under theSurface Mining Control and Reclamation Act of 1977, 30 U.S.C. Sec. 1201 et seq., the cost ofthe following activities shall be paid by the division, upon the written request of the operator inconnection with a permit application:
(i) the determination of probable hydrologic consequences required by Subsection (2)(c),including the engineering analyses and designs necessary for the determination;
(ii) the development of cross-section maps and plans of the land to be affected, includingthe area to be mined;
(iii) the geologic drilling and statement of results of test borings and core samplingsrequired by Subsection (2)(d);
(iv) the collection of archaeological and historical information required by the division,and the preparation of those plans;
(v) preblast surveys required by Subsection 40-10-17(2)(o); and
(vi) the collection of site-specific resource information and production of protection andenhancement plans for fish and wildlife habitats and other environmental values required by thedivision under this act.
(b) The activities specified in Subsection (3)(a) shall be performed by a qualified publicor private laboratory or other qualified public or private entity designated by the division.
(c) A coal operator who has received assistance pursuant to this Subsection (3) shallreimburse the division for the cost of the services rendered, if the division finds that theoperator's actual and attributed annual production of coal for all locations exceeds 300,000 tonsduring the 12 months immediately following the date on which the operator is issued the surfacecoal mining and reclamation permit.
(4) (a) Information pertaining to coal seams, test borings, core samplings, or soil samplesor other equivalent information, as required by this section, shall be made available to a personwhose interest is, or may be, adversely affected.
(b) Information which pertains only to the analysis of the chemical and physicalproperties of the coal, except information regarding any mineral or elemental content which ispotentially toxic to the environment, shall be kept confidential and not made a matter of publicrecord.
(5) An applicant for a surface coal mining and reclamation permit shall file a copy of theapplication for public inspection with the county clerk of the county, or an appropriate publicoffice approved by the division where the mining is proposed to occur, except for informationpertaining to the coal seam itself.
(6) (a) An applicant for a permit shall be required to submit to the division as part of thepermit application a certificate issued by an insurance company, authorized to do business in thestate, certifying that the applicant has a public liability insurance policy in force for the surfacemining and reclamation operation for which the permit is sought, or evidence that the applicanthas satisfied other state or federal self-insurance requirements.
(b) The policy shall:


(i) provide for personal injury and property damage protection in an amount adequate tocompensate any persons damaged as a result of surface coal mining and reclamation operations,including the use of explosives, and entitled to compensation under the applicable provisions ofstate law; and
(ii) be maintained in full force and effect during the terms of the permit or any renewal,including the length of all reclamation operations.
(7) An applicant for a surface coal mining and reclamation permit shall submit to thedivision, as part of the permit application, a blasting plan which shall outline the procedures andstandards by which the operator will meet the provisions of Subsection 40-10-17(2)(o).

Amended by Chapter 27, 2006 General Session


State Codes and Statutes

State Codes and Statutes

Statutes > Utah > Title-40 > Chapter-10 > 40-10-10

40-10-10. Permit application fee -- Submission of application and reclamation plan-- Determinations, tests, and samplings -- Filing of application -- Insurance required --Blasting plan.
(1) Each application for a surface coal mining and reclamation permit under theprovisions of this chapter shall be accompanied by a fee as determined by the division. The feespecified in this Subsection (1) may not exceed the cost by the division to process and review theapplication.
(2) (a) The permit application and the reclamation plan submitted as part of a permitapplication shall be submitted in the manner, form, and with the content specified by the divisionin its rules, and shall include the names and addresses of:
(i) the permit applicant;
(ii) every legal owner of record of the surface and mineral estate to be mined;
(iii) the holders, of record, of any leasehold interest in the property;
(iv) any purchaser, of record, of the property under a real estate contract;
(v) the operator, if he is a person different from the applicant; and
(vi) the names and addresses of the principals, officers, and resident agent for service ofprocess, if any of these are business entities other than a single proprietor.
(b) (i) A permit application shall include:
(A) an accurate map or plan, to an appropriate scale, clearly showing the land to beaffected as of the date of the application, and the area of land within the permit area upon whichthe applicant has the legal right to enter and commence surface mining operations; and
(B) a statement of those documents upon which the applicant bases his legal right toenter and commence surface mining operations on the area affected, and whether that right is thesubject of pending court litigation.
(ii) This chapter may not be construed as vesting in the division the jurisdiction toadjudicate property title disputes.
(c) (i) A permit application shall also include a:
(A) determination of the probable hydrologic consequences of the mining andreclamation operations, both on and off the mine site with respect to the hydrologic regime;
(B) determination of the quantity and quality of water in surface and groundwatersystems, including the dissolved and suspended solids under seasonal flow conditions; and
(C) collection of sufficient data for the mine site and surrounding areas so that anassessment can be made by the division of the probable cumulative impacts of all anticipatedmining in the area upon the hydrology of the area and, particularly, upon water availability.
(ii) The determination required under Subsection (2)(c)(i) shall not be required until thehydrologic information on the general area prior to mining is made available from an appropriatefederal or state agency.
(iii) The permit shall not be approved until the information required under this section isavailable and is incorporated into the application.
(d) (i) A permit application will also include the following information:
(A) the result of test borings or core samplings from the permit area, including logs ofthe drill holes;
(B) the thickness of the coal seam found;
(C) an analysis of the chemical properties of the coal;
(D) the sulfur content of any coal seam;


