Period covered by stumpage lien.

The person granting the privilege mentioned in RCW 60.24.035 is only entitled to the lien as provided therein for saw logs, spars, piles and other timber cut during the eight months next preceding the filing of the claim, as herein provided in RCW 60.24.075.

[1893 c 132 ยง 6; RRS ยง 1167. Prior: Code 1881 ยง 1946; 1877 p 217 ยง 8.]