State Codes and Statutes
Statutes > New-york > Pba > Article-8 > Title-9 > 1881§ 1881. High phase order electric transmission research project. The purpose of this project shall be to convert an existing transmission line to a high phase order line, carry out test and operation procedures and provide results of these procedures for evaluation.