(E) chemical analysis of potentially acid or toxic-forming sections of the overburden; and
(F) chemical analysis of the stratum lying immediately underneath the coal to be mined.
(ii) Application requirements of Subsection (2)(d)(i) may be waived by the division ifthere is a written determination that these requirements are unnecessary.
(3) (a) If the division finds that the probable total annual production at all locations of acoal surface mining operator will not exceed 300,000 tons, and if funding is available under theSurface Mining Control and Reclamation Act of 1977, 30 U.S.C. Sec. 1201 et seq., the cost ofthe following activities shall be paid by the division, upon the written request of the operator inconnection with a permit application:
(i) the determination of probable hydrologic consequences required by Subsection (2)(c),including the engineering analyses and designs necessary for the determination;
(ii) the development of cross-section maps and plans of the land to be affected, includingthe area to be mined;
(iii) the geologic drilling and statement of results of test borings and core samplingsrequired by Subsection (2)(d);
(iv) the collection of archaeological and historical information required by the division,and the preparation of those plans;
(v) preblast surveys required by Subsection 40-10-17(2)(o); and
(vi) the collection of site-specific resource information and production of protection andenhancement plans for fish and wildlife habitats and other environmental values required by thedivision under this act.
(b) The activities specified in Subsection (3)(a) shall be performed by a qualified publicor private laboratory or other qualified public or private entity designated by the division.
(c) A coal operator who has received assistance pursuant to this Subsection (3) shallreimburse the division for the cost of the services rendered, if the division finds that theoperator's actual and attributed annual production of coal for all locations exceeds 300,000 tonsduring the 12 months immediately following the date on which the operator is issued the surfacecoal mining and reclamation permit.
(4) (a) Information pertaining to coal seams, test borings, core samplings, or soil samplesor other equivalent information, as required by this section, shall be made available to a personwhose interest is, or may be, adversely affected.
(b) Information which pertains only to the analysis of the chemical and physicalproperties of the coal, except information regarding any mineral or elemental content which ispotentially toxic to the environment, shall be kept confidential and not made a matter of publicrecord.
(5) An applicant for a surface coal mining and reclamation permit shall file a copy of theapplication for public inspection with the county clerk of the county, or an appropriate publicoffice approved by the division where the mining is proposed to occur, except for informationpertaining to the coal seam itself.
(6) (a) An applicant for a permit shall be required to submit to the division as part of thepermit application a certificate issued by an insurance company, authorized to do business in thestate, certifying that the applicant has a public liability insurance policy in force for the surfacemining and reclamation operation for which the permit is sought, or evidence that the applicanthas satisfied other state or federal self-insurance requirements.
(b) The policy shall:


(i) provide for personal injury and property damage protection in an amount adequate tocompensate any persons damaged as a result of surface coal mining and reclamation operations,including the use of explosives, and entitled to compensation under the applicable provisions ofstate law; and
(ii) be maintained in full force and effect during the terms of the permit or any renewal,including the length of all reclamation operations.
(7) An applicant for a surface coal mining and reclamation permit shall submit to thedivision, as part of the permit application, a blasting plan which shall outline the procedures andstandards by which the operator will meet the provisions of Subsection 40-10-17(2)(o).

Amended by Chapter 27, 2006 General Session