Steam electric generating plant β€” Study β€” Construction.

The director shall continue the study of the state power commission made in 1956 relating to the construction of a steam power electric generating plant, and if the construction of a steam electric generating plant is found to be feasible by the director, the director may construct such plant at a site determined by him or her to be feasible and operate it as a state owned facility.

[2009 c 549 Β§ 5088; 1988 c 127 Β§ 10; 1965 c 8 Β§ 43.21.250. Prior: 1957 c 275 Β§ 3. Formerly RCW 43.21.250.]